To promote sustainable steel-concrete composite structures, it is essential to develop special shear connectors that facilitate accelerated construction and deconstruction. A lockbolt demountable shear connector (LBDSC) was recently proposed. While the LBDSC has been evaluated using horizontal and vertical (standard) push-out tests, it is essential to further assess the disassembly mechanism and the positive flexural performance of prefabricated demountable composite beams (PDCBs) under both serviceability and ultimate limit states. Two full-scale test specimens of PDCBs with LBDSC were designed with partial shear connections and assessed using a three or four-point load beam setup under both cyclic and static monotonic loading conditions. The experimental results indicate that the failure modes of the PDCBs include longitudinal cracking in the grout between concrete slabs along the composite beam. Additionally, the demountable composite beams exhibited typical ductile flexural failure. The disassembly and reassembly of the PDCB were evaluated using a cyclic loading setup, and the results indicated that the structural performance of the PDCB was not compromised. The experimental results for load-carrying capacity and elastic stiffness of the PDCB were compared to the corresponding values from composite beam theory and the provisions in Eurocode 4. The agreement between the tested and calculated results validates the applicability of the Eurocode 4 equations to demountable composite beams utilizing LBDSCs.
The research aims to identify the risks faced by projects and work on the administration, such as those risks by using professional Project Management System (Project Management Professional) by identifying those risks and their impact on the objectives of the project, if they occur and to provide appropriate responses to Ha.autam search application on the draft Law Faculty port by the General Mansour Construction Contracting company has been using a method personal interview with the heads of departments and project managers in the Al-Mansour and tools descriptive and quantitative analysis as was used (likelihood and impact of risk analysis, Ai_kaoa scheme Sbb- effect, analysis of probability and impact, risk matrix (probability
... Show MoreEach project management system aims to complete the project within its identified objectives: budget, time, and quality. It is achieving the project within the defined deadline that required careful scheduling, that be attained early. Due to the nature of unique repetitive construction projects, time contingency and project uncertainty are necessary for accurate scheduling. It should be integrated and flexible to accommodate the changes without adversely affecting the construction project’s total completion time. Repetitive planning and scheduling methods are more effective and essential. However, they need continuous development because of the evolution of execution methods, essent
The construction industry plays a crucial role in the countries' economy, especially in the developed country. This point encourages the concerned institution to use new techniques and integrate many techniques and methods to maximize the benefits. The main objective of this research is to evaluate the use of risk management, value management, and building information modeling in the Iraqi construction industry. The evaluation process aims at two objectives. The direct objective was to evaluate the knowledge in risk management (RM), value management (VM), and building information modeling (BIM). The indirect objective was to support the participants with information related to the main items mentioned. The questionnaire
... Show MoreIn Iraq, more than 1031 school projects have been halted due to disputes and claims resulting from financial, contractual, or other issues. This research aims to identify, prioritize, and allocate the most critical risk factors that threaten these projects’ success for the duration (2017-2022). Based on a multi-step methodology developed through systematic literature reviews, realistic case studies, and semi-structured interviews, 47 risk factors were identified. Based on 153 verified responses, the survey reveals that the top-ranked risk factors are corruption and bribery, delaying the payments of the financial dues to the contractors or sub-contractors, absence of risk management strategy, multiple change orders due
... Show MoreIn this study, the effect of fire flame on the punching shear strength of steel fiber reinforced concrete flat plates was experimentally investigated using nine half-scale specimens with dimensions of 1500×1500 mm and a total thickness of 100 mm. The main investigated variables comprised the steel fiber volume fraction 0, 1, and 1.5% and the burning steady state temperature 500 and 600 °C. The specimens were divided into three groups, each group consists of three specimens. The specimens in the first group were tested with no fire effect to be the reference specimens, while the others of the second and third groups were tested after being exposed to fire-flame effect. The adopted characteristics of the fire test were; (one hour) b
... Show MoreBasketball is a popular game in many parts of the world and many developed countries are making continuous efforts to prepare and develop their emerging players on scientific and clear bases as the basis for reaching high levels The researchers used the descriptive approach in the method of correlative studies to suit the nature of the study The readymade software (IBM SPSS Statistics Version24) was used to perform statistical treatments The researchers concluded that there was a significant relationship between body size indicators (height and weight) with the fitness elements of the emerging basketball players The researchers recommended conducting a similar study to determine the type of relationship to the indicators of the physical str
... Show MoreThis study presents an investigation about the effect of fire flame on the punching shear strength of hybrid fiber reinforced concrete flat plates. The main considered parameters are the fiber type (steel or glass) and the burning steady-state temperatures (500 and 600°C). A total of 9 half-scale flat plate specimens of dimensions 1500mm×1500mm×100mm and 1.5% fiber volume fraction were cast and divided into 3 groups. Each group consisted of 3 specimens that were identical to those in the other groups. The specimens of the second and the third groups were subjected to fire flame influence for 1 hour and steady-state temperature of 500 and 600°C respectively. Regarding the cooling process, water sprinkling was applied directly aft
... Show MoreIn this paper, the probabilistic behavior of plain concrete beams subjected to flexure is studied using a continuous mesoscale model. The model is two-dimensional where aggregate and mortar are treated as separate constituents having their own characteristic properties. The aggregate is represented as ellipses and generated under prescribed grading curves. Ellipses are randomly placed so it requires probabilistic analysis for model using the Monte Carlo simulation with 20 realizations to represent geometry uncertainty. The nonlinear behavior is simulated with an isotropic damage model for the mortar, while the aggregate is assumed to be elastic. The isotropic damage model softening be
The main aim of this study is to assess the performance and residual strength of post-fire non-prismatic reinforced concrete beams (NPRC) with and without openings. To do this, nine beams were cast and divided into three major groupings. These groups were classified based on the degrees of heating exposure temperature chosen (ambient, 400, and 700°C), with each group containing three non-prismatic beams (solid, 8 trapezoidal openings, and 8 circular openings). Experimentally, given the same beam geometry, increasing burning temperature caused degradation in NPRC beams, which was reflected in increased mid-span deflection throughout the fire exposure period and also residual deflectio