Sewage pumping stations are considered an important part of any sewerage system. Pumps failure in these stations means that the pumps are unable to work at the design requirement (flow capacity and head) and that may cause sewer overflow and flooding leading to sewer deterioration. In this paper, two main sewage pumping stations in Baghdad city were selected as case studies, Al- Habibia and Al-Ghazali located on Zublin trunk sewer 3000 mm and Baghdad trunk sewer 1200-2100 respectively. This study focused mainly on the operation of main sewage pumping stations and their effect, both directly and indirectly, on changing hydraulic properties, which leads to an increase in the deterioration of sewage pipes. The hydraulic analysis was conducted to investigate the effect of the operational performance of these stations on the deterioration of the trunk sewers. In general, the sewage pumps are in good condition based on the completed evaluation of these stations but, it was observed that Al-Habibia sewage pumping station was unable to discharge high sewage flow (d/D = 0.75). Backup flow occurred in the inlet sewer and caused overflow and flooding. The hydraulic analysis for the effluent sewer showed that the actual flowing velocities of the operating conditions examined were greater than the minimum self- cleaning velocity. Al-Ghazali sewage pumping station was able to receive the influent sewage for all the cases of flow (low, medium and high). While the effluent sewer (Baghdad trunk sewer) that was 70% filled with sediments, that reduced its capacity, does not work with the high discharges of the pumps. Therefore, resulting in sewage flows from this overloaded sewer onto the streets and harms the environment.
This research include building mathematical models for aggregating planning and shorting planning by using integer programming technique for planning master production scheduling in order to control on the operating production for manufacturing companies to achieve their objectives of increasing the efficiency of utilizing resources and reduce storage and improving customers service through deliver in the actual dates and reducing delays.
The estimation of quantity of liquid that is collected from gas/oil separation system is a very complex task because it requires the application of the flash calculations which needs to solve the cubic equation of state and to use some numerical techniques. These difficulties can be overcome by a computer model which requires a lot of experimental data, long time, and experience.
This paper adopts a new technique to simplify this problem. It suggests new correlations for optimum separator pressure for separation station of heavy oils. The correlations have been achieved for two- and three- stage separation systems.
The co
A study to find the optimum separators pressures of separation stations has been performed. Stage separation of oil and gas is accomplished with a series of separators operating at sequentially reduced pressures. Liquid is discharged from a higher-pressure separator into the lower-pressure separator. The set of working separator pressures that yields maximum recovery of liquid hydrocarbon from the well fluid is the optimum set of pressures, which is the target of this work.
A computer model is used to find the optimum separator pressures. The model employs the Peng-Robinson equation of state (Peng and Robinson 1976) for volatile oil. The application of t
The basic objective of the research is to study the quality of the water flow service in the Directorate of Karbala sewage and how to improve it after identifying the deviations of the processes and the final product and then providing the possible solutions in addressing the causes of the deviations and the associated quality gaps. A number of quality tools were used and applied to all data Stations with areas and activities related to the drainage of rainwater, as the research community determines the stations of lifting rainwater in the Directorate of the streams of Karbala holy, and the station was chosen Western station to apply the non-random sampling method intended after meeting a number of. It is one of the largest and m
... Show MoreThis study investigated the applicability of iron oxide (Fe2O3) nanoparticles for the removal of cadmium metal from sewage water by using batch scale experiments. The iron oxide nanoparticles of 27.7nm were synthesized using a biological method and characterized by Atomic Force Microscope (AFM). The Box-Wilson design was used to conduct experiments with three parameters such as pH (2-6), time of adsorption (6-120min) and adsorbent dosage (5-25mg/L). The best conditions occurred at pH: 5.5; contact time: 95.8 min; and iron oxide nanoparticle dosage: 20.77 mg/L for maximum cadmium removal of (96.9%).
Abstract
The mine object for this research is determine the nature of the relation and effect between Human resources management strategic to less the work stress , Human resources management strategic represent a set of procedures and practices to manage the human resources at the organization. the stress of work effect on the performance of the human resources , al rasheed bank select to applied the qustioneer on the 32 person the work on the sebaa branch , using the qustioneer as a tool to collect data that is design according some of the standards and make the validity and stability. to analyses this data by using spss for computation " percentage , mean , standard , deriation
... Show MoreThe main objective of this paper is present a novel method to choice a certain wind turbine for a specific site by using normalized power and capacity factor curves. The site matching is based on identifying the optimum turbine rotation speed parameters from turbine performance index (TPI) curve, which is obtained from the higher values of normalized power and capacity factor curves. Wind Turbine Performance Index a new ranking parameter, is defined to optimally match turbines to wind site. The relations (plots) of normalized power, capacity factor, and turbine performance index versus normalized rated wind speed are drawn for a known value of Weibull shape parameter of a site, thus a superior method is used for Weibull parameters estima
... Show More