In this research the change in the distance of the two stars in two binary star systems (13.6+8)M8and (13+10)M8 was studied, through the calculations the value (rate of mass transfer) of the two phases of dynamical stages of mass which are mass loss and mass transfer has been extracted in its own way ,by extracting the value of the value of (the distance variation between the two stars) has been found only in the mass transfer stage by using mathematical model ,in mass loss stage and were calculated from the change and the difference between the values of each at different times of binary star system evolution ,it was found that the maximum values of and are in mass transfer state in binary star system , in other words the maximum values of depend on the mass transfer between the two component stars of the binary star system.
This article focuses on identity construction and social structures within the Sāmoan community as represented in Sia Figiel’s novel Where We Once Belonged. I argue that however the post/colonial Sāmoan identity is hybridized, the essence of the individual is still connected to Fa’a Sāmoa-the Sāmoan traditions and ways. However rapid are the colonial vicissitudes, the Sāmoan literature and lifestyle are developed to be a resistance platform. This resistance platform is dedicated not only to expose the colonial impact but also to assist the social and political reconstruction of post/colonial Samoa. To this end, this article studies identity construction, and the challenges that women face within Sāmoan social structures.
In this study, performance characteristics such as power take off (PTO) power consumption, fuel consumption, fuel consumption for the unit field-unit product were determined at different working speeds with two different PTO applications (540 and 540E) in a single row disc type silage machine. In particular, the 540E PTO application greatly reduces fuel consumption for unit work. The best results in terms of hourly fuel consumption were achieved in 540E PTO application and V1 working speed. When the field - product fuel consumption is evaluated, the best results were obtained with the 540E PTO application at the V3 working speed. When an evaluation is made considering all the parameters, it is concluded that the 540E PTO application will p
... Show MoreLeucine aminopepotidase (LAP)[EC:3.4.11.1] activity has been assayed in (50) serum samples of patients with diabeties naphrophathy D.N (non-insulin dependent diabetic (NIDD) , and (50)serum sample of healthy individuals without any clinically detectable diseases have been as control group. The aim of this study is to measure leucine aminopeptidase activity and partially purifying the enzyme from sera of patients with diabetes nephropathy The results of this study revealed that Leucine aminopeptidase (LAP) activity of nephropathy patient’s serum shows a high signifiacant increase (p < 0.001) compared to that of the healthy subjects.LAP was purified from the serum of patients with diabetes nephropathy by dialysis and gel filtration (Se
... Show MoreIt was aimed to understand the interleukin-4 (IL-4) role in etio-pathogenesis of rheumatoid arthritis (RA). Two approaches were adopted. In the first one, a quantitative expression of IL4 gene was assessed by reverse transcription-quantitative polymerase chain reaction (RT-qPCR), and such findings were correlated with some demographic, clinical and laboratory parameters, which included gender, duration of disease, disease activity score (DAS-28), rheumatoid factors (RFs), C-reactive protein (CRP) and anti-cyclic citrullinated peptide (ACCP) antibodies. In the second approach, a single nucleotide polymorphism (SNP) of IL4 gene (rs2243250) was inspected by DNA sequencing using specific primers. Fifty-one Iraqi RA patients (22 males and 29 fem
... Show MoreEngineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public a
... Show MoreBACKGROUND: Preterm labour is a major cause of perinatal morbidity and mortality, so it is important to predict preterm delivery using the clinical examination of the cervix and uterine contraction frequency. New markers for the prediction of preterm birth have been developed such as transvaginal ultrasound measurement of cervical length as this method is widely available. OBJECTIVE: To determine, whether transvaginal cervical length measurement predicts imminent preterm delivery better than digital cervical length measurement in women presented with preterm labour and intact membranes. PATIENTS AND METHODS: Two hundred women presented with preterm labour between 24 and 36+6 weeks of gestation were included in this study. All women subjecte
... Show More