In this paper, the bi-criteria machine scheduling problems (BMSP) are solved, where the discussed problem is represented by the sum of completion and the sum of late work times simultaneously. In order to solve the suggested BMSP, some metaheurisitc methods are suggested which produce good results. The suggested local search methods are simulated annulling and bees algorithm. The results of the new metaheurisitc methods are compared with the complete enumeration method, which is considered an exact method, then compared results of the heuristics with each other to obtain the most efficient method.
To follow up the response of acute lymphoblastic leukemic
(ALL) patients to chemotherapy treatment and for prognosis, diagnosis, the total Sialic acid (TSA) levels was studied as a tumor marker. The study included 40 patients (male = 22, female =18) with (ALL) were tested for the serum and leukocytes homogenate concentrations of total sialic acid (TSA) before and after treatment with six different chemotherapy protocols. &n
... Show MoreTotal Electron Content measurements derived from Athens station ionograms (ITEC),
located near Iraq, during the ascending phase of solar cycle 24 (July 2009- April 2010),
according to availability of data, are compared with the latest version of the International
Reference Ionosphere model, IRI-2012 (IRI TEC), using two options (NeQuick, IRI01-
Corr) for topside electron density.
The results obtained from both (ITEC and IRI TEC) techniques were similar, where
correlation coefficients between them are very high. Generally, the IRI predictions
overestimate the ITEC values.
Scheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the
... Show MoreThis paper deals with the numerical solution of the discrete classical optimal control problem (DCOCP) governing by linear hyperbolic boundary value problem (LHBVP). The method which is used here consists of: the GFEIM " the Galerkin finite element method in space variable with the implicit finite difference method in time variable" to find the solution of the discrete state equation (DSE) and the solution of its corresponding discrete adjoint equation, where a discrete classical control (DCC) is given. The gradient projection method with either the Armijo method (GPARM) or with the optimal method (GPOSM) is used to solve the minimization problem which is obtained from the necessary conditi
... Show MoreNitrogen (N) and phosphorus (P) are the most important nutrients for crop production. The N contributes to the structural component, generic, and metabolic compounds in a plant cell. N is mainly an essential part of chlorophyll, the compound in the plants that is responsible for photosynthesis process. The plant can get its available nitrogen from the soil by mineralizing organic materials, fixed-N by bacteria, and nitrogen can be released from plant as residue decay. Soil minerals do not release an enough amount of nitrogen to support plant; therefore, fertilizing is necessary for high production. Phosphorous contributes in the complex of the nucleic acid structure of plants. The nucleic acid is essential in protein synthesis regulation; t
... Show MoreThe aim of the present study is to provide the adequate knowledge about the role of time management in facilitate the work requirements for employees of the administrative department at the Ministry of Higher Education and Scientific Research. The research depend on studying four important dimensions which are (time planning, time organization, time direction and time observation). In addition to study other five dimensions which are (new procedures, clear procedures, short procedures, the available information and the simplicity of the methods
used).Questionnaire sheets consist of (38 questions) distributed to (170) employees and (146) sheets only were considered in the study. SPSS program was used
... Show MoreIn this work, the methods (Moments, Modified Moments, L-Moments, Percentile, Rank Set sampling and Maximum Likelihood) were used to estimate the reliability function and the two parameters of the Transmuted Pareto (TP) distribution. We use simulation to generate the required data from three cases this indicates sample size , and it replicates for the real value for parameters, for reliability times values we take .
Results were compared by using mean square error (MSE), the result appears as follows :
The best methods are Modified Moments, Maximum likelihood and L-Moments in first case, second case and third case respectively.
This study aimed new indications that may clarify the relationships between the total and standard lengths, and the length of the otolith, as well as the thickness and weight of these bones compared to the body weights of two different species of invasive fish in the Iraqi aquatic environment, the common carp