Water flooding is one of the most important methods used in enhanced production; it was a pioneer method in use, but the development of technology within the oil industry, takes this subject toward another form in the oil production and application in oil fields with all types of oils and oil reservoirs. Now days most of the injection wells directed from the vertical to re-entry of full horizontal wells in order to get full of horizontal wells advantages.
This paper describes the potential benefits for using of re-entry horizontal injection wells as well as combination of re –entry horizontal injection and production wells. Al Qurainat productive sector was selected for study, which is one of the four main productive sectors of South Rumaila oil field. A simulation model – named as SRFQ was used in the present work to predict the re-entry horizontal wells performance.
Four scenarios were suggested to cover the full scope of the study; those scenarios are different in manner of wells combinations. Cumulative oil production, ultimate recovery percentage are two criteria were used to predict the performance and comparison of scenarios.
Results from simulation model (SRFQ) runs revealed that the productive sector can be continue to gain 1564.331 MMSTB till 2020, without changing to any existing injection and production wells status, which is called the base scenario. While scenario no.1 needs some of work over and remedies jobs, which gives more cumulative oil production reaches to 1698.481 MMSTB till 2020.
On another side, scenarios no. 2 and 4 are the most important scenarios because re-entry horizontal injection wells were implemented. Very good and encourage results were gained over the bas scenario from the sector under study.
At last, scenario no.3 was suggested just to predict the production capacity of the Al Qurainat sector with re-entry horizontal production wells and existing vertical injection and production wells, while the cumulative oil production reaches 3398.481MMSTB.
A water resources management for earthen canal/stream is introduced through creating a combination procedure between a field study and the scientific analytical concepts that distinguish the hydraulic problems on this type of stream with using the facilities that are available in HECRAS software; aiming to point the solutions of these problems. Al Mahawil stream is an earthen canal which is subjected to periodic changes in cross sections due to scour, deposition, and incorrect periodic dredging processes due to growth of the Ceratophyllum plants and weeds on the bed and banks of the stream; which affect the characteristics of the flow. This research aims to present a strategy of water resources management through a field study that conducte
... Show MoreThe growing demand for sustainable and environmentally friendly alternatives in road construction has led to the exploration of bio-based materials for bitumen modification. This study investigates the use of sugarcane molasses (SM) as a partial replacement of bitumen, evaluating its performance through an interlaboratory study conducted in India and Iraq. Bio-bitumen binders were prepared by partially replacing 30% of conventional bitumen with sugarcane molasses, and their chemical and thermal behaviour was studied. Additionally, laboratory tests were conducted on bio-bitumen mixtures, evaluating rutting resistance, cracking resistance, moisture susceptibility, and stiffness characteristics. A mechanistic-empirical pavement analysis using
... Show MoreThe separation of fluid-fluid mixtures is a major issue in various sectors. The liquid-liquid hydro-cyclone has a wide range of applications in various sectors due to its great efficiency in separating fluid mixtures, ease of installation, and low cost. In crude oil production, high water is consumed following the degrading of production quality, high processing costs, costs, and environmental impacts. Axial hydro cyclone is a tool for Downhole Oil/Water Separation (DOWS) in the petroleum production industry, but it has limitations. The main purpose of this work is to simulate the effect of compacting the conventional inline hydro cyclone with a converging-diverging nozzle on the oil/water dynamic flow and the separation process to
... Show MoreIn low-latitude areas less than 10° in latitude angle, the solar radiation that goes into the solar still increases as the cover slope approaches the latitude angle. However, the amount of water that is condensed and then falls toward the solar-still basin is also increased in this case. Consequently, the solar yield still is significantly decreased, and the accuracy of the prediction method is affected. This reduction in the yield and the accuracy of the prediction method is inversely proportional to the time in which the condensed water stays on the inner side of the condensing cover without collection because more drops will fall down into the basin of the solar-still. Different numbers of scraper motions per hour (NSM), that is
... Show MoreProductivity estimating of ready mixed concrete batch plant is an essential tool for the successful completion of the construction process. It is defined as the output of the system per unit of time. Usually, the actual productivity values of construction equipment in the site are not consistent with the nominal ones. Therefore, it is necessary to make a comprehensive evaluation of the nominal productivity of equipment concerning the effected factors and then re-evaluate them according to the actual values.
In this paper, the forecasting system was employed is an Artificial Intelligence technique (AI). It is represented by Artificial Neural Network (ANN) to establish the predicted model to estimate wet ready mixe
... Show MoreThe Karolinka earth-fill dam was constructed between 1977 and 1984 on the Stanovnice river above the town of Karolinka in the region of Vsetínsko in Czech Republic. Because of leakage on the downstream dam face due to technological indiscipline when filling dam layers during the dam construction stage, there were some steps to improve state dam safety. The final rehabilitation is to construct the diaphragm walls from self-hardening cement-bentonite suspension along the length of the dam. In addition to connecting the gallery and abutment (2 × 25 m long) by using jet piles. The article presents numerical modeling of safety factor evaluation associated with the state of the dam body and foundation; before, and after seal
... Show MoreAn evaluation the performance of the irrigation system for the Al-Ishaqi irrigation project for the Eastern Canal was conducted to identify management strategies that can be used to improve the operation and performance of the irrigation system. The study area is located in Salah al-Din G.0overnorate, Iraq. The field work included determining the moisture content of the soil before and after irrigation, measuring the inflow of the field to find the depth of the applied water, field monitoring, and measuring the depth of the root zone for each irrigation process. Field measurements showed that the average efficiency of water application for the two fields (A, and B) are 59.81% and 38.6%, respectively. The results of the efficiency of
... Show MoreThe search aims to find out the most important requirements for the success of marshes investment and maximize the expected returns of investment was marked by a problem find aquestion for availability requirements necessary for the success of marshes investment has a research community owners decision in the province Maysan the most important conclusions to the search is that the investment great importance in support of the economy and raising the cultural and social level, there is no investment successful but only with configure the investment environment appropriate economic, social, cultural, political, and security ways. the most important recommendations are working on the provision of the investment environment appropria
... Show MoreAbstract:
There is a close relationship between rigidity and distort structure of production and productivity and inflation rates. The effects of this relationship are distorted the contribution rate of the productive sectors and the disproportionate of exchange rate in foreign trade.
raising the general level of prices is one of the way that have been used by previous governments (inflationary financing or deficit financing) in order to speed up the process of capital formation, depending on the availability of economic resources idle.
The fabricating inflation for development does not represent a true understanding of the nature of the
... Show More