Preferred Language
Articles
/
dxb1m4cBVTCNdQwCHVhy
Solving Job-Shop Scheduling Problem Using Genetic Algorithm Approach
...Show More Authors

Publication Date
Sun Aug 30 2020
Journal Name
Journal Of Economics And Administrative Sciences
work alienation and its impact on Job Satisfaction Applied Research
...Show More Authors

The research aims to determine the role of functional alienation and its impact on Job Satisfaction in General Motors Company, that were selected to apply the field side being an important company in Iraq, the problem was research with difficulty in employees adapt and their sense of alienation in their work which is reflected negatively on the level of satisfaction with work in company searched. A questionnaire was adopted as the main tool for data collection research which included (31) items distributed on (50) employees in the company selected, on a randomly chosen and based on the statistical program ready by (SPSS). Sample of this study was the most important findings of the research are the weak management of the company i

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Jun 01 2018
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Project Planning & Scheduling: بحث تطبيقي لمشاريع / مديرية الابنية المدرسية /دائرة المشاريع /مشروعالوزارةرقم (1)
...Show More Authors

Construction project life-cycle processes must be managed in a more effective and predictable way to meet project stakeholder needs , However, there is increasing concern about whether know-how effectively improves  understanding of underlying theories of project management processes for construction organizations and their project managers  Project planning and scheduling are considered as key and challenging tools in controlling and monitoring project performance , but many worldwide construction projects appear to give insufficient attention to effective management and definition of  project  planning, including pre planning stages . Indeed, some planning issues indeed, some planning issues have been completely ove

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
Scheduling of Leaching Requirements to Prevent the Secondary Salinisation in the Root Zone
...Show More Authors

Leaching scheduling techniques are one of the suggested solutions for water scarcity problems .The aim of the study is to show the possibility of using leaching scheduling, when applying the irrigation scheduling program for a certain irrigation project, which was prepare by Water Resources Engineering –University of Baghdad with some modifications to generalized it and it make applicable to various climatic zone and different soil types.
The objectives of this research is to build a system that concerns the prediction of the leaching scheduling (depth and date of leaching water), illustrating the main problems (soil salinity, save the amount of leaching requirement, and to maintain crops growth).The other objective is to compare be

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Jun 30 2015
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Single Well Coning Problem and Applicable Solutions
...Show More Authors

One of the most important and common problems in petroleum engineering; reservoir, and production engineering is coning; either water or gas coning. Almost 75% of the drilled wells worldwide contains this problem, and in Iraq water coning problem is much wider than the gas coning problem thus in this paper we try to clarify most of the reasons causing water coning and some of applicable solutions to avoid it using the simulation program (CMG Builder) to build a single well model considering an Iraqi well in north of Iraq black oil field with a bottom water drive, Coning was decreased by 57% by dividing into sub-layers (8) layers rather than (4) layers, also it was decreased (Coning) by 45% when perforation numbers and positions was chang

... Show More
View Publication Preview PDF
Publication Date
Wed Jun 03 2020
Journal Name
Political Sciences Journal
The problem of political change in Algeria
...Show More Authors

The article aims to study the crisis of political change  from three Phases . The first focuses on the crises of political legitimacy and democratic postponement, as fundamental issues in analyzing the phenomenon of power struggle through the dialectic between the concept of historical legitimacy and institutional fragility from the beginning of statehood in 1962 to the stage of multi-partyism and the cessation of the electoral process in the 1990s. While the second focuses on the question of the monopoly of power in the post-terrorism and national reconciliation according to considerations  Political, social and security measures to prolong the life of the regime and avoid the demands of political change brought about

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Aug 18 2019
Journal Name
Political Sciences Journal
The succession of power's problem in Lebanon
...Show More Authors

Abstract Political power in Lebanon is a fundamental objective of any political organization, whether political party or political group. Thus, there is a conflict of power. There are two kinds of political conflict that are differentiated by the idea of legitimacy. The competition is in the political system when the agreement between the social forces is considered legitimate, and the conflict is on the political system when the agreement between these forces ceases to be legitimate and Are working to topple it and seek to establish an alternative system. Therefore, the succession of power in Lebanon is a result of the competition and political conflict, which is in turn a result of the large number of regional and international players

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Jul 07 2017
Journal Name
International Journal Of Science And Research (ijsr)
Automatic brain tumor segmentation from MRI Images using superpixels based split and Merge algorithm
...Show More Authors

RA Ali, LK Abood, Int J Sci Res, 2017 - Cited by 2

View Publication
Publication Date
Sat Dec 31 2022
Journal Name
International Journal Of Intelligent Engineering And Systems
Using Three-Dimensional Logistic Equations and Glowworm Swarm Optimization Algorithm to Generate S-Box
...Show More Authors

View Publication
Scopus (4)
Crossref (1)
Scopus Crossref
Publication Date
Thu Jul 01 2021
Journal Name
Journal Of Physics: Conference Series
Wireless Optimization Algorithm for Multi-floor AP deployment using binary particle swarm optimization (BPSO)
...Show More Authors
Abstract<p>Optimizing the Access Point (AP) deployment is of great importance in wireless applications owing the requirement to provide efficient and cost-effective communication. Highly targeted by many researchers and academic industries, Quality of Service (QOS) is an important primary parameter and objective in mind along with AP placement and overall publishing cost. This study proposes and investigates a multi-level optimization algorithm based on Binary Particle Swarm Optimization (BPSO). It aims to an optimal multi-floor AP placement with effective coverage that makes it more capable of supporting QOS and cost effectiveness. Five pairs (coverage, AP placement) of weights, signal threshol</p> ... Show More
View Publication
Scopus Crossref
Publication Date
Wed Feb 16 2022
Journal Name
Journal Of Economics And Administrative Sciences
Solving Resource Allocation Model by Using Dynamic Optimization Technique for Al-Raji Group Companies for Soft Drinks and Juices
...Show More Authors

In this paper, the problem of resource allocation at Al-Raji Company for soft drinks and juices was studied. The company produces several types of tasks to produce juices and soft drinks, which need machines to accomplish these tasks, as it has 6 machines that want to allocate to 4 different tasks to accomplish these tasks. The machines assigned to each task are subject to failure, as these machines are repaired to participate again in the production process. From past records of the company, the probability of failure machines at each task was calculated depending on company data information. Also, the time required for each machine to complete each task was recorded. The aim of this paper is to determine the minimum expected ti

... Show More
View Publication Preview PDF
Crossref