Preferred Language
Articles
/
ijs-2286
On the Construction of d-Koszul algebras
...Show More Authors

An algebra has been constructed from a (D, A)-stacked algebra A, under the conditions that , A 1 and . It is shown that when the construction of algebra B is built from a (D, A)-stacked monomial algebra A then B is a d-Koszul monomial algebra.

Scopus Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Tue Apr 01 2014
Journal Name
Journal Of Economics And Administrative Sciences
Analsis of politic behavior and its impact on displaying the continuousness of organizational trust mantainance ,applied research of a sample of AL-farouq State Construction contracting company Employees
...Show More Authors

The research aims to know the concept of politic behavior as one of the important behaviours in the different fields and sectors. It is considered to be part of the organizatial work to face the expected  risks. It includes two group of factors personal (self –monitors, locus of control ,expectation s of success, perceived job alternatives)and organizational(promotion ,division resources,role  ambiguity ,democratic decision)studied by the researcher  in the frame of the relationship with the variable  of display  continuous trust matain which includes two variable (build trust mantain, display  trust continuouness)through applied frame by random sample consists of (90)employee  at Farouq State

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Jan 01 2015
Journal Name
Journal Of Engineering
Performance Improvement of the Implementation of Concrete Structures in the Construction Sector In Iraq Using The Modern Management Technique “Six Sigma”
...Show More Authors

The reality of the field of construction projects in Iraq refers to needing for the development of performance in order to improve quality and reduce defects and errors and to control the time and cost, so there is needing for the application of effective methods in this area, one of the methods that can be applied in this area is the manner of Six Sigma. This research aims to enhance the performance and quality improvement for the construction projects by improving performance in the work of the implementation of the concrete structure depending on the Six Sigma methodology, and for the purpose of achieving the aim of the research, the researcher firstly depends on the theoretical study that include the concepts of qual

... Show More
View Publication
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of Engineering
Developing Crisis Management System for Construction Projects in Iraq
...Show More Authors

Construction is a complicated process that takes place in an almost uncontrollable environment. Although projects can be carefully planned in advance in principle, there is a chance that unforeseen events and crises can disrupt these plans, affecting project development. Because the initial investment expenditures in construction projects are so large, they may be quickly influenced by crises, resulting in significant financial losses. The 2014 financial crisis was one of the most prominent crises that Iraq faced, which significantly impacted various activities in general and the construction industry in particular. Despite the importance of crisis management systems, the researchers found a great lack of local studies looking at cr

... Show More
View Publication
Crossref (6)
Crossref
Publication Date
Wed Jul 05 2017
Journal Name
International Journal Of Science And Research (ijsr)
Assessing BIM Integration with Sustainable Requirement for Buildings Construction
...Show More Authors

View Publication
Crossref (4)
Crossref
Publication Date
Mon Nov 09 2020
Journal Name
Construction Research Congress 2020
How to Improve Workforce Development and Sustainability in Construction
...Show More Authors

View Publication
Scopus (9)
Crossref (4)
Scopus Crossref
Publication Date
Wed Apr 05 2023
Journal Name
Journal Of Engineering
Construction Time-Cost Optimization Modeling Using Ant Colony Optimization
...Show More Authors

In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of Engineering
Developing Crisis Management System for Construction Projects in Iraq
...Show More Authors

Construction is a complicated process that takes place in an almost uncontrollable environment. Although projects can be carefully planned in advance in principle, there is a chance that unforeseen events and crises can disrupt these plans, affecting project development. Because the initial investment expenditures in construction projects are so large, they may be quickly influenced by crises, resulting in significant financial losses. The 2014 financial crisis was one of the most prominent crises that Iraq faced, which significantly impacted various activities in general and the construction industry in particular. Despite the importance of crisis management systems, the researchers found a great lack of local studies l

... Show More
View Publication Preview PDF
Crossref (6)
Crossref
Publication Date
Fri Apr 01 2016
Journal Name
Journal Of Engineering
A Program Applying Professional Safety Basics in Construction Projects
...Show More Authors

When industrial and  constructional renaissance started in the world, the great interest was going on towards the equipment’s,  which was the first mean for production. After industry was settled the interest was going on towards the men ship which manpower on which the production depends. It was approved that it represents the basic part in all of the processes and the protection of those individuals against dangers of these equipment’s, industry and its accidents was the basic things which was studied in many researches until it crystallized in general principles for all industries and other take care in each industry.

     The professional safety is concerned as restrict which

... Show More
View Publication Preview PDF
Publication Date
Wed Nov 02 2011
Journal Name
Journal Of Engineering
Implementation of Gypseous Soil-asphalt Stabilization Technique for Base Course Construction
...Show More Authors

The aim of this research work is to study the effect of stabilizing gypseous soil, which covers vast areas in the middle, west and south parts of Iraq, using liquid asphalt on its strength properties to be used as a base course layer replacing the traditional materials of coarse aggregate and broken stones which are scarce at economical prices and hauling distances. Gypseous soil brought from Al-Ramadi City, west of Iraq, with gypsum content of 66.65%, medium curing cutback asphalt (MC-30), and hydrated lime are used in this study. The conducted tests on untreated and treated gypseous soil with different percentages of medium curing cutback asphalt (MC-30), water, and lime were: unconfined compression strength, and one dimensional confine

... Show More
Publication Date
Fri Dec 30 2022
Journal Name
Iraqi Journal Of Science
Design and Construction of Ultraviolet and Incoming Solar Irradiance Sensing Device
...Show More Authors

     In-situ measurements of ultraviolet (UV) and solar irradiance is very sparse in Nigeria because of cost; it is  estimated using meteorological parameters. In this work, a low-cost UV and pyranometer device, using locally sourced materials, was developed. The instrument consists of a UV sensor (ML8511), a photodiode (BPW34) housed in a carefully sealed vacuumed glass bulb, the UV and solar irradiance sensor amplifiers, a 16-bit analog-to-digital converter (ADS1115), Arduino mega 2560, liquid crystal display (LCD) and microSD card for data logging. The designed amplifier has an offset voltage of 0.8676 mV. The sensitivity of the irradiance device is 86.819 Wm-2/mV with a correcting factor of 27.77 Wm-2 and a

... Show More
View Publication Preview PDF
Scopus Crossref