Preferred Language
Articles
/
ijcpe-338
Increasing of Oil Field Productivity by Implementation of Re-entry Horizontal Injection Well, Case study
...Show More Authors

Water flooding is one of the most important methods used in enhanced production; it was a pioneer method in use, but the development of technology within the oil industry, takes this subject toward another form in the oil production and application in oil fields with all types of oils and oil reservoirs. Now days most of the injection wells directed from the vertical to re-entry of full horizontal wells in order to get full of horizontal wells advantages.
This paper describes the potential benefits for using of re-entry horizontal injection wells as well as combination of re –entry horizontal injection and production wells. Al Qurainat productive sector was selected for study, which is one of the four main productive sectors of South Rumaila oil field. A simulation model – named as SRFQ was used in the present work to predict the re-entry horizontal wells performance.
Four scenarios were suggested to cover the full scope of the study; those scenarios are different in manner of wells combinations. Cumulative oil production, ultimate recovery percentage are two criteria were used to predict the performance and comparison of scenarios.
Results from simulation model (SRFQ) runs revealed that the productive sector can be continue to gain 1564.331 MMSTB till 2020, without changing to any existing injection and production wells status, which is called the base scenario. While scenario no.1 needs some of work over and remedies jobs, which gives more cumulative oil production reaches to 1698.481 MMSTB till 2020.
On another side, scenarios no. 2 and 4 are the most important scenarios because re-entry horizontal injection wells were implemented. Very good and encourage results were gained over the bas scenario from the sector under study.
At last, scenario no.3 was suggested just to predict the production capacity of the Al Qurainat sector with re-entry horizontal production wells and existing vertical injection and production wells, while the cumulative oil production reaches 3398.481MMSTB.

View Publication Preview PDF
Quick Preview PDF
Publication Date
Wed Mar 29 2023
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Estimation Pore and Fracture Pressure Based on Log Data; Case Study: Mishrif Formation/Buzurgan Oilfield at Iraq
...Show More Authors

Prediction of the formation of pore and fracture pressure before constructing a drilling wells program are a crucial since it helps to prevent several drilling operations issues including lost circulation, kick, pipe sticking, blowout, and other issues. IP (Interactive Petrophysics) software is used to calculate and measure pore and fracture pressure. Eaton method, Matthews and Kelly, Modified Eaton, and Barker and Wood equations are used to calculate fracture pressure, whereas only Eaton method is used to measure pore pressure. These approaches are based on log data obtained from six wells, three from the north dome; BUCN-52, BUCN-51, BUCN-43 and the other from the south dome; BUCS-49, BUCS-48, BUCS-47. Along with the overburden pressur

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Oct 27 2024
Journal Name
Journal Of Economics And Administrative Sciences
An Integrated Approach to Constraints Theory and Fuzzy Analytical Hierarchy Process (FAHP) in Construction Projects (Case Study)
...Show More Authors

The research endeavors to harness the benefits stemming from the integration of constraint theory into construction project management, with the primary goal of mitigating project completion delays. Additionally, it employs fuzzy analysis to determine the relative significance of fundamental constraints within projects by assigning them appropriate weights. The research problem primarily revolves around two key issues. Firstly, the persistent utilization of outdated methodologies and a heavy reliance on workforce experience without embracing modern computerized technologies. Secondly, the recurring problem of project delivery delays. Construction projects typically encompass five fundamental constraint types: cost restrictions, tim

... Show More
Preview PDF
Crossref
Publication Date
Tue Oct 01 2019
Journal Name
2019 12th International Conference On Developments In Esystems Engineering (dese)
Structural Rehabilitation on Continuous Post-Tensioned Prestressed Concrete Box-Girder Bridge Exposed to Explosion: A Case Study
...Show More Authors

View Publication
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Tue Jun 30 2020
Journal Name
Journal Of Economics And Administrative Sciences
The role of Techno strategy of Information management in achieving administrative innovation : A case study in the college of Management and Economics / University of Kirkuk
...Show More Authors

The present research aims to identify and define the basic dimensions of the information management strategy and the administrative creativity in the Faculty of Management and Economics / the University of Kirkuk, as well as the role played by the dimensions of the information technology management strategy in achieving the administrative innovation in the college and the research problem was formulated in several questions. The research problem was formulated in several questions centered on the correlation between the research variables, and the research was based on a major hypothesis and five sub-hypotheses emerged from which it was subjected to several tests to ensure its validity. The researcher used the descriptive-analyti

