There are many configurations of directional control valve. Directional control valve has complex construction, such as moving spool to control the direction of actuator and desired speed. Magneto-rheological (MR) fluid is one of controllable fluids. Utilizing the MR fluid properties, direct interface can be realized between magnetic field and fluid power without the need for moving parts like spool in directional control valves. This paper presents the design of multi configuration MR directional control valve. The construction and the principle of work of the valve are presented. The experiment was conducted to show the working principle of the valve functionally. The valve worked proportionally to control the direction and speed of hydraulic actuator. The result demonstrated the operation of MR directional valve in eight configurations. The MR directional valve can replace many types of the spool directional control valve for controlling hydraulic actuator.
This study identified intellectual and applied research in key variables (Strategic Control and Strategic Pitfalls) through internal dimensions then founded the (Federal Board of Supreme Audit) is the good area for analyzing the relationship and effect between variables by (125) questionnaire selected from (148) was distributed to the top and middle management as a seniors in controlling action. Appropriate methods, statistical tools, and programs were used to enhance the basic outputs, represented as a set of Conclusions and recommendations from the real control work with a specificity of potential Pitfalls in the effectiveness impact by Strategic Control in other dimensions which Studied.
Asthma and obesity are both a major public health problems affecting large numbers of individuals across the globe. Link between obesity and asthma is now considered as a recognized fact, and many epidemiological studies, found that overweight and obese people had a higher chance of developing asthma, with more severe symptoms. Assessment of the relationship between body mass index and asthma control. A cross-sectional study, that included 100 patients diagnosed with asthma, attending the respiratory disease consultatory unit at Baghdad teaching hospital. Body mass index was calculated by (BMI= weight in Kg/Height in m2), and Asthma control was assessed using asthma control test questionnaire forma. Statistical analysis done using, Test of
... Show MoreIn this paper, a computational method for solving optimal problem is presented, using indirect method (spectral methodtechnique) which is based on Boubaker polynomial. By this method the state and the adjoint variables are approximated by Boubaker polynomial with unknown coefficients, thus an optimal control problem is transformed to algebraic equations which can be solved easily, and then the numerical value of the performance index is obtained. Also the operational matrices of differentiation and integration have been deduced for the same polynomial to help solving the problems easier. A numerical example was given to show the applicability and efficiency of the method. Some characteristics of this polynomial which can be used for solvin
... Show MoreIn this paper the variable structure control theory is utilized to derive a discontinuous controller to the magnetic levitation system. The magnetic levitation system model is considered uncertain, which subjected to the uncertainty in system parameters, also it is open-loop unstable and strongly nonlinear. The proposed variable structure control to magnetic levitation system is proved, and the area of attraction is determined. Additionally, the chattering, which induced due to the discontinuity in control law, is attenuated by using a non-smooth approximate. With this approximation the resulted controller is a continuous variable structure controller with a determined steady state error according to the selected control
... Show MoreThere is no doubt that the project control function is very important for administration, so the project Management depends on to monitor and control the project. The project control integrated to the planning which is the base of the administration functions; planning, organizing, directing, and controlling. Without project control cannot be insure to fulfill the plan of the project by the budget and specified time. The project management apply many methods of control to achieve the goals of project which are cost, time, and required specifications. Earned Value Management one of control methods that used in the project by international companies.
Earned Value Method is used in the project o
... Show MoreCNC machines are widely used in production fields since they produce similar parts in a minimum time, at higher speed and with possibly minimum error. A control system is designed, implemented and tested to control the operation of a laboratory CNC milling machine having three axes that are moved by using a stepper motor attached to each axis. The control system includes two parts, hardware part and software part, the hardware part used a PC (works as controller) connected to the CNC machine through its parallel port by using designed interface circuit. The software part includes the algorithms needed to control the CNC. The sample needs to be machined is drawn by using one of the drawing software like AUTOCAD or 3D MAX and is saved in a we
... Show MoreThe goal of this study is to build an application that can be used in difficult cases and sudden circumstances during the pandemic and post-disaster state, which can be the development of digital risk management and mitigating the difficult impact of the epidemic through the improvement of IT and IoT that can be fine by finding initial solutions and make the world like a digital city that could be managed by the network. We provide this study to gain an overview of reasons for delayed and exceeded costs in a select of thirty Iraqi case projects by controlling the time and cost. The drivers of delay have been investigated in multiple countries/contexts. however, there is little country data available under the conditions that have ch
... Show MoreApical periodontitis (AP) is the most prevalent chronic inflammatory disease of the teeth. Bone resorption dynamics in symptomatic and asymptomatic AP are still unrecognized. This study examined different inflammatory markers within gingival crevicular fluid, including matrix metalloproteinases 8 (MMP8), tissue inhibitors of metalloproteinases 1 (TIMP1), receptor activator of nuclear factor κB (RANK), its ligand (RANKL), and osteoprotegerin (OPG), to be used in comparing symptomatic apical periodontitis (SAP) and asymptomatic apical periodontitis (AAP) versus healthy teeth. Subjects with SAP, AAP, and a control group were recruited and GCF samples were collected by Periopaper strips. Clinical and radiographical measures were used f
... Show MoreThis work involves separating and studying the aminoacylase-1 (ACY1) of amniotic fluid from healthy pregnant, mainly one peak with higher activity has been isolated by DEAE-Cellulose ion exchange from the proteinous supernatant produced by deposition of proteins using ammonium sulfate (65%) after dialysis. The purification folds reaching to 19 folds also gave one protein peak when injected into the gel filtration column, a high ACY1 purity was obtained, with 38 folds of purification. It was found that the molecular weight of the isolated ACY1 was up to 46698 Dalton when using gel chromatography technique.The effect of ACY1 isolate was studied on rats with oxidative stress caused by lead acetate(LA) at 40 mg / kg body weight and compare
... Show More