Determination of the sites of geographical coordinates with high accuracy and in short time is very important in many applications, including: air and sea navigation, and in the uses geodetic surveys. Today, the Global Positioning System (GPS) plays an important role in performing this task. The datum used for GPS positioning is called World Geodetic System 1984 (WGS84). It consists of a three-dimensional Cartesian coordinate system and an associated ellipsoid so that WGS84 positions describe coordinates as latitude, longitude and ellipsoid height (h) coordinates, with respect to the center of mass of the Earth This study develops a mathematical model for geomantic measurement correction for ellipsoidal heights (h) between two different receivers of different accuracies (i.e. high and low). The results are examined using statistical analysis for the accuracy and reliability of the computed positions. The receivers used in this study were, the Topcon HiPer-II and the Garmin eTrex vista. The first receiver use Global Navigation Satellite Systems (GNSS) signals on the L1 and L2 frequencies of both the GPS and GLONASS satellite navigation systems, while the second receiver was the Garmin eTrex vista.
Identifying people by their ear has recently received import attention in the literature. The accurate segmentation of the ear region is vital in order to make successful person identification decisions. This paper presents an effective approach for ear region segmentation from color ear images. Firstly, the RGB color model was converted to the HSV color model. Secondly, thresholding was utilized to segment the ear region. Finally, the morphological operations were applied to remove small islands and fill the gaps. The proposed method was tested on a database which consisted of 105 ear images taken from the right sides of 105 subjects. The experimental results of the proposed approach on a variety of ear images revealed that this approac
... Show MoreOne of the most important methodologies in operations research (OR) is the linear programming problem (LPP). Many real-world problems can be turned into linear programming models (LPM), making this model an essential tool for today's financial, hotel, and industrial applications, among others. Fuzzy linear programming (FLP) issues are important in fuzzy modeling because they can express uncertainty in the real world. There are several ways to tackle fuzzy linear programming problems now available. An efficient method for FLP has been proposed in this research to find the best answer. This method is simple in structure and is based on crisp linear programming. To solve the fuzzy linear programming problem (FLPP), a new ranking function (R
... Show MoreArtificial pancreas is simulated to handle Type I diabetic patients under intensive care by automatically controlling the insulin infusion rate. A Backstepping technique is used to apply the effect of PID controller to blood glucose level since there is no direct relation between insulin infusion (the manipulated variable) and glucose level in Bergman’s system model subjected to an oral glucose tolerance test by applying a meal translated into a disturbance. Backstepping technique is usually recommended to stabilize and control the states of Bergman's class of nonlinear systems. The results showed a very satisfactory behavior of glucose deviation to a sudden rise represented by the meal that increase the blood glucose
... Show More
Cox regression model have been used to estimate proportion hazard model for patients with hepatitis disease recorded in Gastrointestinal and Hepatic diseases Hospital in Iraq for (2002 -2005). Data consists of (age, gender, survival time terminal stat). A Kaplan-Meier method has been applied to estimate survival function and hazerd function.
Simulation Study
Abstract :
Robust statistics Known as, Resistance to mistakes resulting of the deviation of Check hypotheses of statistical properties ( Adjacent Unbiased , The Efficiency of data taken from a wide range of probability distributions follow a normal distribution or a mixture of other distributions with different standard deviations.
power spectrum function lead to, President role in the analysis of Stationary random processes, organized according to time, may be discrete random variables or continuous. Measuring its total capacity as frequency function.
Estimation methods Share with
... Show MoreA rapid growth has occurred for the act of plagiarism with the aid of Internet explosive growth wherein a massive volume of information offered with effortless use and access makes plagiarism the process of taking someone else’s work (represented by ideas, or even words) and representing it as other's own work easy to be performed. For ensuring originality, detecting plagiarism has been massively necessitated in various areas so that the people who aim to plagiarize ought to offer considerable effort for introducing works centered on their research.
In this paper, work has been proposed for improving the detection of textual plagiarism through proposing a model for can
... Show Moremodel is derived, and the methodology is given in detail. The model is constructed depending on some measurement criteria, Akaike and Bayesian information criterion. For the new time series model, a new algorithm has been generated. The forecasting process, one and two steps ahead, is discussed in detail. Some exploratory data analysis is given in the beginning. The best model is selected based on some criteria; it is compared with some naïve models. The modified model is applied to a monthly chemical sales dataset (January 1992 to Dec 2019), where the dataset in this work has been downloaded from the United States of America census (www.census.gov). Ultimately, the forecasted sales
The Zubair reservoir in the Abu-Amood field is considered a shaly sand reservoir in the south of Iraq. The geological model is created for identifying the facies, distributing the petrophysical properties and estimating the volume of hydrocarbon in place. When the data processing by Interactive Petrophysics (IP) software is completed and estimated the permeability reservoir by using the hydraulic unit method then, three main steps are applied to build the geological model, begins with creating a structural, facies and property models. five zones the reservoirs were divided (three reservoir units and two cap rocks) depending on the variation of petrophysical properties (porosity and permeability) that results from IP software interpr
... Show More