AIM: To analyse our experiences in the management of traumatic retroperitoneal hematoma (RPH), highlighting the various challenges faced and to report on the outcome of these patients. METHODS: From May 2014 to May 2017, all patients with traumatic RPH who underwent surgical treatment were retrospectively analysed. The kind of injury, intraoperative findings, sites of hematoma, postoperative morbidity and the overall outcomes were recorded. RESULTS: Ninety-six patients; 53 with blunt trauma and 43 with penetrating injury, were included in this study. The centre-medial hematoma was observed in 24 (25%) patients, lateral hematoma in 46 (47.9%) patients, pelvic hematoma in 19 (19.8%) patients, and multiple zone hematomas in 7 (7.3%) patients. All cases were managed surgically. Exploration of the retroperitoneal space was done in 72 cases. Thirty-three patients died, and the overall death rate was 34.4%. CONCLUSION: Surgical exploration should be done in RPH caused by penetrating injury, but the need for urgent exploration in blunt injury is not so high, and it depends on the anatomical site of hematoma, concomitant organ injury and the hemodynamic status of patients.
Single-input Multiple-output Signals Third-order Active-R Filter for different Circuit Merit Factor Q Configuration is proposed. This paper discusses a new configuration to realize third-order low pass, band pass and high pass. The presented circuit uses Single-input Multiple-output signals, OP-AMP and passive components. This filter is useful for high frequency operation, monolithic IC implementation and it is easy to design .This circuit gives three filter functions low-pass, high-pass and band-pass. This filter circuit can be used for different merit factor (Q) with high pass band gain. This gives better stop-band attenuation and sharper cut-off at the edge of the pass-band. Thus the response shows wider pass-band. The Ideal value of thi
... Show MoreIn this paper, two of the local search algorithms are used (genetic algorithm and particle swarm optimization), in scheduling number of products (n jobs) on a single machine to minimize a multi-objective function which is denoted as (total completion time, total tardiness, total earliness and the total late work). A branch and bound (BAB) method is used for comparing the results for (n) jobs starting from (5-18). The results show that the two algorithms have found the optimal and near optimal solutions in an appropriate times.
Wireless sensor networks (WSNs) are emerging in various application like military, area monitoring, health monitoring, industry monitoring and many more. The challenges of the successful WSN application are the energy consumption problem. since the small, portable batteries integrated into the sensor chips cannot be re-charged easily from an economical point of view. This work focusses on prolonging the network lifetime of WSNs by reducing and balancing energy consumption during routing process from hop number point of view. In this paper, performance simulation was done between two types of protocols LEACH that uses single hop path and MODLEACH that uses multi hop path by using Intel Care i3 CPU (2.13GHz) laptop with MATLAB (R2014a). Th
... Show MoreThis study discusses risk management strategies caused by pandemic-related (Covid-19) suspensions in thirty-six engineering projects of different types and sizes selected from countries in the middle east and especially Iraq. The primary data collection method was a survey and questionnaire completed by selected project crew and laborers. Data were processed using Microsoft Excel to construct models to help decision-makers find solutions to the scheduling problems that may be expected to occur during a pandemic. A theoretical and practical concept for project risk management that addresses a range of global and local issues that affect schedule and cost is presented and results indicate that the most significant delays are due to a
... Show MoreThis study discusses risk management strategies caused by pandemic-related (Covid-19) suspensions in thirty-six engineering projects of different types and sizes selected from countries in the middle east and especially Iraq. The primary data collection method was a survey and questionnaire completed by selected project crew and laborers. Data were processed using Microsoft Excel to construct models to help decision-makers find solutions to the scheduling problems that may be expected to occur during a pandemic. A theoretical and practical concept for project risk management that addresses a range of global and local issues that affect schedule and cost is presented and results indicate that the most significant delays are due to a
... Show MoreAbstract
The project of balad's major sewerage system is one of the biggest projects who is still in progress in salahulddin province provincial - development plan that was approved in 2013 . This project works in two parts ; the 1st is installing the sewerage networks (both of heavy sewerage & rain sewerage) and the 2nd is installing the life – off units (for heavy sewerage & rain sewerage , as well) . the directorate of salahuiddin is aiming that at end of construction it will be able to provide services for four residential quarters , one of the main challenges that project's management experience is how to achieve thes
... Show MoreThe problem of the current research as the Iraqi Drilling Company suffers from the many challenges facing its work as a result of the current conditions in Iraq and the subsequent changes in the policies of the State Which left an impact on its activities and objectives, which created pressure on the importance of an organizational power capable of diagnosing the core competencies and development and maintain them to contribute to the raising and success in the performance of the company. The researchers adopted the method of analytical research and adopted the questionnaire as a main tool in the collection of research data and information . It was distributed to a community of (140) individuals from the low mana
... Show MoreClean water supply is one of the major factors contributing significantly to society’s socio-economic transformation by improving living standards, health, and increasing productivity. It is imperative to plan and construct appropriate water supply systems in modern society, which supply various segments of society with safe drinking water according to their requirements to ensure adequate and quality water supply. In the current study, here was an attempt to develop a model for geographic information systems to manage the assets of the water distribution networks in the Karrada region and to evaluate the network geometrically, and from the results of the engineering analysis of the