The researchers have tried to focus on how to determine the number of pipes that are present in one obtained hyperbola in radargram profile. Ground Penetration Radar (GPR) survey was performed to distinguish between two zero-spaced iron pipes in radargram. The field work was carried out by constructing artificial rectangular models with dimensions of length, width, and depth equal to 10.0, 1.0, 0.65 meter respectively that filled with dry clastic mixture deposit, three twin sets of air filled iron pipes of 15.24 cm (6 inch) diameter were buried horizontally and vertically inside the mixture at different distances together. Visual and Numerical interpretation were chosen to get the best results. In the visual interpretation, the amplitude variations show that the height of the positive peaks increases with the increase of the space distance between the buried pipes. Numerical interpretation appeared that the decrease in the width of the bands means an increase of the space between the pipes. The second part of the numerical analysis comprises measuring the amplitude value variation, among the signal forms; relying on the value of amplitude in each hyperbola the distinction process becomes quite easy. Depending on the variations in amplitude, the identification and discrimination of two closely spaced underground pipes will be feasible. The big values refer to highly spaced pipes while the low values denote the slightly spaced pipes. It is worth mentioning that the lowest value indicates the amplitude of only one buried iron pipe.
The dynamics of a single condensing two-phase bubble of two different dispersed-continuous systems were studied. The systems were, CCl4 - water and CCl4 - 100% glycerol. Cinephotography was used to determine the change in height, diameter and time. These results were used to determine the experimental rise velocity of the bubble, which was compared with a theoretical one based on some equations used. It was found that the velocity of the first system remained almost constant, while it decreased gradually for the second system.
One of the most important problems in the statistical inference is estimating parameters and Reliability parameter and also interval estimation , and testing hypothesis . estimating two parameters of exponential distribution and also reliability parameter in a stress-strength model.
This parameter deals with estimating the scale parameter and the Location parameter µ , of two exponential distribution ,using moments estimator and maximum likelihood estimator , also we estimate the parameter R=pr(x>y), where x,y are two- parameter independent exponential random variables .
Statistical properties of this distribution and its properti
... Show MoreThis study, establishes two stochastic monotonicity results concerning the run length of an upper one –sided Exponentially Weighted Moving Average (EWMA) control charts, based on the logarithm of the sample variance, for monitoring a process standard deviation, these properties cast interesting light on the control chart performance, and their extension to other one –sided EWMA control charts.
Pushover analysis is an efficient method for the seismic evaluation of buildings under severe earthquakes. This paper aims to develop and verify the pushover analysis methodology for reinforced concrete frames. This technique depends on a nonlinear representation of the structure by using SAP2000 software. The properties of plastic hinges will be defined by generating the moment-curvature analysis for all the frame sections (beams and columns). The verification of the technique above was compared with the previous study for two-dimensional frames (4-and 7-story frames). The former study leaned on automatic identification of positive and negative moments, where the concrete sections and steel reinforcement quantities the
... Show MoreIn this paper, we find the two solutions of two dimensional stochastic Fredholm integral equations contain two gamma processes differ by the parameters in two cases and equal in the third are solved by the Adomain decomposition method. As a result of the solutions probability density functions and their variances at the time t are derived by depending upon the maximum variances of each probability density function with respect to the three cases. The auto covariance and the power spectral density functions are also derived. To indicate which of the three cases is the best, the auto correlation coefficients are calculated.
Achieving reliable operation under the influence of deep-submicrometer noise sources including crosstalk noise at low voltage operation is a major challenge for network on chip links. In this paper, we propose a coding scheme that simultaneously addresses crosstalk effects on signal delay and detects up to seven random errors through wire duplication and simple parity checks calculated over the rows and columns of the two-dimensional data. This high error detection capability enables the reduction of operating voltage on the wire leading to energy saving. The results show that the proposed scheme reduces the energy consumption up to 53% as compared to other schemes at iso-reliability performance despite the increase in the overhead number o
... Show MoreThis study discusses risk management strategies caused by pandemic-related (Covid-19) suspensions in thirty-six engineering projects of different types and sizes selected from countries in the middle east and especially Iraq. The primary data collection method was a survey and questionnaire completed by selected project crew and laborers. Data were processed using Microsoft Excel to construct models to help decision-makers find solutions to the scheduling problems that may be expected to occur during a pandemic. A theoretical and practical concept for project risk management that addresses a range of global and local issues that affect schedule and cost is presented and results indicate that the most significant delays are due to a
... Show MoreThis study discusses risk management strategies caused by pandemic-related (Covid-19) suspensions in thirty-six engineering projects of different types and sizes selected from countries in the middle east and especially Iraq. The primary data collection method was a survey and questionnaire completed by selected project crew and laborers. Data were processed using Microsoft Excel to construct models to help decision-makers find solutions to the scheduling problems that may be expected to occur during a pandemic. A theoretical and practical concept for project risk management that addresses a range of global and local issues that affect schedule and cost is presented and results indicate that the most significant delays are due to a
... Show More