Preferred Language
Articles
/
ijs-313
Evaluation Efficiency of Wind Turbines for Barjisiah (South of Iraq) Wind Plant
...Show More Authors

The main objective of the paper is to study the possibility of erecting 2 MW wind turbine in the south of Iraq (Barjisiah site) by utilizing WAsP model. Wind potential and output predicted the power of WT at a supposed site was calculated. The results for proposed WT showed the WT has a weak performance due to its high capacity and low potential of wind speeds at this site. So, the WT will provide power for a limited time during the year due to its operating at the zone under the rated wind speed.

View Publication Preview PDF
Quick Preview PDF
Publication Date
Mon Nov 29 2021
Journal Name
Iraqi Journal Of Science
Microfacies Evaluation of Mauddud Formation in Ratawi Field, South Iraq
...Show More Authors

This paper includes studying the microfacies evalution of Mauddud Formaion in
four wells(Rt-2, Rt-5, Rt17 and Rt-19). Seventy-seven(77) sampels were collected
of above mentioned wells. Based on fossil content of the samples under study, four
main microfacies were identified: packstone , wakestone , grainstone and lime
mudstone microfacies ,which deposited in shallow open marine and restricted
marine environments. Petrographic examination of thin section indicated that
diagenesis vary in intensity from one site to another, such as dissolution,
cementation, compaction, dolomitization and micritization, which led to the
improvement and deterioration of porosity. The dominant pore types are vuggy,
interparticle and

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Nov 01 2020
Journal Name
Conference
Study the Response Of The Wind Turbine System under Realistic Working Conditions Using Simulink
...Show More Authors
Abstract<p>In recent years, there has been a very rapid development in the field of clean energy due to the huge increase in the demand, which prompted the manufacturers and the designers to increase the efficiency and operating life of the energy systems and especially for wind turbine. It can be considered that the control unit is the main key of the wind turbines. Consequently, it’s essential to understanding the working principle of this unit and spotlight on the factors which influence significantly on the performance of wind turbine system. Simulink technique is proposed to find the response of the wind turbine system under different working conditions. In this paper, it was investigated</p> ... Show More
Scopus (3)
Crossref (3)
Scopus Crossref
Publication Date
Wed Aug 31 2022
Journal Name
Iraqi Journal Of Science
Performance Analysis Of Vertical Axis Wind Turbine Blades Using Double Multiple Stream Tube Process
...Show More Authors

       The interest in green energy in recent years is very noticeable, as this energy is a very important alternative that can replace fuel in many applications, most notably electric power generation, so work must be done to develop a form of this energy such as wind energy by working on the development of turbines. The DMST method provided by Qblade software is an integrated tool for making a simulation of a vertical axis wind turbine (VAWT). The simulation was carried out on vertical axis wind turbines, designing turbine blades according to symmetrical NACA0018, and calculating some parameters such as power, torque and power coefficient. It is found that this type of turbine can be improved by treating the blade edges that cont

... Show More
View Publication Preview PDF
Scopus Crossref
Publication Date
Sat Feb 01 2020
Journal Name
International Journal Of Electrical And Computer Engineering (ijece)
PSS/E based placement wind/PV hybrid system to improve stability of Iraqi grid
...Show More Authors

<span lang="EN-US">Proper employment of Hybrid Wind/ PV system is often implemented near the load, and it is linked with the grid to study dynamic stability analysis. Generally, instability is because of sudden load demand variant and variant in renewable sources generation. As well as, weather variation creates several factors that affect the operation of the integrated hybrid system. So this paper introduces output result of a PV /wind via power electronic technique; DC chopper; that is linked to Iraqi power system to promote the facilitating achievement of Wind/ PV voltage. Moreover, PSS/E is used to study dynamic power stability for hybrid system which is attached to an effective region of Iraqi Network. The hybrid system

... Show More
View Publication
Scopus (14)
Crossref (3)
Scopus Crossref
Publication Date
Tue Oct 29 2019
Journal Name
Journal Of Engineering
Demand Priority in a Power System With Wind Power Contribution Load Shedding Scheme Based
...Show More Authors

