
A field experiment was carried out during the 2020 season at the College of Agricultural Engineering/ University of Baghdad, Al-Jadriya to evaluate the effect of dry farming when applying water stress under the subsurface drip irrigation system on water productivity and rice yield. The experiment was conducted with three levels of irrigation water stress when 10, 20 and 40% of the available water was depleted and in three dimensions between drip lines 10, 15 and 20 cm. The experiment was designed according to a randomized complete block design, according to the split plot design, with three replications. Determine the depth of irrigation water depending on the moisture depletion of th
The technology of subsurface soil water retention (SWRT) uses a polyethylene trough that is fixed under the root zone of the plant. It is a modern technology to increase the values of water use efficiency, plant productivity and saving irrigation water by applying as little irrigation water as possible. This study work aims at improving the crop yield and water use efficiency of a cucumber plant with less applied irrigation water by installing membrane trough below the soil surface. The field experiment was conducted in the Hawr Rajab District of Baghdad Governorate in Winter 2018 for testing various trickle irrigation systems. Two agricultural treatment plots were utilized in a greenhouse for the compa
... Show MoreGas and downhole water sink assisted gravity drainage (GDWS-AGD) is a promising gas-based enhanced oil recovery (EOR) process applicable for reservoirs associated with infinite aquifers. However, it can be costly to implement because it typically involves the drilling of multiple vertical gas-injection wells. The drilling and well-completion costs can be substantially reduced by using additional completions for gas injection in the oil production wells through the annulus positioned at the top of the reservoir. Multi-completion-GDWS-AGD (MC-GDWS-AGD) can be configured to include separate completions for gas injection, oil, and water production in individual wells. This study simulates
Oily wastewater is one of the most challenging streams to deal with especially if the oil exists in emulsified form. In this study, electrospinning method was used to prepare nanofiberous polyvinylidene fluoride (PVDF) membranes and study their performance in oil removal. Graphene particles were embedded in the electrospun PVDF membrane to enhance the efficiency of the membranes. The prepared membranes were characterized using a scanning electron microscopy (SEM) to verify the graphene stabilization on the surface of the membrane homogeneously; while FTIR was used to detect the functional groups on the membrane surface. The membrane wettability was assessed by measuring the contact angle. The PVDF and PVDF / Graphene membranes efficiency
... Show MoreInvestigation of the adsorption of acid fuchsin dye (AFD) on Zeolite 5A is carried out using batch scale experiments according to statistical design. Adsorption isotherms, kinetics and thermodynamics were demonstrated. Results showed that the maximum removal efficiency was using zeolite at a temperature of 93.68751 mg/g. Experimental data was found to fit the Langmuir isotherm and pseudo second order kinetics with maximum removal of about 95%. Thermodynamic analysis showed an endothermic adsorption. Optimization was made for the most affecting operating variables and a model equation for the predicted efficiency was suggested.
Hydrogen sulfide removal catalyst was prepared chemically by precipitation of zinc bicarbonate at a controlled pH. The physical and chemical catalyst characterization properties were investigated. The catalyst was tested for its activity in adsorption of H2S using a plant that generates the H2S from naphtha hydrodesulphurization and a unit for the adsorption of H2S. The results comparison between the prepared and commercial catalysts revealed that the chemical method can be used to prepare the catalyst with a very good activity.
It has observed that the hydrogen sulfide removal over zinc oxide catalyst follows first order reaction kinetics with activation energy of 19.26 kJ/mole and enthalpy and e
... Show MoreBackground: The purpose of this study is to compare the color changes between the bonded middle third and the unbonded gingival and incisal thirds, fallowing fixed orthodontic treatment Material and method: The color parameter l, a, b has been recorded for each thirds in upper anterior teeth by mean of easy shad device. The has been calculated for gingival, middle and incisal thirds for the upper anterior teeth in 34 patient, 17 males and 17femals, those subject undergone fixed orthodontic treatment Results: The in middle bonded third is highly significant higher than that in incise and gingival thirds p<0.01 because the middle third isn’t expose to oral fluid and dental brushing since it covered by the bracket. Also there
... Show MoreBackground: The aim of this study is to evaluate the color change ∆E of the dental enamel following treatment with 2 kinds of protector (icon infiltrant, clinpro varnish) before fixed orthodontic treatment to avoid the possible white spot lesions. Materials and Methods: Fifty four subjects treated with fixed appliances were divided into 3 groups: the 1st group was control, while the 2nd and 3rd groups were treated with icon infiltrant and clinpro varnish before bonding procedure, respectively. Color parameters (L,a,b) were recorded for the middle and gingival thirds before and after bonding procedure to get the ∆E of each group. Results: One-way ANOVA test showed a non-significant difference in ∆E between the 3 groups a
... Show MoreThe waste sorting and recycling plant in the district of al- Mahmudiya (Yusufiya) is the only laboratory in Baghdad governorate. It is the only one in Iraq that collects and recycles waste. After sorting, we have packages of raw materials (aluminum cans, glass bottles, plastic bottles, Nylon bags) as well as natural fertilizers (food residues and others) and a sanitary landfill with specifications that meet international standards; However, the absence of a structure for the management of the plant (manager, assistant manager, accountant, etc.) in addition to the non-supply of waste on a daily and continuous basis and the lack of cooperation of the Municipality of Baghdad with the management of the plant led to delay in the work
... Show More