In this research study the synodic month for the moon and their
relationship with the mean anomaly for the moon orbit and date A.D
and for long periods of time (100 years), we was design a computer
program that calculates the period of synodic months, and the
coordinates of the moon at the moment of the new moon with high
accuracy. During the 100 year, there are 1236 period of synodic
months.
We found that the when New Moon occurs near perigee (mean
anomaly = 0°), the length of the synodic month at a minimum.
Similarly, when New Moon occurs near apogee (mean anomaly =
180°), the length of the synodic month reaches a maximum. The
shortest synodic month on 2053 /1/ 16 and lasted (29.27436) days.
The longest synodic month began on 2008 /11/ 27 and lasted
(29.81442) days. The mean synodic month (29.53109) days. We
found the relationship between synodic month with months. The
shortest synodic month are correlated with date (June and July) when
the Earth is near aphelion. And the longest Synodic month are
correlated with date (December and January) when the Earth is near
perihelion.
Abstract
This research aims to design a multi-objective mathematical model to assess the project quality based on three criteria: time, cost and performance. This model has been applied in one of the major projects formations of the Saad Public Company which enables to completion the project on time at an additional cost that would be within the estimated budget with a satisfactory level of the performance which match with consumer requirements. The problem of research is to ensure that the project is completed with the required quality Is subject to constraints, such as time, cost and performance, so this requires prioritizing multiple goals. The project
... Show MoreAssessing performance efficiency is critical to the management need for oversight, planning, and continuous periodic evaluation of the multiple activities of Northern Cement State Company in order to determine the level of achievement of the objectives set, and to correct the deviations and delays that the evaluation shows and limitation of liability. What cannot be measured cannot be managed. The aim of this research is to highlight the impact of using BSC, financial and non-financial, to give comprehensive and clear picture of the company's performance and to measure the quality of its performance by using six-sigma and the level of deviations in achieving the planned goals. Therefore, four-key hypotheses were formulated for th
... Show MoreThis research aims at the possibility of rationalizing business organizations according to the strategic planning directions which have been developed to deal with many problems faced by business organizations, including the General Company for Automobile and Machinery Trade which was chosen as a research society, and several research problems were diagnosed, including an increase in the numbers of employees who constitute hidden unemployment, lack of work in the system of job specialization, and the organizational structure which is the non-application of the company to a modern administrative model. The importance of the research is that the company being investigated is a pioneer in its field of work and seeks to achieve custo
... Show MoreIncreasing hydrocarbon recovery from tight reservoirs is an essential goal of oil industry in the recent years. Building real dynamic simulation models and selecting and designing suitable development strategies for such reservoirs need basically to construct accurate structural static model construction. The uncertainties in building 3-D reservoir models are a real challenge for such micro to nano pore scale structure. Based on data from 24 wells distributed throughout the Sadi tight formation. An application of building a 3-D static model for a tight limestone oil reservoir in Iraq is presented in this study. The most common uncertainties confronted while building the model were illustrated. Such as accurate estimations of cut-off permeab
... Show MoreIncreasing hydrocarbon recovery from tight reservoirs is an essential goal of oil industry in the recent years. Building real dynamic simulation models and selecting and designing suitable development strategies for such reservoirs need basically to construct accurate structural static model construction. The uncertainties in building 3-D reservoir models are a real challenge for such micro to nano pore scale structure. Based on data from 24 wells distributed throughout the Sadi tight formation. An application of building a 3-D static model for a tight limestone oil reservoir in Iraq is presented in this study. The most common uncertainties confronted while building the model were illustrated. Such as accurate estimations of cut-off
... Show MoreThe problem of water scarcity is becoming common in many parts of the world, to overcome part of this problem proper management of water and an efficient irrigation system are needed. Irrigation with a buried vertical ceramic pipe is known as a very effective in the management of irrigation water. The two- dimensional transient flow of water from a buried vertical ceramic pipe through homogenous porous media is simulated numerically using the HYDRUS/2D software. Different values of pipe lengths and hydraulic conductivity were selected. In addition, different values of initial volumetric soil water content were assumed in this simulation as initial conditions. Different value
... Show MoreAtherosclerosis is the most common causes of vascular diseases and it is associated with a restriction in the lumen of blood vessels. So; the study of blood flow in arteries is very important to understand the relation between hemodynamic characteristics of blood flow and the occurrence of atherosclerosis.
looking for the physical factors and correlations that explain the phenomena of existence the atherosclerosis disease in the proximal site of LAD artery in some people rather than others is achieved in this study by analysis data from coronary angiography as well as estimating the blood velocity from coronary angiography scans without having a required data on velocity by using some mathematical equations and physical laws. Fif
... Show MoreIn this research, the program SEEP / W was used to compute the value of seepage through the homogenous and non-homogeneous earth dam with known dimensions. The results show that the relationship between the seepage and water height in upstream of the dam to its length for saturated soil was nonlinear when the dam is homogenous. For the non-homogeneous dam, the relationship was linear and the amount of seepage increase with the height of water in upstream to its length. Also the quantity of seepage was calculated using the method of (Fredlund and Xing, 1994) and (Van Genuchten, 1980) when the soil is saturated – unsaturated, the results referred to that the higher value of seepage when the soil is saturated and the lowe
... Show MoreThe official spokesperson considered responsible for the transmission of information and communication messages that convey the government’s view on the various political and economic issues that affect the public opinion towards the performance achieved by the various governmental institutions and for the purpose of communicating with the media in a positive and effective manner, a number of institutions in the world in general and in Iraq in particular have nominated a spokesman to coordinate the efforts and the dissemination of news and the preparation of press conferences to contribute to the achievement of a positive and effective level between the government and the media, so this study has tackled to deal with the credibility of
... Show More