The regular job of a reservoir engineer is to put a development plan to increase hydrocarbon production as possible and within economic and technical considerations. The development strategy for the giant reservoir is a complex and challenging task through the decision-making analysis process. Due to the limited surface water treatment facility, the reservoir management team focuses on minimizing water cut as low as possible by check the flow of formation and injected water movement through the Mishrif reservoir. In this research, a representative sector was used to make the review of water injection configuration, which is considered an efficient tool to make study in a particular area of the entire field when compared with the full-field model on the basis of time-consuming and computational analysis. The sector model was neighboring by extra grid blocks and three pseudo wells as injector wells to realize the pressure on the sector boundary, which attained an acceptable history matching. The fluid model and physics model were introduced by using Pressure Volume Temperature data of well involved in the study area and two relative permeability curves. Fourteen wells were utilized in this work, four wells are injectors, and the rest are producer. The development scenarios were implemented by setting various targets of oil production and different water injection rates required for pressure maintenance operations. Optimization of water cut has been applied by adjustment of production and injection rates and shut off the high water cut intervals. The results obtained from this study showed that the inverted 9-spot has a good recovery which is illustrated in the case_2C, the production rate was (49,000 STB/D) with minimum water cut (27.5%) as compared with a five-spot pattern.
Emerge application was used in Hampsson-Russell programs and that uses a combination of multiple 3D or 2D seismic attributes to predict some reservoir parameter of interest. In this research used the seismic inversion technique was performed on post-stack three dimensions (3D) seismic data in Nasriya oilfield with five wells and then used this results in Emerge analysis (training and application) were used to estimate reservoir properties (effective porosity) with multiattribute analysis derive relations between them at well locations. The horizon time slice of reservoir units of (Yb1, Yb3 and Yc) of Yamama Formation was made for property (effective porosity) to confirm match results and enhancement trends within these
... Show MoreThe risk assessment for three pipelines belonging to the Basra Oil Company (X1, X2, X3), to develop an appropriate risk mitigation plan for each pipeline to address all high risks. Corrosion risks were assessed using a 5 * 5 matrix. Now, the risk assessment for X1 showed that the POF for internal corrosion is 5, which means that its risk is high due to salinity and the presence of CO, H2S and POF for external corrosion is 1 less than the corrosion, while for Flowline X2 the probability of internal corrosion is 4 and external is 4 because there is no Cathodic protection applied due to CO2, H2S and Flowline X3 have 8 leaks due to internal corrosion so the hazard rating was very high 5 and could be due to salinity, CO2, fluid flow rate
... Show MoreWater injection equipments such as pipelines, which are used in the second recovery of oil in the Al-Ahdeb wells, suffer from the corrosion in water during maintaining vacuum deoxygenated tower that used to decrease concentration of the dissolved oxygen gas in the water from 6.2-9.1 ppm to o.5 ppm. This study involved calculation the corrosion rates of the internal surfaces of the pipelines either during operation of the vacuum unit or when the tower out of operation. Finally, find the solution by one of the following suggestions. In the first suggestion removal of the dissolved O2 from water is achieved by increasing the dosage of the oxygen scavenger (sodium sulphite). The second suggestion involves re
... Show MoreWater injection equipments such as pipelines, which are used in the second recovery of oil in the Al-Ahdeb wells, suffer from the corrosion in water during maintaining vacuum deoxygenated tower that used to decrease concentration of the dissolved oxygen gas in the water from 6.2-9.1 ppm to o.5 ppm. This study involved calculation the corrosion rates of the internal surfaces of the
pipelines either during operation of the vacuum unit or when the tower out of operation. Finally, find the solution by one of the following suggestions. In the first suggestion removal of the dissolved O2 from water is achieved by increasing the dosage of the oxygen scavenger (sodium sulphite). The second suggestion involves removing the dissolved O2 from w
The density-velocity relation is an important tool used to predict one of these two parameters from the other. A new empirical density –velocity equation was derived in Kf-4 well at Kifl Oil Field, south of Iraq. The density was derived from Gardner equation and the results obtained were compared with the density log (ROHB) in Kl-4 well. The petrophysical analysis was used to predict the variations in lithology of Yamama Formation depending on the well logs data, such as density, gamma, and neutron logs. The physical analysis of rocks depended on the density, Vp, and Vs values to estimate the elastic parameters, i.e. acoustic impedance (AI) and Vp/Vs ratio, to predict the lithology and hydrocarbon i
... Show MoreEfficient and cost-effective drilling of directional wells necessitates the implementation of best drilling practices and advanced techniques to optimize drilling operations. Failure to adequately consider drilling risks can result in inefficient drilling operations and non-productive time (NPT). Although advanced drilling techniques may be expensive, they offer promising technical solutions for mitigating drilling risks. This paper aims to demonstrate the effectiveness of advanced drilling techniques in mitigating risks and improving drilling operations when compared to conventional drilling techniques. Specifically, the advanced drilling techniques employed in Buzurgan Oil Field, including vertical drilling with mud motor, managed pres
... Show MoreWater pollution is an issue that can be exacerbated by drought as increased concentrations of unwanted substances are a consequence of lower water levels. Polluted water that flows into natural marshlands leads to the deposition of pollutants in the interior of the marsh. Here we present evidence that the interior of the Central Marsh (CM) in southern Iraq suffers from higher levels of pollution than areas closer to the source of water entering the marsh (the Euphrates River). A 1.7m embankment that halts the flow of the Euphrates is only infrequently breached and so the CM is effectively the terminal destination of the waters (and their associated pollutants and agricultural waste) flowing from the West of Iraq.
A range of water
... Show MoreThe reservoir characterization of Lower Qamchuqa (Shu'aiba) Formation (Aptian) is studied at the well BH-86 of Bai- Hassan Oilfield in Kirkuk area, Northern Iraq. The lithological study (of 91 thin sections) revealed that the formation consists of shaly limestone, a thin bed of marl within the limestone, and dolomitic limestone. Four petrographic microfacies were noticed Lime mudstone microfacies, Dolomudstone microfacies, Lime wackestone microfacies, subdivided into benthonic foraminifera lime wackestone submicrofacies and bioclasts lime wackestone submicrofacies, and the last microfacies is the Lime packstone microfacies, which is subdivided into pelloidal lime packstone submicrofacies and Orbitolina lime packstone microfaci
... Show More