Numerical Investigation was done for steady state laminar mixed convection and thermally and hydrodynamic fully developed flow through horizontal rectangular duct including circular core with two cases of time periodic boundary condition, first case on the rectangular wall while keeping core wall constant and other on both the rectangular duct and core walls. The used governing equations are continuity momentum and energy equations. These equations are normalized and solved using the Vorticity-Stream function and the Body Fitted Coordinates (B.F.C.) methods. The Finite Difference approach with the Line Successive Over Relaxation (LSOR) method is used to obtain all the computational results the (B.F.C.) method is used to generate the grid of the problem. A computer program (Fortan 90) is built to calculate Nusselt Number (Nu) in steady state. The fluid Prandtl number is 0.7 Rayleigh Number 1<Ra<106, Reynolds number 1<Re<2000. For the range of parameters considered, results show that the time periodic boundary condition enhance heat transfer. It is also indicated in the results that heat transfer from the surface of the circle exceeds that of the rectangle duct. Comparisons with other research show good agreement.
ABSTRACT— In primary teeth, root canal treatment is a time consuming and challenging procedure, particularly during the most important step in endodontic treatment which is the preparation of the canal. Pulpectomy is the treatment of choice in all the necrotic primary teeth. For better treatment protocol, advancing technology brought the rotary system to reduce the manual dexterity and improve the quality of treatment for pulpectomy. This study aimed to compare and assess the efficacy of cleaning and the time required for the instrumentation during the preparation of root canals of the primary molars using the rotary and the manual (conventional) systems. Thirty root canals of primary teeth were selected. These teeth submitted to a
... Show MoreObjective: Aimed to asses the role of PT estimation in early diagnosis and predicting the extent and the outcome of head injury with ICerH and/ or Contusion
Method :PT was measured by Digiclot 818
Group –1: One hundred consecutive head injured patients admitted at Neurosurgical and Al Ramadi teaching hospitals were initially estimated for prothrombin time and subsequently scanned
Group-2 : Two hundred twenty five consecutive non scanned head injured patients admitted to Neurosurgical and Al Ramadi teaching hospitals were estimated with prothrombin time at the time of insult and subsequently for the next two weeks Al – Kindy Col Med J 2012; Vol. 8 No. 1 P: 54
Clinical and neurological evaluation (GCS) score in addition to
As is known that the consumer price index (CPI) is one of the most important price indices because of its direct effect on the welfare of the individual and his living.
We have been address the problem of Strongly seasonal commodities in calculating (CPI) and identifying some of the solution.
We have used an actual data for a set of commodities (including strongly seasonal commodities) to calculate the index price by using (Annual Basket With Carry Forward Prices method) . Although this method can be successfully used in the context of seasonal&nbs
... Show MoreMany organizations today are interesting to implementing lean manufacturing principles that should enable them to eliminating the wastes to reducing a manufacturing lead time. This paper concentrates on increasing the competitive level of the company in globalization markets and improving of the productivity by reducing the manufacturing lead time. This will be by using the main tool of lean manufacturing which is value stream mapping (VSM) to identifying all the activities of manufacturing process (value and non-value added activities) to reducing elimination of wastes (non-value added activities) by converting a manufacturing system to pull instead of push by applying some of pull system strategies a
... Show MoreA novel planar type antenna printed on a high permittivity Rogers’ substrate is proposed for early stage microwave breast cancer detection. The design is based on a p-shaped wide-slot structure with microstrip feeding circuit to eliminate losses of transmission. The design parameters are optimized resulting in a good reflection coefficient at −10 dB from 4.5 to 10.9 GHz. Imaging result using inhomogeneous breast phantom indicates that the proposed antenna is capable of detecting a 5 mm size cancerous tumor embedded inside the fibroglandular region with dielectric contrast between the target and the surrounding materials ranging from 1.7 : 1 to 3.6 : 1.
At present, the ability to promote national economy by adjusting to political, economic, and technological variables is one of the largest challenges faced by organization productivity. This challenge prompts changes in structure and line productivity, given that cash has not been invested. Thus, the management searches for investment opportunities that have achieved the optimum value of the annual increases in total output value of the production line workers in the laboratory. Therefore, the application of dynamic programming model is adopted in this study by addressing the division of investment expenditures to cope with market-dumping policy and to strive non-stop production at work.