The hydrodynamics of a co-current down flow bubble column has been investigated with air – water system. A Perspex bubble column of 5cm in diameter and 1.5m height is used as a test contactor using nozzles of 7, 8 and 9 mm diameter for air-water distributing. The column is provided with three electro-resistivity needle probes for bubble detection.
Experimental work is carried out with air flow rates from 0.09 to 0.45 m3/hr and liquid flow rates from 0.65 to 1.1m3/hr in order to study the effects of superficial gas velocity, nozzle diameter and liquid flow rate on the characteristics of hydrodynamic interactions viz. gas hold up, bubble diameter and bubble velocity by using two technical methods, direct height measurements for air-water mixture in the column and resistivity probe techniques.
Gas hold up is found to be progressively increased with increasing superficial gas velocity and with decreasing liquid flow rate. Lower gas hold up is obtained with smaller nozzle diameter. However, gas hold up in two-phase zone is considerably higher than the corresponding value in mixing zone.
The mean bubble velocity is increased with increasing superficial gas velocity, liquid flow rate and nozzle diameter for both mixing and two phase zones. Experimental data are found to be fairly fitted with the Drift Flux model of Zuber and Findly.
The bubble diameter is considerably increased with increasing superficial gas velocity and with decreasing liquid flow rate, whereas it is slightly influenced by nozzle diameter. However, the bubbles in two-phase zone are relatively bigger than those observed in mixing zone. Finally, mathematical correlations have been developed from the experimental data to describe the gas hold up and bubble velocity in the uniform two-phase zone.
After restoration of Iraqi marshes during 2003, three locations were chosen, one in each main marsh (Um Al-Naaj site in Al-Hwaizeh marsh; Al-Nagarah site in Al-Hammar marsh and Al-Baghdadia site in Al-Chebaysh marsh) to determine the concentrations of nutrients (Nitrate, Nitrite, Phosphate and Silicate) in water seasonally for the period winter, spring, summer, and autumn at 2007. Five water replicates were collected from each site, seasonally. In the Lab., the samples were analyzed by colorimetric methods; the results showed that Um-Al-Naaj site has the highest nutrients level, while Al-Nagarah site has the lowest level. The statistical program t-test was applied at the significant levels (P-value < 0.01) and (P-value < 0.05) to know
... Show MoreWe describe the synthesis and characterization of a novel 2D-MnOx material using a combination of HR-TEM, XAS, XRD, and reactivity measurements. The ease with which the 2D material can be made and the conditions under which it can be made implies that water oxidation catalysts previously described as “birnessite-like” (3D) may be better thought of as 2D materials with very limited layer stacking. The distinction between the materials as being “birnessite-like” and “2D” is important because it impacts on our understanding of the function of these materials in the environment and as catalysts. The 2D-MnOx material is noted to be a substantially stronger chemical oxidant than previously noted for other birnessite-like manganese oxi
... Show MoreMonitoring the river’s water quality is important to predict the environmental risk. The Tigris River is Baghdad’s main source for living organisms, drinking water, and agro-industrial purposes. Three selected sites were carried out using different water quality parameters from July 2017 to April 2018 in the Tigris River in Baghdad. Fourteen water quality parameters: water temperatures, turbidity, electrical conductivity, pH, calcium, magnesium, chloride, sulfate, phosphate, dissolved oxygen (DO), alkalinity, total hardness, total dissolved substances TDS, and biological oxygen demand (BOD5). According to CCME WQI analysis, the water quality of Tigris River water was Fair for aqua
A series of batch demulsification runs were carried out to evaluate the final emulsified water content of emulsion samples after the exposure to microwave. An experimental study was conducted to evaluate the effects of a set of operating variables on the demulsification performance. Several microwave irradiation demulsification runs were carried out at different irradiation powers (700, 800, and 900 watt), using water-in-oil emulsion samples containing different water contents (20-80%, 30-70%, and 50-50%) and salt contents (10000, 20000, and 30000 ppm). It was found that the best separation efficiency was obtained at 900watt, 50% water content and 160 s of irradiation time. Experimental results showed that microwave radiation method can
... Show MoreThis paper aims to evaluate large-scale water treatment plants’ performance and demonstrate that it can produce high-level effluent water. Raw water and treated water parameters of a large monitoring databank from 2016 to 2019, from eight water treatment plants located at different parts in Baghdad city, were analyzed using nonparametric and multivariate statistical tools such as principal component analysis (PCA) and hierarchical cluster analysis (HCA). The plants are Al-Karkh, Sharq-Dijlah, Al-Wathba, Al-Qadisiya Al-Karama, Al-Dora, Al-Rasheed, Al-Wehda. PCA extracted six factors as the most significant water quality parameters that can be used to evaluate the variation in drinkin
This study aims to evaluate drinking water quality at the Al Wahda plant (WTP) in Baghdad city. A conventional water treatment plant with an average flow rate of 72.82 MLD. Water samples were taken from the influent and effluent of the treatment plant and analyzed for some physicochemical and biological parameters during the period from June to November 2020. The results of the evaluation indicate that treated water has almost the same characteristics as raw water; in other terms, the plant units do not remove pollutants as efficiently as intended. Based on this, the station appears to be nothing more than a series of water passage units. However, apart from Total dissolved solids, the mean values of all parameters in th
... Show MoreThis study aims to evaluate drinking water quality at the Al Wahda plant (WTP) in Baghdad city. A conventional water treatment plant with an average flow rate of 72.82 MLD. Water samples were taken from the influent and effluent of the treatment plant and analyzed for some physicochemical and biological parameters during the period from June to November 2020. The results of the evaluation indicate that treated water has almost the same characteristics as raw water; in other terms, the plant units do not remove pollutants as efficiently as intended. Based on this, the station appears to be nothing more than a series of water passage units. However, apart from Total dissolved solids, the mean values of all parameters in the study were
... Show MoreThe object of the presented study was to monitor the changes that had happened in the main features (water, vegetation, and soil) of Al-Hammar Marsh region. To fulfill this goal, different satellite images had been used in different times, MSS 1973, TM 1990, ETM+ 2000, 2002, and MODIS 2009, 2010. A new technique of the unsupervised classification called (Color Extracting Technique) was used to classify the satellite images. MATLAP programming used the technique and separated Al-Hammar Marsh from other water features (rivers, irrigated lands, etc.) when calculated the changes in the water content of the study region. ArcGIS 9.3 (arcMAP, arcToolbox) were used to achieve this work and calculate area of each class.
Clean water supply is one of the major factors contributing significantly to society’s socio-economic transformation by improving living standards, health, and increasing productivity. It is imperative to plan and construct appropriate water supply systems in modern society, which supply various segments of society with safe drinking water according to their requirements to ensure adequate and quality water supply. In the current study, here was an attempt to develop a model for geographic information systems to manage the assets of the water distribution networks in the Karrada region and to evaluate the network geometrically, and from the results of the engineering analysis of the