Stuck pipe is a prevalent and costly issue in drilling operations, with the potential to cost the petroleum industry billions of dollars annually. To reduce the likelihood of this issue, efforts have been made to identify the causes of stuck pipes. The main mechanisms that cause stuck pipes include drill cutting of the formation, inappropriate hole-cleaning, wellbore instability, and differential sticking forces, particularly in highly deviated wellbores. The significant consequences of a stuck pipe include an increase in well costs and Non-Productive Time (NPT), and in the worst-case scenario, the loss of a wellbore section and down-hole equipment, or the need to sidetrack, plug, or abandon the well. This paper provides a comprehensive review of the challenges associated with pipe sticking during drilling operations. The mechanisms of pipe sticking, analysis of differential sticking factors, guiding principles to minimize differential sticking, diagnosis approaches, and different treatment methods are discussed. This paper can serve as a guide for any problem involving stuck pipes in the petroleum industry.
Drilling with casing (DWC) can be considered as a modern drilling technique in which both of drilling and casing operations done in the same time by using the casing to transfer the hydraulic and mechanical power to the bit instead of traditional drilling string. To overcome oil well control, minimizing the total cost through enhancing drilling efficiency, drilling with casing was proposed as an enabling technology.
Two surface sections (17 1/2 - and 12 1/4- inch) were drilled successfully in Rumaila oil field with casing strings which reached 655m and 1524m measured depths respectively.
By using DWC technique, the total drill/case phase time was reduced up to 20% comparing to conventional
... Show MoreDarcy-Weisbach (D-W) is a typical resistance equation in pressured flow; however, some academics and engineers prefer Hazen-Williams (H-W) for assessing water distribution networks. The main difference is that the (D-W) friction factor changes with the Reynolds number, while the (H-W) coefficient is a constant value for a certain material. This study uses WaterGEMS CONNECT Edition update 1 to find an empirical relation between the (H-W) and (H-W) equations for two 400 mm and 500 mm pipe systems. The hydraulic model was done, and two scenarios were applied by changing the (H-W) coefficient to show the difference in results of head loss. The results showed a strong relationship between both equations with correlation coefficients of 0.999,
... Show MoreIn this work, a vertical pulsating heat pipe heat exchanger (PHPHE) was designed for waste heat recovery, exchanging thermal energy between two air streams in a counterflow configuration. The heat exchanger consists of six rows, each row consists of one pulsating heat pipe (PHP), and each PHP has six turns. The working fluid used in the heat pipe was acetone with fill ratios of 50%, 60%, and 70%. The effect of evaporator inlet temperature at 40, 45, and 50°C and air velocity at 0.5, 0.7, and 0.9 m/s on the pulsating heat pipes consisting of three sections- evaporator, condenser, and adiabatic, whose dimensions were 25 x 25 x 10 cm, was studied. At the same time, the condenser temperature was maintained at 26°C. The system’s th
... Show MoreWhen scheduling rules become incapable to tackle the presence of a variety of unexpected disruptions frequently occurred in manufacturing systems, it is necessary to develop a reactive schedule which can absorb the effects of such disruptions. Such responding requires efficient strategies, policies, and methods to controlling production & maintaining high shop performance. This can be achieved through rescheduling task which defined as an essential operating function to efficiently tackle and response to uncertainties and unexpected events. The framework proposed in this study consists of rescheduling approaches, strategies, policies, and techniques, which represents a guideline for most manufacturing companies operatin
... Show MoreDairy wastewater generally contains fats, lactose, whey proteins, and nutrients. Casein precipitation causes the effluent to decompose into a dark, strong-smelling sludge. Fluid waste contains soluble organic matter, suspended solids, and gaseous organic matter, which cause undesirable taste and smell, grant tone and turbidity, and advance eutrophication, which plays an essential role in increasing biological oxygen demand (BOD) in water. It also contains detergents and disinfecting agents from the rinses and washing processes, which increase the need for chemical oxygen (COD). One of the characteristics of dairy effluents is their relatively high temperature, high organic contents, and wide pH range, so the discharge of wastewater into
... Show MoreProduction logging is used to diagnose well production problems by evaluating the flow profile, entries of unwanted fluids and downhole flow regimes. Evaluating wells production performance can be easily induce from production logs through interpretation of production log data to provide velocity profile and contribution of each zone on total production. Production logging results supply information for reservoir modeling, provide data to optimize the productivity of existing wells and plan drilling and completion strategies for future wells. Production logging was carried out in a production oil well from Mishrif formation of West Qurna field, with the objective to determine the flow profile and fluid contributions from the perforations af