Pressure retarded osmosis (PRO) can be considered as one of the methods for utilizing osmotic power, which is a membrane-based technology. Mathematical modeling plays an essential part in the development and optimization of PRO energy-generating systems. In this research, a mathematical model was developed for the hollow fiber module to predict the power density and the permeate water flux theoretically. Sodium chloride solution was employed as the feed and draw solution. Different operating parameters, draw solution concentration (1 and 2 M), the flow rate of draw solution (2, 3, and 4 L/min), and applied hydraulic pressure difference (0 - 90 bar) was used to evaluate the performance of PRO process of a hollow fiber module. The effect of these operational parameters was investigated on the theoretical permeate water flux and power density. According to the theoretical results, the permeate water flux and the power density increased with increasing the concentration of draw solution and the flow rate of the draw solution. While decreased with increasing the feed solution concentration. By increasing the applied hydraulic pressure on the draw solution, the water flux decreased and the produced power density increased. The maximum power density and the corresponding permeate water flux of 2 M NaCl draw solution was approximately 16.414 W/m2 and 11.818 LMH respectively, which occurs at an applied hydraulic pressure of 50 bar.
The business process re-engineering is one of the popular concepts at this time because its provide a radical solution for the problems that companies faces. This method appeared because the changes of competition and costumers 'desires at the two last decades. The markets become wider because of the globalization so the companies must change its way to stay a life.
The research aim is to concentrate on the BPR because it's a philosophy aims to re-organize the company's business process to achieve the competitive advantage, the research also aims to a plicate the BPR using cost management technique in the State Company of Vegetable Oils Industry.
&nb
... Show MoreThis research is Interested in how the performance and implementation of factory production engine coolants of the General Company for Electrical Industries of its work, and to facilitate the flow of the decisions of senior management and access to all configurations, to ensure differentiation desired and reduce lost sales, resulting from poor scheduling of operations through the application of certain rules of scheduling operations in the production plant Engines Air-cooler, the objectives of research in identifying the best base and working to reduce the time and cost of Same Rules of Process which are considered the most influential of any organization and thr
... Show MoreOxazepine [1] is non – nomologous seven –member ring that contain two netroatoms (oxygen and nitrogen ). Meanwhile diazepine [2] contains to nitrogen atoms in seven – member ring.
Diazepam (valium) [3] is used to relive anxiety tension associated with anxiety disorder and muscle spasms (1, 2, 3
... Show MoreThe aim of this research is to apply the concept of total value management to improve the process design of producing the toothpaste in Al Mammon factory one of the in the general company of food industry. The concept of total value management is concerning with achieve more than one values which are important for the customers as these values are related to the customers satisfaction. The research problem is that the factory did not measure the effectiveness of process design as this company has weakness in analyzing this effectiveness in synchronies with total value management. On the other side, the company did not give more attention to the cost of products and selling prices within the value cost/ profit which is one of the
... Show MoreA hybrid Gas-Enhanced and Downhole Water Sink-Assisted Gravity Drainage (GDWS-AGD) process has been suggested to enhance oil recovery by placing vertical injectors for CO2 at the top of the reservoir with a series of horizontal oil-producing and water-drainage wells located above and below the oil-water contact, respectively. The injected gas builds a gas cap that drives the oil to the (upper) oil-producing wells while the bottom water-drainage wells control water cresting. The hybrid process of GDWS-AGD process has been first developed and tested in vertical wells to minimize water cut in reservoirs with bottom water drive and strong water coning tendencies. The wells were dual-compl