Excessive torque and drag can be critical limitation during drilling highly deviated oil wells. Using the modeling is regarded as an invaluable process to assist in well planning and to predict and prevent drilling problems. Identify which problems lead to excessive torque and drag to prevent cost losses and equipment damage. Proper modeling data is highly important for knowing and prediction hole problems may occur due to torque and drag and select the best method to avoid these problems related to well bore and drill string. In this study, Torque and drag well plan program from landmark worldwide programming group (Halliburton Company) used to identify hole problems.one deviated well in Zubair oil fields named, ZB-250 selected for analyses the effect of friction factor on torque and effective `tension of the drill string along well depth, moreover the effect of well bore problems such as; mud losses, accumulation of cutting bed in the well bore, stuck pipe, caving, sloughing, high torque and drag values on drill string components and well trajectory. Wells data which include hole section size, mud properties, well profile survey, casing string depth, rig specification, drill string components, drilling parameters like weight on bit, rotary speed and flow rate were used to compare between planning and drilling stages for these wells and identify the reasons of difference between these stages. The results showed a difference for the drilling phase and increasable in effective tension, torque, pick up and slack off drag, measured string weight, and possibility to occur the buckling if compare with planning phase. Wellbore instability, high friction factor, high tortuosity, high flow rate ,stuck pipe , excessive drag spot, partial to total losses, increase of drilling parameters, hard formations and bad hole cleaning, all these factors yield to this difference between planning and actual phases. When drilling hole section 8.5", the main causes of varying were drilling fluid losses, high value of friction factor, stuck pipe and friction forces when the maximum torque was (16 to 20 klb-ft) and pick up weight (20-40 klb)
The present study aimed to identify teaching problems which facing the teachers for first three grades classes, and if these problems different according to some variables teacher qualification, experience period, class grade). The study sample consist of (137 )
female teachers who teach the first three grades in Braimy city in Oman, teachers spread in five government schools. Both researchers developed questionnaire to measure problems faced by the mentioned teachers, consist of 50 questions distributed into 4 dimensions (teacher, students, the curriculum, the evaluations), Also researchers checked questionnaire validity and stability. The results indicate to: The most common probl
... Show MoreBackground: Patients with decompensated cirrhosis are often given therapeutic and prophylactic drugs. Polypharmacy raises both the likelihood of prescription errors and the complications associated with drugs. Clinical pharmacists are excellent at recognizing, addressing, and preventing clinically significant drug-related problems.
Objectives: Identification types of pharmacist interventions to address drug-related problems in patients with decompensated cirrhosis and assess the acceptance/implementation of these recommendations. And identify patient factors associated with accepting pharmacist recommend
... Show MorePrograms and performance budget represents a sophisticated method of public budget numbers, which includes all allocations to be determined for each job or activity within a government entity, which is analyzed according to their needs and costs, and this method can be applied using one of the cost accounting techniques, which is the technique of analyzing the value chain that reduces costs by avoiding activities that do not add value and enhance activities that add value to the economic entity, the current research aims to develop the budget system in government entity by using the budget of programs and performance as a tool for planning and monitoring events and activities, thereby reducing the waste of public money by reducing unnecessa
... Show MoreSet dietary program for some of dietary supplements and training for badminton young players, and identifying effect of taking some of the dietary supplementary for badminton young players. The research population :( badminton young players group (Arminian club). For age group (16-18) years the sample is divided in to two experimental groups within each group (6) players, and two for the exploratory experiment which was within the research sample, they were divided in to two groups, the first group take some of the dietary supplements (multivitamin creating) .the set exercises by the researchers in the main part of the training unit and the second group (amino acids, vitamins) and the set exercises by the researcher. The scientific approach
... Show MorePatients with decompensated cirrhosis have typically prescribed a combination of therapeutic and prophylactic medications. Polypharmacy increases the probability of medication errors and drug related problems. Clinical pharmacists are highly effective at identifying, resolving, and preventing clinically important drug-related problems in their patients' care. The objectives of the study were the identification and classification of drug-related problems, as well as the discussion of these problems with health care providers (physicians, pharmacists, and nurses) and patients. Reduce their incidence as effectively as possible and educate all research participants on the significance of following their prescribed drug regimen
... Show MoreIn this paper, the class of semi
This research aims to know the essence of the correlative relationship between tactical thinking and solving mathematical problems. The researchers followed the descriptive research method to analyze relations, as all students from the mathematics department in the morning study were part of the research group. The research sample of (100) male and female students has been chosen based on the arbitrators' views. The tools for studying the sample of research composed of (12) items of the multiple-choice test in its final form to measure tactical thinking and require establish-ing a test of (6) test-type paragraphs to solve mathematical problems. The findings showed that sample students' tactical thinking and their capacity to overcome mathem
... Show MoreThis study presents the multi criteria single-machine model. The machine scheduling problem (MSP) for ntasks on a single machine involves minimizing a function of three criteria: total completion time (C_j),maximum earliest (E_max), and tardiness (〖ΣT〗_j), This is an NP-hard issue. Within this work's theoretical section, we present the mathematical formulation of The presented topic thenhighlights the usefulness of the dominance rule (DR), which may be used to develop effective solutions. Whilein the practical part, one of the important exact methods; The proposed MSP tricriteria are solved by applyingthe Branch and Bound (BAB) method, which finds a set of efficient solutions for 1//F(ΣC_j ,ΣT_j ,E_max) upto n=100 jobs. The BAB appro
... Show MoreThis paper presents a comparative study between different oil production enhancement scenarios in the Saadi tight oil reservoir located in the Halfaya Iraqi oil field. The reservoir exhibits poor petrophysical characteristics, including medium pore size, low permeability (reaching zero in some areas), and high porosity of up to 25%. Previous stimulation techniques such as acid fracturing and matrix acidizing have yielded low oil production in this reservoir. Therefore, the feasibility of hydraulic fracturing stimulation and/or horizontal well drilling scenarios was assessed to increase the production rate. While horizontal drilling and hydraulic fracturing can improve well performance, they come with high costs, often accounting for up t
... Show MoreGas lift is one of the artificial lift techniques which it is frequently implemented to raise oil production. Conventionally, the oil wells produce depending on the energy of reservoir pressure and solution gas which declines due to continuous production. Therefore, many oil wells after a certain production time become unable to lift oil to the surface. Thus, the continuity of production requires implementation of gas lift which works to decrease the average fluid density in the tubing by injection gas through the annulus into the tubing. This paper aims to get maximum oil production of an Iraqi giant oil field at optimum injected gas rate. The field is located in south of Iraq and in