There are many events which causes nonproductive time (NPT) in the drilling industry. The mostly effective in this NPT is pipe sticking event. A considerable amount of time and resources can be spent in efforts to free a stuck pipe. In addition, Unsuccessful fishing operations results in costly alternatives including side-tracking. The drilling in Khabaz oil field poses many operational challenges among of them stuck pipe , lost circulation, flow of salt water during drilling, and hole caving. Stuck pipe can be considered the quite difficult problem in Khabaz oil field due to associated incidents which lead to NPT activities.
Well Khabaz -34 was selected to study the problem of stuck pipe in this field. An analysis of stuck pipe events was made by using the graphical analysis software Easy View. The results were then discussed to identify the causes of stuck pipe. Finally, recommendation to select proper type /drilling fluid rheology properties, optimize casing seat design to reduce probability of stuck pipe.
Radiological assessment for the East Baghdad oilfield-southern part was conducted in the current study. 10 samples (scale, soil, sludge, water, and oil) from the different stages of oil production were collected. 232Th, 226Ra, and 40K in the samples were analyzed with 40% efficiency for Gamma spectrometry. system based on HPGe. The findings indicated that the examined sites exhibit comparatively lower levels of NORM contamination, in contrast to other global oilfields. Nevertheless, certain areas, particularly those within separation stages, demonstrate relatively elevated NORM concentrations exceeding the global average in soil and sludge. The maximum value of 226Ra, 232Th, was found in sludge sample the findings indicated that ove
... Show MoreThis research study Blur groups (Fuzzy Sets) which is the perception of the most modern in the application in various practical and theoretical areas and in various fields of life, was addressed to the fuzzy random variable whose value is not real, but the numbers Millbh because it expresses the mysterious phenomena or uncertain with measurements are not assertive. Fuzzy data were presented for binocular test and analysis of variance method of random Fuzzy variables , where this method depends on a number of assumptions, which is a problem that prevents the use of this method in the case of non-realized.
Intelligent or smart completion wells vary from conventional wells. They have downhole flow control devices like Inflow Control Devices (ICD) and Interval Control Valves (ICV) to enhance reservoir management and control, optimizing hydrocarbon output and recovery. However, to explain their adoption and increase their economic return, a high level of justification is necessary. Smart horizontal wells also necessitate optimizing the number of valves, nozzles, and compartment length. A three-dimensional geological model of the As reservoir in AG oil field was used to see the influence of these factors on cumulative oil production and NPV. After creating the dynamic model for the As reservoir using the program Petrel (2017.4), we
... Show MoreThe essence of the new work in the satellite TV channels is to provide news coverage of news that will inform the people of what is going on around them in order to increase their political, social, economic and cultural awareness and this drives them to take positions or certain behaviors on according to what the communicator in these channels wants. News and news reports are generally used as a psychological variable to influence public opinion and does not offer interestingness and information. Therefore, satellite TV channels have assumed special attention towards their correspondents desiring to achieve scoop in news coverage and to have the final word in reading events and install it
... Show MoreThe incorporation of safety characteristics into the traditional pavement structural design or in the functional evaluation of pavement condition has not been established yet. The design has focused on the structural capacity of the roadway so that the pavement can withstand specific level of repetitive loading over the design life. On the other hand, the surface texture condition was neither included in the AASHTO design procedure nor in the present serviceability index measurements.
The pavement surface course should provide adequate levels of friction and ride quality and maintain low levels of noise and roughness. Many transportation departments perform routine skid resistant testing, the type of equipment us
... Show MoreThis paper analyzes the effect of scaling-up model and acceleration history on seismic response of closed-ended pipe pile using a finite element modeling approach and the findings of 1 g shaking table tests of a pile embedded in dry and saturated soils. A number of scaling laws were used to create the numerical modeling according to the data obtained from 1 g shake table tests performed in the laboratory. The current study found that the behaviors of the scaled models, in general have similar trends. From numerical modeling on both the dry and saturated sands, the normalized lateral displacement, bending moment, and vertical displacement of piles with scale factors of 2 and 35 are less than those of the pile with a scale factor of 1 and the
... Show MoreTotal quality management is considered a modern management concept that achieved success in all fields of various industrial and service sectors in advanced countries . One of these sectors is insurance. This concept aims at improving and developing the performance of insurance service continually . It is the gate that can enable radical change in the organization culture inside the company to transform it from using the traditional management style into using the modern style which achieves high quality standard of insurance service . As a result many insurance companies headed to applying the principles of total quality management in their companies . This study aims at raising the standard of the performance of the Iraqi Insurance Com
... Show MoreThis article presents test results documentation for four grouted ground anchors embedded in sandy soil. Three anchors were trial, while one was a working anchor. One trial anchor is instrumented with eight resistance-type strain gauges glued on the corrugated pipe and embedded within the grouted body. An acceptance test was made for all anchors to determine the working load. Acceptance criteria suggested by the Post-Tensioning Institute were applied, and the working anchor did not pass the creep criterion, so it was taken out of service. The strain measurements indicated that the compression stresses were generated along the free length, while the tension stresses were generated alon
Gas lift is one of the artificial lift techniques which it is frequently implemented to raise oil production. Conventionally, the oil wells produce depending on the energy of reservoir pressure and solution gas which declines due to continuous production. Therefore, many oil wells after a certain production time become unable to lift oil to the surface. Thus, the continuity of production requires implementation of gas lift which works to decrease the average fluid density in the tubing by injection gas through the annulus into the tubing. This paper aims to get maximum oil production of an Iraqi giant oil field at optimum injected gas rate. The field is located in south of Iraq and in