The sunrise, sunset, and day length times for Baghdad (Latitude =33.34º N, Longitude =44.43º E) were calculated with high accuracy on a daily basis during 2019. The results showed that the earliest time of sunrise in Baghdad was at 4h: 53m from 5 Jun. to 20 Jun while the latest was at 7h: 07m from 5 Jan. to 11 Jan. The earliest time of sunset in Baghdad was at16 h: 55m from 30 Nov. to 10 Dec. whereas the latest was at 19h: 16m from 25 Jun. to 5 Jul. The minimum period of day length in Baghdad was 9h: 57m) in 17 Dec. whereas the maximum period was 14h: 22m) in 20 Jun. Day length was calculated and compared among regions of different latitudes(0, 15, 30, 45 and 60 north).
Flavonoids were extracted from Zizyphus spina-christi leaves by Ethyl acetate after acid digested and used as antioxidant. The dried extract was added separately to each sample of fat extracted from hallow cow and sheep bones as follows: T1 cow fat, T2 control for cow fat, T3 sheep fat and T4 control for sheep fat (the control T2 and T4 reffered to samples without added antioxidant).
Samples were stored at -18, 5, 25 and 55 °C for 28 days. The storage trials were conducted at -18, 5 and 25 °C for 28 days for T1, T2, T3 and T4. The chemical indices examined initially and at the end of storage period. PVs was 1.46, 1.46, 1.8 and 1.8 meq/ Kg oil respectively, FFA values were 0.245, 0.245, 0.244 and 0.244% respectively and TBA va
The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tend
... Show MoreThe purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tender phase of
... Show MoreThis article aims to establish and evaluate standards for critical equipment and materials in highway projects in Iraq. Delphi technique has been used to analyze, explore, and discover the main criteria and sub-criteria that affect equipment and materials in highway construction projects in Iraq. To determine the correct response to the criteria presented in this study, a program (IBM, SPSS/V25) was used to assess the main criteria and sub-criteria using the mean score (MS) and standard deviation (SD) technique, as well as to check reliability using Cronbach's alpha factor (α). The experts' qualifications and the extent to which the person is ready to commit are both important factors in panel selection. The design of a
... Show MoreThis article presents the results of an experimental investigation of using carbon fiber–reinforced polymer sheets to enhance the behavior of reinforced concrete deep beams with large web openings in shear spans. A set of 18 specimens were fabricated and tested up to a failure to evaluate the structural performance in terms of cracking, deformation, and load-carrying capacity. All tested specimens were with 1500-mm length, 500-mm cross-sectional deep, and 150-mm wide. Parameters that studied were opening size, opening location, and the strengthening factor. Two deep beams were implemented as control specimens without opening and without strengthening. Eight deep beams were fabricated with openings but without strengthening, while
... Show MoreThis article presents the results of an experimental investigation of using carbon fiber–reinforced polymer sheets to enhance the behavior of reinforced concrete deep beams with large web openings in shear spans. A set of 18 specimens were fabricated and tested up to a failure to evaluate the structural performance in terms of cracking, deformation, and load-carrying capacity. All tested specimens were with 1500-mm length, 500-mm cross-sectional deep, and 150-mm wide. Parameters that studied were opening size, opening location, and the strengthening factor. Two deep beams were implemented as control specimens without opening and without strengthening. Eight deep beams were fabricated with openings but without strengthening, while
... Show MoreThe Feedback Concept has been spread as an organized trend for scientific research since it has a significant importance for human behavior and how it has been directed and controlled by the individual, feedback has numerous definitions but the simplest definition is; feedback is the information received by the individual from the output of his behavior, In addition to the mutual relationship between the individual and the stimulation that provide him with the basic information by the biological control of his behavior, Since feedback cannot be accomplished without receiving information from the inner and outer environment, the biological and physiological information become the ma
... Show More