This study came for the reason that some project administrations still do not follow the appropriate scientific methods that enable them to perform their work in a manner that achieves the goals for which those projects arise, in addition to exceeding the planned times and costs, so this study aims to apply the methods of network diagrams in Planning, scheduling and monitoring the project of constructing an Alzeuot intersection bridge in the city of Ramadi, as the research sample, being one of the strategic projects that are being implemented in the city of Ramadi, as well as being one of the projects that faced during its implementation Several of problems, the project problem was studied according to scientific methods through the application of the most prominent methods of plans Network (Gantt Chart, CPM, PERT), in planning and scheduling project activities and using computer programs related to network planning methods, especially (MS Project) and (Win QSB) program in determining the nature of relationships and interdependence between activities and processing data for the project to obtain results and draw Project networks The study reached a set of results, the most important of which is when applying network planning methods. This led to a reduction in the project completion time. Reliance on the CPM method and at the same cost allocated under normal conditions to (803) days, but in the case of accelerating the total project, the completion period is (643) days, and when adopting the PERT method, the total period of completion according to the project data is (796) day with a probability ratio of (0.43).
The productivity of oil wells may be improved by determining the value of enhancing well productivity and the likely reasons or sources of formation damage after the well has been recognized as underperforming. Oil well productivity may be improved, but the economics of this gradual improvement may be compromised. It is important to analyze the influence of the skin effect on the recovery of the reserve.
The acid treatment evaluated for the well AD-12, primarily for the zone Mi4; using a license of Stimpro Stimulation Software to validate the experimental work to the field scale, this software is considered the most comprehensive instrument for planning and monitoring matrix acid treatments and utilizing actual data to prov
... Show MoreThe commercial job is one of the most important businesses in the cities as there is no city can exist without commercial markets to offer service to its inhabitants. This study aims to distribute the commercial function in Abu Tayara Street located in the municipality of Al-Dora by highlighting the size of such businesses in this street. It focuses on analyzing the change that has occurred due to the usages of the commercial land not only in the residential areas, but also in various aspects associated with the growth of the population in the city. Both expansion and development of the economic and social aspects in the area have increased the demand for commercial services. So, the research focuses on the aspects of functional speciali
... Show MoreTo finalize any construction investment project, it would be necessary to identify the most significant problems and obstacles that lead to project reluctance and stalling. Unexpected events and conflicts may have disrupted these strategies and impacted project development. Due to the high initial investment costs of construction projects, crises can have an immediate impact, resulting in significant financial losses. The 2014 financial crisis was one of the most prominent crises that Iraq faced, which prompted the researcher to identify and evaluate those obstacles through this research and questionnaires using Pareto scientific theory to exclude factors that do not contribute to project lag. It was discovered that 28 o
... Show MoreThis research takes up address the practical side by taking case studies for construction projects that include the various Iraqi governorates, as it includes conducting a field survey to identify the impact of parametric costs on construction projects and compare them with what was reached during the analysis and the extent of their validity and accuracy, as well as adopting the approach of personal interviews to know the reality of the state of construction projects. The results showed, after comparing field data and its measurement in construction projects for the sectors (public and private), the correlation between the expected and actual cost change was (97.8%), and this means that the data can be adopted in the re
... Show MoreTwitter data analysis is an emerging field of research that utilizes data collected from Twitter to address many issues such as disaster response, sentiment analysis, and demographic studies. The success of data analysis relies on collecting accurate and representative data of the studied group or phenomena to get the best results. Various twitter analysis applications rely on collecting the locations of the users sending the tweets, but this information is not always available. There are several attempts at estimating location based aspects of a tweet. However, there is a lack of attempts on investigating the data collection methods that are focused on location. In this paper, we investigate the two methods for obtaining location-based dat
... Show MoreSewer system plays an indispensable task in urban cities by protecting public health and the environment. The operation, maintenance, and rehabilitation of this network have to be in a sustainable and scientific manner. For this purpose, it is important to support operators, decision makers and municipalities with performance evaluation procedure that is based on operational factors. In this paper, serviceability and performance indicator (PI) principles are employed to propose methodology comprising two enhanced PI curves that can be used to evaluate the individual sewers depending on operational factors such as flowing velocity and wastewater level in the sewers. In order to test this methodology; a case study of al-Ru
... Show MoreSewer system plays an essential task in urban cities by protecting public health and the environment. The operation, maintenance, and rehabilitation of this network have to be sustainable and scientifically. For this purpose, it is crucial to support operators, decision makers and municipalities with performance evaluation procedure that is based on operational factors. In this paper, serviceability and performance indicator (PI) principles are employed to propose methodology comprising two enhanced PI curves that can be used to evaluate the individual sewers depending on operational factors such as flowing velocity and wastewater level in the sewers. To test this methodology; a case study of al-Rusafa in Baghdad city is
... Show More
The research aims to measure, assess and evaluate the efficiency of the directorates of Anbar Municipalities by using the Data Envelopment Analysis method (DEA). This is because the municipality sector is consider an important sector and has a direct contact with the citizen’s life. Provides essential services to citizens. The researcher used a case study method, and the sources of information collection based on data were monthly reports, the research population is represented by the Directorate of Anbar Municipalities, and the research sample consists of 7 municipalities which are different in terms of category and size of different types. The most important conclusion reached by the research i
... Show More