Objective(s): To measure serum C-reactive protein (CRP) titer as a predictive diagnosis of acute hepatitis C virus (HCV)
infection.
Methodology: Two hundred and ten patients with acute HCV infection and 234 apparently healthy individuals as
control group were enrolled in this study in Baghdad medical city (Teaching Laboratories). The patents include
74(35.2%) females and 136 (64.8%) males with mean age (27±16.5) years. The control group includes 114 (48.7%)
females and 120 (51.3%) males with mean age (26±5.8) years. Blood samples were collected from out patients from
Alfadul in Baghdad city. Sera were separated and stored at 20 0
C. The diagnosis of acute HCV infection was based on
detection of HC Ag and anti- HCV IgM and standard liver function tests. Determination of CRP titer was assessed by
semi-quantitative tube agglutination test. All data were statistically analyzed.
Results: Based on 95% percentile, the baseline CRP titer in healthy individuals was 1:8 (16mg/l) and for patients 1:512
(1024mg/l). There was a statistically significant increase in the mean CRP titer in patients with acute HCV infection
compared to healthy individuals (P< 0.001) .The validly of CRP titer 1: 64 as a cut –off value to predict HCV infection
provide a sensitivity and specificity of 100 % and 96% respectively. Furthermore, there was a significant correlation
between CRP titer and liver function test values.
Recommendation:
Therefore, in further studies, we recommends the evaluation of C- reactive protein titer in patients with acute
hepatitis B Virus infection and patients with non–infectious diseases such as cardiovascular disease, diabetes mellitus
and hyperlipidemia infection, and compare between them.
Maulticollinearity is a problem that always occurs when two or more predictor variables are correlated with each other. consist of the breach of one basic assumptions of the ordinary least squares method with biased estimates results, There are several methods which are proposed to handle this problem including the method To address a problem and method To address a problem , In this research a comparisons are employed between the biased method and unbiased method with Bayesian using Gamma distribution method addition to Ordinary Least Square metho
... Show MoreThe control charts are one of the scientific technical statistics tools that will be used to control of production and always contained from three lines central line and upper, lower lines to control quality of production and represents set of numbers so finally the operating productivity under control or nor than depending on the actual observations. Some times to calculating the control charts are not accurate and not confirming, therefore the Fuzzy Control Charts are using instead of Process Control Charts so this method is more sensitive, accurate and economically for assisting decision maker to control the operation system as early time. In this project will be used set data fr
... Show MoreMPEG-DASH is an adaptive bitrate streaming technology that divides video content into small HTTP-objects file segments with different bitrates. With live UHD video streaming latency is the most important problem. In this paper, creating a low-delay streaming system using HTTP 2.0. Based on the network condition the proposed system adaptively determine the bitrate of segments. The video is coded using a layered H.265/HEVC compression standard, then is tested to investigate the relationship between video quality and bitrate for various HEVC parameters and video motion at each layer/resolution. The system architecture includes encoder/decoder configurations and how to embedded the adaptive video streaming. The encoder includes compression besi
... Show MoreConsiderable amounts of domestic and industrial wastewater that should be treated before reuse are discharged into the environment annually. Electrocoagulation is an electrochemical technology in which electrical current is conducted through electrodes, it is mainly used to remove several types of wastewater pollutants, such as dyes, toxic materials, oil content, chemical oxygen demand, and salinity, individually or in combination with other processes. Electrocoagulation technology used in hybrid systems along with other technologies for wastewater treatment are reviewed in this work, and the articles reviewed herein were published from 2018 to 2021. Electrocoagulation is widely employed in integrated systems with other electrochemical tech
... Show Moreأن إحدى اكبر مشاكل الصحة العالمية هي ظهور مقاومة الميكروبية للأدوية الشائعة لذلك هناك حاجة ملحة لمضادات جرثومية جديدة ذات نشاط أحيائي معزز .في هذا الدراسة, تم تحضير خمسة مشتقات جديدة من الكينولين A,B,C,D وEكمضادات جرثومية. تم فحص بنية المركبات المحضرة باستخدام UV light , FTIR NMR . تم استخدام طريقة الانتشار بالحفر في الطبق لاختبار الخصائص المضادة للبكتريا للمركبات المحضرة في المختبر ضد نوعين من البكتريا الموجبة
... Show MoreQuite anumber of parents and educators of this behavior,which is characterized by exaggerating locomotor activity and impulsivity and recklessness and the difficulty of continuing the status of certain bodily more than one minute ,and the difficulty of waiting to meet aparticular need or desire,it also characterized by thos meddling children the affairs of others and increased their chatter does not seem the case when you listen to talk to them and they characterized by weak self-confidence and are more solid and seem un able to keep ther responses because of the severity of anxiety .The research aims to know impulsive behavior among kindergartens children and its relation ship with some variables, and the sa
... Show MoreCost estimation is considered one of the important tasks in the construction projects management. The precise estimation of the construction cost affect on the success and quality of a construction project. Elemental estimation is considered a very important stage to the project team because it represents one of the key project elements. It helps in formulating the basis to strategies and execution plans for construction and engineering. Elemental estimation, which in the early stage, estimates the construction costs depending on . minimum details of the project so that it gives an indication for the initial design stage of a project. This paper studies the factors that affect the elemental cost estimation as well as the rela
... Show More