The aim of this research is to design and construct a semiconductor laser range finder
operating in the near infrared range for ranging and designation. The main part of the range finder is the
transmitter which is a semiconductor laser type GaAs of 0.904 mm wavelength with a beam expander,
and the receiver with its collecting optics. The characteristics of transmitter pulse width were 200ns and
threshold current 10 Amp. and maximum operating current 38 Amp. The repetition rate was set at 660 Hz
and maximum output power about 1 watt. The divergence of the beam was 0.268o. A special computer
code was used for optimum optical design and laser spot size analysis and for calculation of atmosphere
attenuation.
The current research aims to develop the skills of the kindergarten students in designing and implementing a theater for gauntlets made of cardboard materials. To study this, the researcher determined to build teaching plans for design and implementation skills according to (Kolb model).
The results of this research showed the effectiveness of teaching plans according to (Kolb's model) in developing skills of design and implementation (theater for gauntlets made of cardboard materials) for the students of the Kindergarten Department - the experimental group. Which had a positive effect to reach the desired results in the design and implementation of the gauntlet theater and dealing with cardboard materials
Been manufacturing detector Altosalih optical pattern contact metal semiconductor through deposition poles of aluminum metal on the chips of crystal cadmium Tleraad (CdTe) with directional [111] and growing with laboratory and annealed at a temperature 80c for 30 minutes and eat Study of some electrical properties nailed and scoutNmadj ??????? copper with non ??????? models to see effect Alichoab well research deals impact Alichoab and frequency detector resistance
The construction sector is considered an important and influential pivot in the national economy of any country. Nations are working to develop this sector, receiving modern and developed techniques. So, this sector can be a carrier or a receiver of modern technologies. The cost of technology transfer between the international companies that sponsor this sector is a matter of great importance, especially since different factors affect the need for this advanced technology. The cost of technology transfer in construction is related to multiple factors presented by Knowledge, equipment, plant, hardware and software. The lack of distinguishing and evaluating the direct and indirect costs in the construction sector during
... Show MoreCommunication and media technologies have seen several changes in the last two decades. These changes put the basis for the emergence of communicative and media practices on several levels including political, economic, technological and artistic. And these, in turn, led to the emergence of new media trends and phenomena in various areas of media worthily to be studied and researched for example online advertisings. Online advert
... Show MoreConstruction projects are complicated in nature and require many considerations in contractor selection. One of the complicated interactions is that between performance with the project size, and contractor financial status, and size of projects contracted. At the prequalification stage, the financial requirements restrict the contractors to meet minimum limits in financial criteria such as net worth, working capital and annual turnover, etc. In construction projects, however, there are cases when contractors meet these requirements but show low performance in practice. The model used in the study predicts the performance by training of a neural network. The data used in the study are 72 of the most recent roadw
... Show MoreThis essay aims to highlight the most important issues and difficulties facing implementing large projects that follow the turn-key method, considered one of the types of contractual methods in Iraq, especially for large and complex projects requiring speedy completion. The projects implemented in this way face delays and delays in completion, which led to the lack of benefit from the projects for which they were implemented, especially those affecting the lives of citizens within the health sector. The case study dealt with the construction of hospitals with multi-bed capacities within multiple governorates in Iraq, With large financial allocations within the federal budget of the Government of Iraq over several years.
... Show MoreThis research examines the impact of construction technology systems in contemporary architectural production through the study of the evolution in it systems, construction materials and methods of construction in addition to the digital revolution which provided possibilities of structural and architectural design in creating a distinct architectural product, as considered construction systems technology is the source of creativity in the architectural product, the research is assumed that the construction systems technology have achieved a structural innovation in production through the materials and methods of construction and digital design.
For Long time technology was connected to the