Objective: This study aims to assess the level of nurse's knowledge regarding toxoplasmosis management
in pregnant women.
Methodology: A descriptive analytic study was carried out from January 2012 to March 2012. A sample of
(70)nurses who provide prenatal care to pregnant women at primary health care centers of AL-Adala,ALHindia,AL-Askary,AL-Jamea,AL-Ansar
and AL-Salam in AL-Najaf city. The questionnaire was self-completed
and included questions on sociodemographic characteristics and toxoplasmosis aspects.
Results: The findings of the study indicated that (44.3%) of nurses have moderate level of knowledge.
(32.9%) of nurses was with age ranging from 31-36 years. (74.3%) were male. (52.9%) were secondary
graduate,(31.4) were institute graduates, regarding the training sessions the majority of nurses
(84.3%)have no training sessions, (34.3%) of nurses who were included in the study have duration of
experience ranging from 7-13 years. Highly significant relation between nurse‘s level of knowledge and
their age and years of experience (0.009, 0.024) respectively
Recommendations: The study recommended that: it is necessary to join all nurses who work in prenatal
care units in workshop training, continuing education sessions regarding toxoplasmosis aspects and other
mother –child issues to improve health awareness. Another study should be conducted to investigate the
association between the prevalence of toxoplasmosis and affectivity of prenatal care in preventing
toxoplasmosis.
The unpredictable and huge data generation nowadays by smart computing devices like (Sensors, Actuators, Wi-Fi routers), to handle and maintain their computational processing power in real time environment by centralized cloud platform is difficult because of its limitations, issues and challenges, to overcome these, Cisco introduced the Fog computing paradigm as an alternative for cloud-based computing. This recent IT trend is taking the computing experience to the next level. It is an extended and advantageous extension of the centralized cloud computing technology. In this article, we tried to highlight the various issues that currently cloud computing is facing. Here
... Show MorePurpose: The present study seeks to examine various history stages in which undergone by the concept of scenarios, and development of this concept to integration with the strategic management practices:
Methodology: The current study relied on a literature review and approach in providing total picture of different stages undergone by this concept.
The main results: the scenarios did not reach maturity in their quest for integration with strategic management, and still need a great effort for the maturation of this thought in the framework of strategic management, and through it can contribute in creating important knowledge evolution.
Originality and value: providing a contemporary model linking the roots of this concept and cu
This study aims to design unified electronic information system to manage students attendance in Lebanese French university/Erbil, as a system that simplifies the process of entering and counting the students absence, and generate absence reports to expel students who passed the acceptable limit of being absent, and by that we can replace the traditional way of using papers to count absence, with a complete electronically system for managing students attendance, in a way that makes the results accurate and unchangeable by the students.
In order to achieve the study's objectives, we designed an information syst
... Show MoreAbstract:
The current research included " Diagnosis of the reality of the gap for the requirements of Business Continuity Management System According to International Standard (ISO 22301: 2012) in Midland Refineries Company (Daura Refinery) " , for development of an administrative system for Business Continuity is considered a priority in the present day, and in the light of the organizations dependence on computers and information technology in work and communication with others . the international legitimacy (represented by the international organization for standardization (ISO)) remains the basis for matching and commitment , and the importance of the application of Business Continuity Management Syst
... Show MoreClean water supply is one of the major factors contributing significantly to society’s socio-economic transformation by improving living standards, health, and increasing productivity. It is imperative to plan and construct appropriate water supply systems in modern society, which supply various segments of society with safe drinking water according to their requirements to ensure adequate and quality water supply. In the current study, here was an attempt to develop a model for geographic information systems to manage the assets of the water distribution networks in the Karrada region and to evaluate the network geometrically, and from the results of the engineering analysis of the
This study discusses risk management strategies caused by pandemic-related (Covid-19) suspensions in thirty-six engineering projects of different types and sizes selected from countries in the middle east and especially Iraq. The primary data collection method was a survey and questionnaire completed by selected project crew and laborers. Data were processed using Microsoft Excel to construct models to help decision-makers find solutions to the scheduling problems that may be expected to occur during a pandemic. A theoretical and practical concept for project risk management that addresses a range of global and local issues that affect schedule and cost is presented and results indicate that the most significant delays are due to a
... Show MoreThis study discusses risk management strategies caused by pandemic-related (Covid-19) suspensions in thirty-six engineering projects of different types and sizes selected from countries in the middle east and especially Iraq. The primary data collection method was a survey and questionnaire completed by selected project crew and laborers. Data were processed using Microsoft Excel to construct models to help decision-makers find solutions to the scheduling problems that may be expected to occur during a pandemic. A theoretical and practical concept for project risk management that addresses a range of global and local issues that affect schedule and cost is presented and results indicate that the most significant delays are due to a
... Show MoreAbstract
The project of balad's major sewerage system is one of the biggest projects who is still in progress in salahulddin province provincial - development plan that was approved in 2013 . This project works in two parts ; the 1st is installing the sewerage networks (both of heavy sewerage & rain sewerage) and the 2nd is installing the life – off units (for heavy sewerage & rain sewerage , as well) . the directorate of salahuiddin is aiming that at end of construction it will be able to provide services for four residential quarters , one of the main challenges that project's management experience is how to achieve thes
... Show More