Rock type identification is very important task in Reservoir characterization in order to constrict robust reservoir models. There are several approaches have been introduced to define the rock type in reservoirs and each approach should relate the geological and petrophysical properties, such that each rock type is proportional to a unique hydraulic flow unit. A hydraulic flow unit is a reservoir zone that is laterally and vertically has similar flow and bedding characteristics. According to effect of rock type in reservoir performance, many empirical and statistical approaches introduced. In this paper Cluster Analysis technique is used to identify the rock groups in tertiary reservoir for Khabaz oil field by analyses variation of petrophysical properties data that predicted by analysis of well log measurements. In tertiary reservoir four groups identified by cluster analysis technique, were each group was internally similar in petrophysical properties and different from others groups.
Objective: This study was conducted to identify the association of HLA-DRB1/DQB1 genes with the susceptibility or resistance to type 1 diabetes mellitus (T1D) among patients between the ages of five and eighteen.
Subjects and Methods: The study included 200 Sudanese participants, ages ranging from 5 to 18. One hundred participants were healthy non-diabetic as the control group and 100 with T1D as the case group. The investigation was carried out in Khartoum state. The selection of patients with T1D was from diabetic centers and hospitals. The allele-specific-refractory mutation system-polymerase chain reaction (ARMS-PCR) techniq
... Show MoreMaximizing the net present value (NPV) of oil field development is heavily dependent on optimizing well placement. The traditional approach entails the use of expert intuition to design well configurations and locations, followed by economic analysis and reservoir simulation to determine the most effective plan. However, this approach often proves inadequate due to the complexity and nonlinearity of reservoirs. In recent years, computational techniques have been developed to optimize well placement by defining decision variables (such as well coordinates), objective functions (such as NPV or cumulative oil production), and constraints. This paper presents a study on the use of genetic algorithms for well placement optimization, a ty
... Show More<p>Photovoltaic (PV) systems are becoming increasingly popular; however, arc faults on the direct current (DC) side are becoming more widespread as a result of the effects of aging as well as the trend toward higher DC voltage levels, posing severe risk to human safety and system stability. The parallel arc faults present higher level of current as compared with the series arc faults, making it more difficult to spot the series arc. In this paper and for the aim of condition monitoring, the features of a DC series arc fault are analyzed by analysing the arc features, performing model’s simulation in PSCAD, and carrying out experimental studies. Various arc models are simulated and investigated; for low current arcs, the heur
... Show MoreThe manual classification of oranges according to their ripeness or flavor takes a long time; furthermore, the classification of ripeness or sweetness by the intensity of the fruit’s color is not uniform between fruit varieties. Sweetness and color are important factors in evaluating the fruits, the fruit’s color may affect the perception of its sweetness. This article aims to study the possibility of predicting the sweetness of orange fruits based on artificial intelligence technology by studying the relationship between the RGB values of orange fruits and the sweetness of those fruits by using the Orange data mining tool. The experiment has applied machine learning algorithms to an orange fruit image dataset and performed a co
... Show MoreAccurate pore and fracture pressure detection is a major step in successful drilling operations design. The overestimation of these parameters absolutely leads to serious problems throughout and after well drilling. This study is concerned with the characterization and analysis of the most significant diagenetic processes that degrade or improve the reservoir characteristics of the Mauddud Formation in the Badra oil field. The primary goal of this research is to estimate the pore pressure and fracture pressure using well logging data by Techlog 2015 software in order to assess the impact on the estimation of the mud weight window (MWW). The estimated values of formation pressures are then analyzed according to different diagenetic p
... Show MoreThe research aims to determine the strength of the relationship between time management and work pressure and administrative leadership, where he was taken a sample of (47) of the administrative leadership at the Higher Institute of security and administrative development in the Ministry of Interior was used questionnaire as a key tool in collecting data and information and analyzed the answers to the sample surveyed by using Statistical program (spss) in the arithmetic mean of the calculation and test (t) and the correlation coefficient, the research found the most important results: the existence of significant moral positive relationship between both time management and work pressure and administrative leadership, the leadership of th
... Show MoreThe research discusses the most important goals and means of IGAD in making peace in Sudan and then regional peace.
This study examines the causes of time delays and cost overruns in a selection of thirty post-disaster reconstruction projects in Iraq. Although delay factors have been studied in many countries and contexts, little data exists from countries under the conditions characterizing Iraq during the last 10-15 years. A case study approach was used, with thirty construction projects of different types and sizes selected from the Baghdad region. Project data was gathered from a survey which was used to build statistical relationships between time and cost delay ratios and delay factors in post disaster projects. The most important delay factors identified were contractor failure, redesigning of designs/plans and change orders, security is
... Show More