Transport layer is responsible for delivering data to the appropriate application process on the host computers. The two most popular transport layer protocols are Transmission Control Protocol (TCP) and User Datagram Protocol (UDP). TCP is considered one of the most important protocols in the Internet. UDP is a minimal message-oriented Transport Layer protocol. In this paper we have compared the performance of TCP and UDP on the wired network. Network Simulator (NS2) has been used for performance Comparison since it is preferred by the networking research community. Constant bit rate (CBR) traffic used for both TCP and UDP protocols.
Cooperation spectrum sensing in cognitive radio networks has an analogy to a distributed decision in wireless sensor networks, where each sensor make local decision and those decision result are reported to a fusion center to give the final decision according to some fusion rules. In this paper the performance of cooperative spectrum sensing examines using new optimization strategy to find optimal weight and threshold curves that enables each secondary user senses the spectrum environment independently according to a floating threshold with respect to his local environment. Our proposed approach depends on proving the convexity of the famous optimization problem in cooperative spectrum sensing that stated maximizing the probability of detec
... Show MoreExperimental and theoretical investigations are presented on flocculation process in pulsator clarifier. Experimental system was designed to study the factors that affecting the performance of pulsator clarifier. These factors were water level in vacuum chamber which range from 60 to 150 cm , rising time of water in vacuum chamber which having times of 20,30 & 40 seconds , and sludge blanket height which having heights of 20,30 & 40 cm .The turbidity and pH of raw water used were 200 NTU and 8.13 respectively. According to the jar test, the alum dose required for this turbidity was 20 mg/l .The performance parameters of pulsator clarifier such as , turbidity ,total solid TS , shear rate , volume concentration of sludge blanket an
... Show MoreThe Incentives legislation aims to raise the efficiency of job performance of all kinds through optimal investment of human resources and their capabilities to raise or increase and production influence and provide distinguished and creative services such as The Incentives Law of Productive Ministries Employees No. 20 of 1993 and instructions issued by ministries and relevant Facilities regarding incentives for their affiliates based on provisions Public Companies Law and the instructions of the Higher Education Fund issued by the Ministry of Higher Education and Scientific Research. The human element is the most unstable and complex element of production as it is characterized by a set of feelings and emotions that is expresses
... Show MoreEarth dams are constructed mainly from soil. A homogenous earth dam is composed of only one material. The seepage through such dams is quite high. Upstream impervious blanket is one of the methods used to control seepage through the dam foundations. Bennet's method is one of the commonly used methods to design an impervious upstream blanket. Design charts are developed relating the length of blanket, total reservoir head, total base width of the dam (excluding downstream drainage), the coefficient of permeability of the blanket material, blanket thickness, foundation thickness, and coefficient of permeability of the foundation soil, based on the equations governing the Bennet's method for a homogenous earth dam with a blanket of uniform
... Show MoreDiverting river flow during construction of a main dam involves the construction of cofferdams, and tunnels, channels or other temporary passages. Diversion channels are commonly used in wide valleys where the high flow makes tunnels or culverts uneconomic. The diversion works must form part of the overall project design since it will have a major impact on its cost, as well as on the design, construction program and overall cost of the permanent works. Construction costs contain of excavation, lining of the channel, and construction of upstream and downstream cofferdams. The optimization model was applied to obtain optimalchannel cross section, height of upstream cofferdam, and height of downstream cofferdamwith minimum construction cost
... Show More

