This work evaluates the economic feasibility of various production scenarios for the Zubair reservoir in the Kifl oil field using cash flow and net present value (NPV) calculations. The Kifl field is an exploratory field that has not yet been developed or assessed economically. The first well was drilled in 1960, and three other wells were later drilled to assess the oil accumulation, so in this research, Different production scenarios were evaluated economically. These scenarios were proposed based on the reservoir model of the Zubair formation in the field. The research methodology used QUE$TOR software to estimate capital expenditures (CapEx) and operating expenditures (OpEx) based on field-level data, production prof
... Show MoreThe regular job of a reservoir engineer is to put a development plan to increase hydrocarbon production as possible and within economic and technical considerations. The development strategy for the giant reservoir is a complex and challenging task through the decision-making analysis process. Due to the limited surface water treatment facility, the reservoir management team focuses on minimizing water cut as low as possible by check the flow of formation and injected water movement through the Mishrif reservoir. In this research, a representative sector was used to make the review of water injection configuration, which is considered an efficient tool to make study in a particular area of the entire field when compared with the ful
... Show MoreThe study dealt with measuring the impact of the availability of each of the content elements of the interaction, electronic services, and information on the evaluation of the users of the government website for its effectiveness in terms of the site’s functions and for measuring the site’s ability to present the organization’s tasks to customer groups.
Authority is concerned with measuring the confidence of customers in the content of the site, and in the organization as a whole. Validity is related to measuring the effectiveness of employing the site’s content to achieve the goal of its creation and in communicating with customers. Availability It is for measuring the ease of use of the site. The relevance, which means
... Show MoreThe growth curves of the children are the most commonly used tools to assess the general welfare of society. Particularity child being one of the pillars to develop society; through these tools, we can path a child's growth physiology. The Centile line is of the important tools to build these curves, which give an accurate interpretation of the information society, also respond with illustration variable age. To build standard growth curves for BMI, we use BMI as an index. LMSP method used for finding the Centile line which depends on four curves represents Median, Coefficient of Variation, Skews, and Kurtosis. These can be obtained by modeling four parameters as nonparametric Smoothing functions for the illustration variable. Ma
... Show MoreIn this research, we have added nano anatase TiO2 as a partial replacement of Portland cement by a weight percentage of (0.25 to 1%) for the development of properties for protection against bacteria. The control mix was made by using "the cement to sand" proportion about (1: 2.75) with the "water to cement" proportion of (0.5) to study the structure, porosity, water absorption, density, mechanical properties, as well as anti-bacterial behavior. Inspections have been done such as scanning electron microscopy (SEM), and atomic force microscope (AFM) for mortar. Experimental results showed that after the addition of Nano powders in cement mortar, the structural properties improved significantly with the development of hydration o
... Show MoreProject management are still depending on manual exchange of information based on paper documents. Where design drawings drafting by computer-aided design (CAD), but the data needed by project management software can not be extracted directly from CAD, and must be manually entered by the user. The process of calculation and collection of information from drawings and enter in the project management software needs effort and time with the possibility of errors in the transfer and enter of information. This research presents an integrated computer system for building projects where the extraction and import quantities, through the interpretation of AutoCAD drawing with MS Access database of unit costs and productivities for the pricing and
... Show MoreIn this study, a review of variety of processes that are used in the treatment produced water prior to reuse or to responsible disposal are presented with their environmental issues and economical benefits. Samples of produced water from five locations in Rumaila oilfield/in south of Iraq were taken and analyzed for their contents of brine, some heavy metals, total suspended solids and oil and grease. Moreover, two samples of water were treated using reverse osmosis technique which showed its ability to treat such contaminated water. The results showed that the environmental impact of produced water arises from its chemical composition; i.e., its salt content, its heavy metals, and hydrocarbon contents.
In present work an investigation for precise hole drilling via continuous wave (CW) CO2 laser at 150 W maximum output power and wavelength 10.6 μm was achieved with the assistance of computerized numerical controlled (CNC) machine and assist gases. The drilling process was done for thin sheets (0.1 – 0.3 mm) of two types of metals; stainless steel (sst) 321H, steel 33 (st). Changing light and process parameters such as laser power, exposure time and gas pressure was important for getting the optimum results. The obtained results were supported with computational results using the COMSOL 3.5a software code.
Porosity is important because it reflects the presence of oil reserves. Hence, the number of underground reserves and a direct influence on the essential petrophysical parameters, such as permeability and saturation, are related to connected pores. Also, the selection of perforation interval and recommended drilling additional infill wells. For the estimation two distinct methods are used to obtain the results: the first method is based on conventional equations that utilize porosity logs. In contrast, the second approach relies on statistical methods based on making matrices dependent on rock and fluid composition and solving the equations (matrices) instantaneously. In which records have entered as equations, and the matrix is sol
... Show More