Preferred Language
Articles
/
ijcpe-508
Analysis of Stuck Pipe Incidents in Khabaz Field
...Show More Authors

There are many events which causes nonproductive time (NPT) in the drilling industry. The mostly effective in this NPT is pipe sticking event. A considerable amount of time and resources can be spent in efforts to free a stuck pipe. In addition, Unsuccessful fishing operations results in costly alternatives including side-tracking. The drilling in Khabaz oil field poses many operational challenges among of them stuck pipe , lost circulation, flow of salt water during drilling, and hole caving. Stuck pipe can be considered the quite difficult problem in Khabaz oil field due to associated incidents which lead to NPT activities.
Well Khabaz -34 was selected to study the problem of stuck pipe in this field. An analysis of stuck pipe events was made by using the graphical analysis software Easy View. The results were then discussed to identify the causes of stuck pipe. Finally, recommendation to select proper type /drilling fluid rheology properties, optimize casing seat design to reduce probability of stuck pipe.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Tue Sep 07 2021
Journal Name
Journal Of Petroleum Exploration And Production Technology
Wellbore instability management using geomechanical modeling and wellbore stability analysis for Zubair shale formation in Southern Iraq
...Show More Authors
Abstract<p>Wellbore instability problems cause nonproductive time, especially during drilling operations in the shale formations. These problems include stuck pipe, caving, lost circulation, and the tight hole, requiring more time to treat and therefore additional costs. The extensive hole collapse problem is considered one of the main challenges experienced when drilling in the Zubair shale formation. In turn, it is caused by nonproductive time and increasing well drilling expenditure. In this study, geomechanical modeling was used to determine a suitable mud weight window to overpass these problems and improve drilling performance for well development. Three failure criteria, including Mohr–Coulomb, modifie</p> ... Show More
View Publication
Scopus (40)
Crossref (40)
Scopus Clarivate Crossref
Publication Date
Tue Dec 22 2020
Journal Name
Collaboration And Integration In Construction, Engineering, Management And Technology
A Hybrid Conceptual Model for BIM Adoption in Facilities Management: A Descriptive Analysis for the Collected Data
...Show More Authors

View Publication
Scopus (3)
Scopus Crossref
Publication Date
Thu Jun 10 2021
Journal Name
Engineering, Technology &amp; Applied Science Research
Corruption Risk Analysis at the Project Planning Stage in the Iraqi Construction Sector using the Bowtie Methodology
...Show More Authors

In this paper, the bowtie method was utilized by a multidisciplinary team in the Federal Board of Supreme Audit (FBSA)for the purpose of managing corruption risks threatening the Iraqi construction sector. Corruption in Iraq is a widespread phenomenon that threatens to degrade society and halt the wheel of economic development, so it must be reduced through appropriate strategies. A total of eleven corruption risks have been identified by the involved parties in corruption and were analyzed by using probability and impact matrix and their priority has been ranked. Bowtie analysis was conducted on four factors with high score risk in causing corruption in the planning stage. The number and effectiveness of the existing proactive meas

... Show More
View Publication
Scopus (6)
Crossref (5)
Scopus Clarivate Crossref
Publication Date
Wed Sep 30 2020
Journal Name
Cfd Letters
Numerical Analysis for Solar Panel Subjected with an External Force to Overcome Adhesive Force in Desert Areas
...Show More Authors

View Publication
Scopus (19)
Crossref (19)
Scopus Crossref
Publication Date
Thu Aug 01 2024
Journal Name
International Communications In Heat And Mass Transfer
Accelerated melting dynamics in latent-heat storage systems via longitudinal and circular fins: A comprehensive 3D analysis
...Show More Authors

View Publication
Scopus (16)
Crossref (15)
Scopus Crossref
Publication Date
Tue Dec 01 2020
Journal Name
Journal Of Economics And Administrative Sciences
Analysis of the structure of salaries of public sector workers for strategic planning purposes An analytical study in the general body of groundwater
...Show More Authors

The research discusses the problem of salaries in the public sector in terms of the process of analyzing its structure and the possibility of benefiting from the information provided by the analysis process for the strategic planning process, and the General Authority for Groundwater has been adopted and one of the formations of the Ministry of Water Resources, which is centrally funded, to represent the salary structure of its employees (1117) employees be a field of research, as the salary structure in it was analyzed for the period between (2014-2019) using the quantitative approach to analysis and by relying on a number of statistical tools in the analysis process, including mathematical circles, upper limits, lower limits, p

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Mar 08 2026
Journal Name
Journal Of Oral And Dental Research
Prevalence of Orofacial Clefts: A Retrospective Crosssectional Analysis of Gynecology and Obstetrics Hospital Records in the City of Sulaimani, Kurdistan Region of Iraq
...Show More Authors

View Publication Preview PDF
Publication Date
Thu Mar 31 2022
Journal Name
Iraqi Geological Journal
Geological Model of the Khabour Reservoir for Studying the Gas Condensate Blockage Effect on Gas Production, Akkas Gas Field, Western Iraq
...Show More Authors

The Khabour reservoir, Ordovician, Lower Paleozoic, Akkas gas field which is considered one of the main sandstone reservoirs in the west of Iraq. Researchers face difficulties in recognizing sandstone reservoirs since they are virtually always tight and heterogeneous. This paper is associated with the geological modeling of a gas-bearing reservoir that containing condensate appears while production when bottom hole pressure declines below the dew point. By defining the lithology and evaluating the petrophysical parameters of this complicated reservoir, a geological model for the reservoir is being built by using CMG BUILDER software (GEM tool) to create a static model. The petrophysical properties of a reservoir were computed using

... Show More
Scopus (4)
Scopus Crossref
Publication Date
Thu Dec 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
Integrative analysis of the value & supply chains and its impact in supporting customer value An application study in Southern Cement Company - Kufa Cement Plant
...Show More Authors

Abstract\

The value chain analysis is main tools to achieve effective and efficient cost management; it requires a depth and comprehensive understanding for all internal and external activities associated with creating value.  Supply chain as apart of value chain, that means managing it in active and efficient can achieve great results when adopting a comprehensive and integrated performance for these two chains activities. The research aims to identify possible ways to integrate the performance of value and supply chains of the sample" Kufa-cement plant" and determine the effect of this integration in enhancing customer value. The research arrival that logical and integrated analysis of value and supply chains helps

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Thu Nov 02 2023
Journal Name
Journal Of Engineering
Prediction Unconfined Compressive Strength for Different Lithology Using Various Wireline Type and Core Data for Southern Iraqi Field
...Show More Authors

Unconfined Compressive Strength is considered the most important parameter of rock strength properties affecting the rock failure criteria.  Various research have developed rock strength for specific lithology to estimate high-accuracy value without a core.  Previous analyses did not account for the formation's numerous lithologies and interbedded layers. The main aim of the present study is to select the suitable correlation to predict the UCS for hole depth of formation without separating the lithology. Furthermore, the second aim is to detect an adequate input parameter among set wireline to determine the UCS by using data of three wells along ten formations (Tanuma, Khasib, Mishrif, Rumaila, Ahmady, Maudud, Nahr Um

... Show More
View Publication Preview PDF
Crossref (2)
Crossref