The load shedding  scheme has been extensively implemented as a fast solution for unbalance conditions. Therefore, it's crucial to investigate supply-demand balancing in order to protect the network from collapsing and to sustain stability as possible, however its implementation is mostly undesirable. One of the solutions to minimize the amount of load shedding is the integration renewable energy  resources, such as wind power, in the electric power generation could contribute significantly to minimizing power cuts as it is ability to positively improving the stability of the electric grid. In this paper propose a method for shedding the load base on the priority demands with incorporating the wind po

... Show More
View Publication Preview PDF
Crossref (8)
Crossref
Publication Date
Fri Dec 20 2024
Journal Name
Journal Of Engineering
DESIGN, CONSTRUCTION AND TESTING OF LOW SPEED WIND TUNNEL WITH ITS MEASUREMENT AND INSPECTION DEVICES
...Show More Authors

A low speed open circuit wind tunnel has been designed, manufactured and constructed at the Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the first part of the work; that is the design calculations, simulation and construction. It will be followed by a second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70 m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow disturbances in the test section.

... Show More
View Publication
Publication Date
Fri Dec 20 2024
Journal Name
International Journal Of Data And Network Science
Multi-objective of wind-driven optimization as feature selection and clustering to enhance text clustering
...Show More Authors

Text Clustering consists of grouping objects of similar categories. The initial centroids influence operation of the system with the potential to become trapped in local optima. The second issue pertains to the impact of a huge number of features on the determination of optimal initial centroids. The problem of dimensionality may be reduced by feature selection. Therefore, Wind Driven Optimization (WDO) was employed as Feature Selection to reduce the unimportant words from the text. In addition, the current study has integrated a novel clustering optimization technique called the WDO (Wasp Swarm Optimization) to effectively determine the most suitable initial centroids. The result showed the new meta-heuristic which is WDO was employed as t

... Show More
View Publication Preview PDF
Crossref (1)
Scopus Crossref
Publication Date
Thu Dec 01 2011
Journal Name
Journal Of Engineering
DESIGN, CONSTRUCTION AND TESTING OF LOW SPEED WIND TUNNEL WITH ITS MEASUREMENT AND INSPECTION DEVICES
...Show More Authors

A low speed open circuit wind tunnel has been designed, manufactured and constructed at the
Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of
the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the
first part of the work; that is the design calculations, simulation and construction. It will be followed by a
second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test
section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70
m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow
distu

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Sat May 01 2021
Journal Name
Journal Of Physics: Conference Series
Evaluation the turbidity removal efficiency in Al-Wahda water treatment plant using statistical indicators
...Show More Authors
Abstract<p>Most of drinking water consuming all over the world has been treated at the water treatment plant (WTP) where raw water is abstracted from reservoirs and rivers. The turbidity removal efficiency is very important to supply safe drinking water. This study is focusing on the use of multiple linear regression (MLR) and artificial neural network (ANN) models to predict the turbidity removal efficiency of Al-Wahda WTP in Baghdad city. The measured physico-chemical parameters were used to determine their effect on turbidity removal efficiency in various processes. The suitable formulation of the ANN model is examined throughout many preparations, trials, and steps of evaluation. The predict</p> ... Show More
View Publication
Scopus Crossref
Publication Date
Mon Dec 11 2017
Journal Name
Al-khwarizmi Engineering Journal
Simulation Model of Wind Turbine Power Control System with Fuzzy Regulation by Mamdani and Larsen Algorithms
...Show More Authors

Abstract 

     The aim of this work is to create a power control system for wind turbines based on fuzzy logic. Three power control loop was considered including: changing the pitch angle of  the blade, changing the length of the blade and turning the nacelle. The stochastic law was given for changes and instant inaccurate assessment of wind conditions changes. Two different algorithms were used for fuzzy inference in the control loop, the Mamdani and Larsen algorithms. These two different algorithms are materialized and developed in this study in Matlab-Fuzzy logic toolbox which has been practically implemented using necessary intelligent control system in electrical engineerin

... Show More
View Publication Preview PDF
Crossref