This study examines the causes of time delays and cost overruns in a selection of thirty post-disaster reconstruction projects in Iraq. Although delay factors have been studied in many countries and contexts, little data exists from countries under the conditions characterizing Iraq during the last 10-15 years. A case study approach was used, with thirty construction projects of different types and sizes selected from the Baghdad region. Project data was gathered from a survey which was used to build statistical relationships between time and cost delay ratios and delay factors in post disaster projects. The most important delay factors identified were contractor failure, redesigning of designs/plans and change orders, security issues, selection of low-price bids, weather factors, and owner failures. Some of these are in line with findings from similar studies in other countries and regions, but some are unique to the Iraqi project sample, such as security issues and low-price bid selection. While many studies have examined factors causing delays and cost overruns, this study offers unique insights into factors that need to be considered when implementing projects for post disaster emergency reconstruction in areas impacted by wars and terrorism.
Background: The adenomatoid odontogenic tumor is a relatively rare benign epithelial odontogenic tumor. It contains both epithelial and mesenchymal components. Few cases presented as an extrafollicular lesion or involve the mandible or associated with other odontogenic lesions. This paper represents a rare case of an extrafollicular AOT. Case presentation: A 24-year-old female had a painless swelling on the right side of the lower jaw since one-month duration. Intraorally there was a well defined fluctuant-blue swelling in the right alveolar premolar region measuring 1×2 cm obliterating the right lower buccal vestibule. Grade II mobility in the vital 44 and 45 teeth were observed. Panoramic radiographs showed a well-defined pear shaped
... Show MoreIn this research, our aim is to study the optimal control problem (OCP) for triple nonlinear elliptic boundary value problem (TNLEBVP). The Mint-Browder theorem is used to prove the existence and uniqueness theorem of the solution of the state vector for fixed control vector. The existence theorem for the triple continuous classical optimal control vector (TCCOCV) related to the TNLEBVP is also proved. After studying the existence of a unique solution for the triple adjoint equations (TAEqs) related to the triple of the state equations, we derive The Fréchet derivative (FD) of the cost function using Hamiltonian function. Then the theorems of necessity conditions and the sufficient condition for optimality of
... Show MoreIn this paper, the class of semi
This paper focuses on developing a self-starting numerical approach that can be used for direct integration of higher-order initial value problems of Ordinary Differential Equations. The method is derived from power series approximation with the resulting equations discretized at the selected grid and off-grid points. The method is applied in a block-by-block approach as a numerical integrator of higher-order initial value problems. The basic properties of the block method are investigated to authenticate its performance and then implemented with some tested experiments to validate the accuracy and convergence of the method.
This research aims to know the essence of the correlative relationship between tactical thinking and solving mathematical problems. The researchers followed the descriptive research method to analyze relations, as all students from the mathematics department in the morning study were part of the research group. The research sample of (100) male and female students has been chosen based on the arbitrators' views. The tools for studying the sample of research composed of (12) items of the multiple-choice test in its final form to measure tactical thinking and require establish-ing a test of (6) test-type paragraphs to solve mathematical problems. The findings showed that sample students' tactical thinking and their capacity to overcome mathem
... Show MoreScheduling problems have been treated as single criterion problems until recently. Many of these problems are computationally hard to solve three as single criterion problems. However, there is a need to consider multiple criteria in a real life scheduling problem in general. In this paper, we study the problem of scheduling jobs on a single machine to minimize total tardiness subject to maximum earliness or tardiness for each job. And we give algorithm (ETST) to solve the first problem (p1) and algorithm (TEST) to solve the second problem (p2) to find an efficient solution.
In this paper, first we refom1Ulated the finite element model
(FEM) into a neural network structure using a simple two - dimensional problem. The structure of this neural network is described
, followed by its application to solving the forward and inverse problems. This model is then extended to the general case and the advantages and di sadvantages of this approach are descri bed along with an analysis of the sensi tivity of
... Show More