There are many events which causes nonproductive time (NPT) in the drilling industry. The mostly effective in this NPT is pipe sticking event. A considerable amount of time and resources can be spent in efforts to free a stuck pipe. In addition, Unsuccessful fishing operations results in costly alternatives including side-tracking. The drilling in Khabaz oil field poses many operational challenges among of them stuck pipe , lost circulation, flow of salt water during drilling, and hole caving. Stuck pipe can be considered the quite difficult problem in Khabaz oil field due to associated incidents which lead to NPT activities.
Well Khabaz -34 was selected to study the problem of stuck pipe in this field. An analysis of stuck pipe events was made by using the graphical analysis software Easy View. The results were then discussed to identify the causes of stuck pipe. Finally, recommendation to select proper type /drilling fluid rheology properties, optimize casing seat design to reduce probability of stuck pipe.
Fresh water production from saline or waste water utilizing solar stills is the secured future approach in water industry with low cost and no environmental pollution accompanied with low productivity. In this work, the effect of inserting different available materials in a passive Single Slope Solar SSS stills on their productivity is accomplished. Side by side tests are performed on a conventional still, and three SSS stills inserted with carbon filter media, Copper wire mesh, and Cellulose sheets. All these stills are symmetrical in dimensions with 0.5 m2 base area tested for 20mm water level. The stills have been manufactured, instrumented, and tested in July 2021 under DhiQar-Iraq climate conditions (latitude 31.2° N, longitude 46.34
... Show MoreThe research topic was chosen because of the importance of communication in organizations in general and the marketing process in particular. Without communication, the organization can not live and continue ,The problem of study diagnosis the reduction in sales in the company of plant oils in some its classes and weakness in differentiation and its reputation at market in spit if having good products with standardized features And lack of customer communication channels, also the company does not have any whole view about the concept of marketing communication, Therefore, This sudy aimed ro define to know the type of relationship between the extent of the impact of the integrated marketing
... Show MoreThe purpose of this work is to study the classification and construction of (k,3)-arcs in the projective plane PG(2,7). We found that there are two (5,3)-arcs, four (6,3)-arcs, six (7,3)arcs, six (8,3)-arcs, seven (9,3)-arcs, six (10,3)-arcs and six (11,3)-arcs. All of these arcs are incomplete. The number of distinct (12,3)-arcs are six, two of them are complete. There are four distinct (13,3)-arcs, two of them are complete and one (14,3)-arc which is incomplete. There exists one complete (15,3)-arc.
This paper provides an attempt for modeling rate of penetration (ROP) for an Iraqi oil field with aid of mud logging data. Data of Umm Radhuma formation was selected for this modeling. These data include weight on bit, rotary speed, flow rate and mud density. A statistical approach was applied on these data for improving rate of penetration modeling. As result, an empirical linear ROP model has been developed with good fitness when compared with actual data. Also, a nonlinear regression analysis of different forms was attempted, and the results showed that the power model has good predicting capability with respect to other forms.
Bored piles settlement behavior under vertical loaded is the main factor that affects the design requirements of single or group of piles in soft soils. The estimation of bored pile settlement is a complicated problem because it depends upon many factors which may include ground conditions, validation of bored pile design method through testing and validation of theoretical or numerical prediction of the settlement value. In this study, a prototype single and bored pile group model of arrangement (1*1, 1*2 and 2*2) for total length to diameter ratios (L/D) is 13.33 and clear spacing three times of diameter, subjected to vertical axial loads. The bored piles model used for the test was 2000
... Show More