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Thu Apr 01 2021
Journal Name
Iop Conference Series: Earth And Environmental Science
Reality analysis of the state of spatial distribution of green areas using geographic information systems (GIS) – The holy city of Najaf as a case study
...Show More Authors
Abstract<p>Green areas are an essential component of city planning, as they serve as an outlet for them to spend their free time, in addition to the environmental role that these green areas play in improving the city’s climate by purifying the air and beautifying the city. The study’s problem is summarized in identifying the appropriateness of the current spatial distribution of green areas in the city of Najaf with the current population densities and the pattern in which green areas are distributed using GIS and knowing the per capita share of those green areas in the city, the research assumes that the inconsistency of spaces between regions Green and residential neighbourhoods need to c</p> ... Show More
View Publication
Scopus (5)
Crossref (3)
Scopus Crossref
Publication Date
Tue Apr 30 2024
Journal Name
Iraqi Geological Journal
Wellbore Instability Analysis to Determine the Safe Mud Weight Window for Deep Well, Halfaya Oilfield
...Show More Authors

Wellbore instability is one of the most common issues encountered during drilling operations. This problem becomes enormous when drilling deep wells that are passing through many different formations. The purpose of this study is to evaluate wellbore failure criteria by constructing a one-dimensional mechanical earth model (1D-MEM) that will help to predict a safe mud-weight window for deep wells. An integrated log measurement has been used to compute MEM components for nine formations along the studied well. Repeated formation pressure and laboratory core testing are used to validate the calculated results. The prediction of mud weight along the nine studied formations shows that for Ahmadi, Nahr Umr, Shuaiba, and Zubair formations

... Show More
View Publication
Scopus Crossref
Publication Date
Fri May 01 2015
Journal Name
Journal Of The Faculty Of Medicine
Gentamycin injection in disc space during lumbar discectomy (aiming to prevent post - operative discitis)
...Show More Authors

AW Ali T, Journal of the Faculty of Medicine, 2015 - Cited by 3

View Publication
Publication Date
Thu Jun 04 2020
Journal Name
Journal Of Petroleum Exploration And Production Technology
Re-assessment and tune-up gas condensate reservoir potential in Northern Iraq using material balance and reservoir simulation result techniques
...Show More Authors
Abstract<p>The main parameter that drives oil industry contract investment and set up economic feasibility study for approving field development plan is hydrocarbon reservoir potential. So a qualified experience should be deeply afforded to correctly evaluate hydrocarbons reserve by applying different techniques at each phase of field management, through collecting and using valid and representative data sources, starting from exploration phase and tune-up by development phase. Commonly, volumetric calculation is the main technique for estimate reservoir potential using available information at exploration stage which is quite few data; in most cases, this technique estimate big figure of reserve. In this study</p> ... Show More
View Publication
Scopus (1)
Scopus Clarivate Crossref
Publication Date
Sat Sep 01 2012
Journal Name
Journal Of Economics And Administrative Sciences
Effect of strategic thinking in human resource management strategies “Analytical field study of the views of a sample of managers in the Iraqi Ministry of Health”
...Show More Authors

The researcher attempts to diagnose the level of the effect  of strategic thinking skills (intuition, meditation, creativity) of the managers in the Ministry of Health in Iraq and some of its institutions in the formulation of human resources management: (selection, training, incentivence , performance appraisal (Recognizing the importance of the subjects studied, and because of the importance of the expected results of th

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Feb 01 2024
Journal Name
Journal Of Engineering
The Economic Evaluation of Various Production Scenarios for Zubair Reservoir in the Kifl Field
...Show More Authors

This work evaluates the economic feasibility of various production scenarios for the Zubair reservoir in the Kifl oil field using cash flow and net present value (NPV) calculations. The Kifl field is an exploratory field that has not yet been developed or assessed economically. The first well was drilled in 1960, and three other wells were later drilled to assess the oil accumulation, so in this research, Different production scenarios were evaluated economically. These scenarios were proposed based on the reservoir model of the Zubair formation in the field. The research methodology used QUE$TOR software to estimate capital expenditures (CapEx) and operating expenditures (OpEx) based on field-level data, production prof

... Show More
View Publication Preview PDF
Crossref