Preferred Language
Articles
/
ijs-2286
On the Construction of d-Koszul algebras
...Show More Authors

An algebra has been constructed from a (D, A)-stacked algebra A, under the conditions that , A 1 and . It is shown that when the construction of algebra B is built from a (D, A)-stacked monomial algebra A then B is a d-Koszul monomial algebra.

Scopus Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sat Dec 01 2012
Journal Name
Iraqi Journal Of Science
Applications of Camera Total Station System (CTSS) in the Construction Surveying
...Show More Authors

AZ Khalaf, M kassim Haidir, LK Jasim, Iraqi Journal of Science, 2012

View Publication
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of The Mechanical Behavior Of Materials
Identifying the selection criteria of design consultant for Iraqi construction projects
...Show More Authors
Abstract<p>The quality and cost of constructed buildings are heavily influenced by the performance of design/auditing consultants. Thus, selecting the right design consultant and design auditing consultants is of utmost importance and not an easy task for any construction client. so, the client should specify the efficiency criteria and assess the performance levels of the design and design auditing consultant firm. The study aims to identify the selection criteria of the design consultant in construction projects and also identify the selection criteria of the design auditing consultant for the construction projects by using the Delphi survey with applying the principal components analysis (PCA</p> ... Show More
View Publication
Scopus (1)
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Sat Feb 12 2022
Journal Name
Engineering, Technology &amp; Applied Science Research
Investigating the Causes of Poor Cost Control in Iraqi Construction Projects
...Show More Authors

Controlling cost in construction projects is an essential issue. This study investigates the most critical problems that cause weakness in cost control in Iraqi construction projects. The quantitative technique was used by conducting a survey directed to professionals who work on construction projects. One hundred and sixty-four questionnaire forms were distributed to private sector companies, government companies, and government institutions, and the responses were subjected to the required statistical analysis. The results indicate that the most influential factors are the weakness in keeping up with the use of modern concepts, methods, and technologies, the delay in receiving the amounts due for work done from the owner, fluctuat

... Show More
View Publication
Crossref (6)
Crossref
Publication Date
Tue Dec 22 2020
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Cost Management of construction industries according to the fast-track method
...Show More Authors

Construction projects have become a changing dramatically in recent decades and that the goal of the beneficiaries of the implementation of structural project is to complete the work with less time and within the cost of the specific and the best possible quality may sometimes happen that highlights the importance of time on the rest of the items at the implementation of projects for various reasons, including the need to use the project as soon as possible possible change rapidly to customer's requests, but the high cost of the project represents the biggest obstacle for entrepreneurs with its effects on the quality and the time workers, and is a measure of those elements in monetary terms is the key to integration between them, so the

... Show More
View Publication Preview PDF
Publication Date
Sat Dec 30 2023
Journal Name
Iraqi Journal Of Science
3-D Seismic Survey Study of Faults System in Balad Oil Field – Center of Iraq
...Show More Authors

3D seismic reflection structural study of (250) km² of Balad Oil field located in central part of Iraq within Salah Al-din province (Balad area) was carried out.
Faults were picked using instantaneous phase attribute of seismic sections and variance attribute of seismic time slices across 3D seismic volume.
A Listric growth normal fault is affecting the succession of Cretaceous Formation and cut by strike slip fault. In addition, minor normal faults (Dendritic and tension faults) are developed on the listric normal growth fault. As a result, a major graben is separated by Strike slip fault into two parts (north and south parts) and trend in NW-SE direction.

View Publication Preview PDF
Publication Date
Mon Oct 31 2022
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
The adoption of green management in Iraqi construction industry: The challenges and benefits
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Tue Mar 01 2016
Journal Name
Al-academy
Employing the elements of film construction in embodying the style cinematically: عامر الحديثي
...Show More Authors

The researcher concluded that it consists of several types of structures, where the intellectual structure related to the choice of the idea, its treatment, its effect, the choice of the topic, the way ideas are addressed and presented in the film, and then the dramatic structure of the film's characters, the formulation of its events, its dramatic composition, its temporal arrangement, the identification of the parties to the conflict and their management, then these are formulated. Visions and ideas through the visual and audio signal systems, which work to highlight the stylistic features in the character of the film director.

View Publication Preview PDF
Crossref
Publication Date
Wed Dec 01 2021
Journal Name
Civil And Environmental Engineering
Prediction of the Delay in the Portfolio Construction Using Naïve Bayesian Classification Algorithms
...Show More Authors
Abstract<p>Projects suspensions are between the most insistent tasks confronted by the construction field accredited to the sector’s difficulty and its essential delay risk foundations’ interdependence. Machine learning provides a perfect group of techniques, which can attack those complex systems. The study aimed to recognize and progress a wellorganized predictive data tool to examine and learn from delay sources depend on preceding data of construction projects by using decision trees and naïve Bayesian classification algorithms. An intensive review of available data has been conducted to explore the real reasons and causes of construction project delays. The results show that the postpo</p> ... Show More
Scopus (5)
Crossref (5)
Scopus Clarivate Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Translation & Linguistics
TO THE QUESTION ABOUT THE USE OF METAPHORS IN THE CREATION OF ART (ON THE EXAMPLE OF THE STORY BY D. RUBINA "YOU AND ME UNDER THE PEACH CLOUDS")
...Show More Authors

The article reflects the results of the analysis of the use of metaphors when creating the image of the main character of the story by D. Rubina "You and me under the peach clouds" - a pet, a dog named Kondraty. Through metaphorization, the image of the dog is filled by the author with purely human qualities, thus passing into the category of a full member of the family. The article is a continuation of the study of the work of D. I. Rubina.

Publication Date
Sun Apr 30 2017
Journal Name
Ibn Al-haitham Journal For Pure And Applied Sciences
Classification and Construction of (k,3)-Arcs on Projective Plane Over Galois Field GF(9)
...Show More Authors

  In this work, we construct and classify the projectively distinct (k,3)-arcs in PG(2,9), where k ≥ 5, and prove that the complete (k,3)-arcs do not exist, where 5 ≤ k ≤ 13. We found that the maximum complete (k,3)-arc in PG(2,q) is the (16,3)-arc and the minimum complete (k,3)-arc in PG(2,q) is the (14,3)-arc. Moreover, we found the complete (k,3)-arcs between them.

View Publication Preview PDF