Kirchhoff Time migration was applied in Pre and Post-Stack for 2D seismic survey for line AJ-99N, that is located in Ajeel oilfield in Salah Al-Din Governorate, Central Iraq. The process follows several accurate steps to reach the final time migration stage. The results of applied time migration give an accurate image for the Ajeel anticline reservoir and to improve the signal to noise ratio. Pre-Stack shows a clearer image for the structure in the study area, and the time-frequency analysis insure the result.
Tight reservoirs have attracted the interest of the oil industry in recent years according to its significant impact on the global oil product. Several challenges are present when producing from these reservoirs due to its low to extra low permeability and very narrow pore throat radius. Development strategy selection for these reservoirs such as horizontal well placement, hydraulic fracture design, well completion, and smart production program, wellbore stability all need accurate characterizations of geomechanical parameters for these reservoirs. Geomechanical properties, including uniaxial compressive strength (UCS), static Young’s modulus (Es), and Poisson’s ratio (υs), were measured experimentally using both static and dynamic met
... Show MoreIn this paper, an enhanced artificial potential field (EAPF) planner is introduced. This planner is proposed to rapidly find online solutions for the mobile robot path planning problems, when the underlying environment contains obstacles with unknown locations and sizes. The classical artificial potential field represents both the repulsive force due to the detected obstacle and the attractive force due to the target. These forces can be considered as the primary directional indicator for the mobile robot. However, the classical artificial potential field has many drawbacks. So, we suggest two secondary forces which are called the midpoint
... Show MoreThis effort is related to describe and assess the performance of the Iraqi cement sample planned for oil well-cementing jobs in Iraq. In this paper, major cementing properties which are thickening time, compressive strength, and free water in addition to the rheological properties and filtration of cement slurry underneath definite circumstances are experimentally tested. The consequences point to that the Iraqi cement after special additives encounter the requests of the API standards and can consequently is used in cementing jobs for oil wells. At this research, there is a comparative investigation established on experimental work on the effectiveness of some additives that considered as waste materials which are silica fume, bauxite,
... Show MoreIn this modern Internet era and the transition to IPv6, routing protocols must adjust to assist this transformation. RIPng, EIGRPv6 and OSPFv3 are the dominant IPv6 IGRP (Interior Gateway Routing Protocols). Selecting the best routing protocol among the available is a critical task, which depends upon the network requirement and performance parameters of different real time applications. The primary motivation of this paper is to estimate the performance of these protocols in real time applications. The evaluation is based on a number of criteria including: network convergence duration, Http Page Response Time, DB Query Response Time, IPv6 traffic dropped, video packet delay variation and video packet end to end de
... Show MoreThe calculation of the oil density is more complex due to a wide range of pressuresand temperatures, which are always determined by specific conditions, pressure andtemperature. Therefore, the calculations that depend on oil components are moreaccurate and easier in finding such kind of requirements. The analyses of twenty liveoil samples are utilized. The three parameters Peng Robinson equation of state istuned to get match between measured and calculated oil viscosity. The Lohrenz-Bray-Clark (LBC) viscosity calculation technique is adopted to calculate the viscosity of oilfrom the given composition, pressure and temperature for 20 samples. The tunedequation of state is used to generate oil viscosity values for a range of temperatu
... Show MoreThe purpose of this study is to avoid delays and cost changes that occur in emergency reconstruction projects especially in post disaster circumstances. This study is aimed to identify the factors that affect the real construction period and the real cost of a project against the estimated period of construction and the estimated cost of the project. The case study is related to the construction projects in Iraq. Thirty projects in different areas of construction in Iraq were selected as a sample for this study. Project participants from the projects authorities provided data about the projects through a data collection distributed survey made by the authors. Mathematical data analysis was used to construct a model to predict change
... Show MoreSeventeen samples of Hartha Formation in Balad (1) well, central Iraq, are studied on the basis of stratigraphic ranges of the recorded calcareous nannofossils for twenty species belonging to twelve genera. The studied section reveals three biozones arranged from oldest to youngest as follows; (1) Calculites ovalis Interval Biozone (CC19), (2) Ceratolithoides aculeus Interval Biozone (CC20), (3) Quadrum sissinghii Interval Biozone (CC21). These Biozones are correlated with other calcareous nannofossils biozones from both local and regional sections, leading to conclude the age of the Middle Campanian.
Rerecorded eighteen ostracode species that belong to eleven genera are identified,
... Show MoreThe Bouguer gravity and magnetic RTP anomalies data were used to detect the main tectonic boundaries of middle and south of Diyala Province, east Iraq. Window method was used to separate the residual anomalies using different space windows for the Bouguer and Magnetic RTP maps. The residual anomaly processed in order to reduce noise and give a more comprehensive vision about subsurface lineaments structures. Results for descriptive interpretation presented as contour maps in order to locate directions and extensions of lineaments feature which may interpret as faults. The gradient technique is used for depth estimation of some gravity source which shows that the sources depth range between (13.65
... Show More