Stuck pipe is a prevalent and costly issue in drilling operations, with the potential to cost the petroleum industry billions of dollars annually. To reduce the likelihood of this issue, efforts have been made to identify the causes of stuck pipes. The main mechanisms that cause stuck pipes include drill cutting of the formation, inappropriate hole-cleaning, wellbore instability, and differential sticking forces, particularly in highly deviated wellbores. The significant consequences of a stuck pipe include an increase in well costs and Non-Productive Time (NPT), and in the worst-case scenario, the loss of a wellbore section and down-hole equipment, or the need to sidetrack, plug, or abandon the well. This paper provides a comprehensive review of the challenges associated with pipe sticking during drilling operations. The mechanisms of pipe sticking, analysis of differential sticking factors, guiding principles to minimize differential sticking, diagnosis approaches, and different treatment methods are discussed. This paper can serve as a guide for any problem involving stuck pipes in the petroleum industry.
Today, the success or failure of organizations depends to possess the wisdom of their managers promised that the key to organizational success of the business environment, making the right decisions, and create the ability to work and think towards discrimination of products and services the organization . Seek this research to investigation the relationship between the wisdom management and differentiation strategy for service operations . It was a test of that relationship in light of the results of the analysis of the data collected through the questionnaire distributed on a sample from (98) Director Mangers, head of department and head of division in the General Establishment of Civil Aviation . The research used descriptive st
... Show MoreDrilling fluid properties and formulation play a fundamental role in drilling operations. The Classical water-based muds prepared from only the Syrian clay and water without any additives((Organic and industrial polymers) are generally poor in performance. Moreover, The high quantity of Syrian clay (120 gr / l) used in preparing drilling fluids. It leads to a decrease in the drilling speed and thus an increase in the time required to complete the drilling of the well. As a result, the total cost of drilling the well increased, as a result of an increase in the concentration of the solid part in the drilling fluid. In this context, our study focuses on the investigation of the improvement in drilling mud Prepa
... Show MoreThis paper deals with numerical study of the flow of stable and fluid Allamstqr Aniotina in an area surrounded by a right-angled triangle has touched particularly valuable secondary flow cross section resulting from the pressure gradient In the first case was analyzed stable flow where he found that the equations of motion that describe the movement of the fluid
The Rate theory of crack growth in PVC pipe has been studied for creep and fatigue crack propagation. Rate theory function parameters, (RTFP), were estimated theoretically from exponential function parameters, (EFP), to experimental data of crack velocity versus stress intensity factor ,(V-K) diagram, to creep crack propagation . Also (RTFP) were estimated theoretically from (EFP) to experimental data of (V-?K) diagram to fatigue crack propagation. Temperature effect with (RTFP) was discussed. Crack velocity function denoted with stress intensity factor and temperature degrees has been determined to fatigue and creep crack propagation theoretically and comparative results this function with experimental data of (V-K or ?K) diagram .
A skip list data structure is really just a simulation of a binary search tree. Skip lists algorithm are simpler, faster and use less space. this data structure conceptually uses parallel sorted linked lists. Searching in a skip list is more difficult than searching in a regular sorted linked list. Because a skip list is a two dimensional data structure, it is implemented using a two dimensional network of nodes with four pointers. the implementation of the search, insert and delete operation taking a time of upto . The skip list could be modified to implement the order statistic operations of RANKand SEARCH BY RANK while maintaining the same expected time. Keywords:skip list , parallel linked list , randomized algorithm , rank.
The objective of drilling parameters optimization in Majnoon oilfield is to arrive for a methodology that considers the past drilling data for five directional wells at 35 degree of inclination as a baseline for new wells to be drilled. Also, to predicts drilling performance by selecting the applied drilling parameters generated the highest rate of penetration (ROP) at each section. The focal point of the optimization process is to reduce drilling time and associated cost per each well. The results of this study show that the maximum ROP could not be achieved without sufficient flow rate to cool and clean the bit in clay intervals (36" and 24") hole sections. Although the influence of combination of Weight on Bit (WOB), Round per minute
... Show MoreThe objective of drilling parameters optimization in Majnoon oilfield is to arrive for a methodology that considers the past drilling data for five directional wells at 35 degree of inclination as a baseline for new wells to be drilled. Also, to predicts drilling performance by selecting the applied drilling parameters generated the highest rate of penetration (ROP) at each section. The focal point of the optimization process is to reduce drilling time and associated cost per each well. The results of this study show that the maximum ROP could not be achieved without sufficient flow rate to cool and clean the bit in clay intervals (36" and 24") hole sections. Although the influence of combination of Weight on Bit (WOB), Round per mi
... Show More
He research specifies subjects which may contribute in improve productivity of the General Company for vegetable oil product/ Al-Farab factory and aims to release the relationship between system Quick Response Manufacturing (QRM) and scheduling operations.
The Implementation was in the general company for vegetable oil product (Al-Farab factory), Universe Factory It suffers from a failure to follow Scheduling in its operations And not taking into account the lead times And delays in product delivery dates, Here are drawing the attention of the administration in the factory to use Quick Response Manufacturing (QRM) to control the energy and inventory, machin
... Show More
