In this work, using GPS which has best accuracy that can be established set of GCPs, also two satellite images can be used, first with high resolution QuickBird, and second has low resolution Landsat image and topographic maps with 1:100,000 and 1:250,000 scales. The implementing of these factors (GPS, two satellite images, different scales for topographic maps, and set of GCPs) can be applying. In this study, must be divided this work into two parts geometric accuracy and informative accuracy investigation. The first part is showing geometric correction for two satellite images and maps.
The second part of the results is to demonstrate the features (how the features appearance) of topographic map or pictorial map (image map), Where it is highlight the different features with different scales to know the accuracy of information. Where can be noticed through graphics that features appear very close to each other at a certain scale and become detached at another scale and this problem can be solved by generalization method. Geodatabase in GIS program also have been used as a modern style store all data related to the project in one folder divisions with that data. In addition to storage in a shape file. Geographic Information Systems (GIS) uses Remote Sensing (RS) data for a lot of applications. One of the application areas is the updating of the GIS database using high resolution imagery. Finally, high resolution satellite imagery data is very important to obtain updating map for Kut city by implementation two methods geodatabase and shapefile.
The evolution in materials’ technology in the last decades resulted in interesting projects that aimed at preserving the environment and energy and reduce pollution. They have been taken the principles of environmental design as a basis for architectural thought, starting from the early stages of the design process ending in choosing appropriate building materials to achieve sustainable buildings, but these trying are limited in our local environment and there isn’t demanded seriousness. The research problem emerges in the ignorance of the environmental aspect (ecological system) when selecting building materials during design process to achieve sustainable buildings. The aim of this research is revealing the mechanisms of selecting
... Show MoreIn this research a new system identification algorithm is presented for obtaining an optimal set of mathematical models for system with perturbed coefficients, then this algorithm is applied practically by an “On Line System Identification Circuit”, based on real time speed response data of a permanent magnet DC motor. Such set of mathematical models represents the physical plant against all variation which may exist in its parameters, and forms a strong mathematical foundation for stability and performance analysis in control theory problems.
Public-private partnership (PPP) has been used over the past 20-30 years by governments in developed countries to meet the public demand for infrastructural services. In Iraq, the PPP concept is comparatively new to the Government of Iraq (GoI), where the government has historically taken most of the responsibility for providing public services. There are few PPP projects in Iraq. However, the number is increasing. Recently the Iraqi market has experienced a number of attempts of PPP in different sectors, especially after the new investment law in 2006. The aim of this paper is to evaluate the investment environment in Iraq and to indicate the main factors affecting PPP in particular for infrastructure projects. Some literature review and
... Show MoreSolar module operating temperature is the second major factor affects the performance of solar photovoltaic panels after the amount of solar radiation. This paper presents a performance comparison of mono-crystalline Silicon (mc-Si), poly-crystalline Silicon (pc-Si), amorphous Silicon (a-Si) and Cupper Indium Gallium di-selenide (CIGS) photovoltaic technologies under Climate Conditions of Baghdad city. Temperature influence on the solar modules electric output parameters was investigated experimentally and their temperature coefficients was calculated. These temperature coefficients are important for all systems design and sizing. The experimental results revealed that the pc-Si module showed a decrease in open circuit v
... Show MoreThe present work shows a theoretical results that have been used the functional Hybrid of three parameters Lee-Yang-Parr (B3LYP) of the quantum mechanical approach for density functional theory with (Spanish Initiative for Electronic Simulations with Thousands of Atoms) SIESTA code. All calculations were carried out employing the used method at the Gaussian 09 package of programs. It was reported the main point for research on dominance of the bandgap of elongated pi-conjugated molecules by using different chemical groups replacing hydrogen atom in the most molecules that used in this work. The side groups creates another factor that controls the value of the band gap. The dihedral angle between the two pheny
... Show MoreThe performance analyses of 15 kWp (kW peak) Grid -Tied solar PV system (that considered first of its type) implemented at the Training and Energy Research Center Subsidiary of Iraqi Ministry of Electricity in Baghdad city has been achieved. The system consists of 72 modules arranged in 6 strings were each string contains 12 modules connected in series to increase the voltage output while these strings connected in parallel to increase the current output. According to the observed duration, the reference daily yields, array daily yields and final daily yields of this system were (5.9, 4.56, 4.4) kWh/kWp/day respectively. The energy yield was 1585 kWh/kWp/year while the annual total solar irradiation received by solar array system was 198
... Show MoreIn order to have an idea about what happens in Iraqi food establishments in relation to implement quality management system ISO 9001, this study was performed to show the actual situation of Iraqi food establishments concerning quality management system (ISO 9001:2015), reasons of implementing, factors that hinder implementing and problems faced high administration for getting establishments certification ISO 9001:2015. The study demonstrated from the questionnaire some difficulties to implement ISO 9001 for both of establishments that implemented the quality system or which in implementing of this international standard. The most important problems during implementing were business culture and costs and the most important proble
... Show MoreDue to the large size of dealing in the transactions installment sales in durable products, especially real estate given the privacy to enjoy their property, among other products because of the large amount and the length of the repayment period leading to a risk of non-payment by the buyer because of the possibility to change the credit level to him, especially that most of this type of transaction customers are from limited income owners, So it has been proposed the use of other transactions in handling real estate instead of installment sales transactions, a rental sale transactions because of the protection provided by this transaction for a vendor that will be mentioned later.
So proposes to st
... Show MoreThis work aimed to design, construct and operate a new laboratory scale water filtration system. This system was used to examine the efficiency of two ceramic filter discs as a medium for water filtration. These filters were made from two different ceramic mixtures of local red clay, sawdust, and water. The filtration system was designed with two rotating interfered modules of these filters. Rotating these modules generates shear force between water and the surfaces of filter discs of the filtration modules that works to reduce thickness of layer of rejected materials on the filters surfaces. Each module consists of seven filtration units and each unit consists of two ceramic filter discs. The average measured hy
... Show MoreIn this paper, an experimental study of the thermal performance for hybrid solar air conditioning system was carried out, to investigate system suitability for the hot climate in Iraq. The system consists of vapor compression unit combined with evacuated tube solar collector and liquid storage tank. A three-way valve was installed after the compressor to control the direction flow of the refrigerant, either to the storage tank or directly to the condenser. The performance parameters were collected by data logger to display and record in the computer by using LabVIEW software. The results show that the average coefficient of performance of hybrid solar air conditioning system (R=1) was about 2.42 to 2.77 and the average p
... Show More