In petroleum reservoir engineering, history matching refers to the calibration process in which a reservoir simulation model is validated through matching simulation outputs with the measurement of observed data. A traditional history matching technique is performed manually by engineering in which the most uncertain observed parameters are changed until a satisfactory match is obtained between the generated model and historical information. This study focuses on step by step and trial and error history matching of the Mishrif reservoir to constrain the appropriate simulated model. Up to 1 January 2021, Buzurgan Oilfield, which has eighty-five producers and sixteen injectors and has been under production for 45 years when it started in 1976. Reservoir exhibits heterogeneity in porosity and permeability throughout the field, therefore it’s a big challenge to control all reservoir properties during matching process. The historical matching process includes matching field and wells oil and water production rates, water injection rates, water cut, and reservoir static pressure. Finally, the results show that the good matching between simulated model and observed data; oil and water production rates, water injection rates, water cut, and static reservoir pressure which allow for implementing perfect future production forecasting strategies.
A Geographic Information System (GIS) is a computerized database management system for accumulating, storage, retrieval, analysis, and display spatial data. In general, GIS contains two broad categories of information, geo-referenced spatial data and attribute data. Geo-referenced spatial data define objects that have an orientation and relationship in two or three-dimensional space, while attribute data is qualitative data that can be counted for recording and analysis. The main aim of this research is to reveal the role of GIS technology in the enhancement of bridge maintenance management system components such as the output results, and make it more interpretable through dynamic colour coding and more sophisticated vi
... Show MoreCarbonate matrix stimulation technology has progressed tremendously in the last decade through creative laboratory research and novel fluid advancements. Still, existing methods for optimizing the stimulation of wells in vast carbonate reservoirs are inadequate. Consequently, oil and gas wells are stimulated routinely to expand production and maximize recovery. Matrix acidizing is extensively used because of its low cost and ability to restore the original productivity of damaged wells and provide additional production capacity. The Ahdeb oil field lacks studies in matrix acidizing; therefore, this work provided new information on limestone acidizing in the Mishrif reservoir. Moreover, several reports have been issued on the difficulties en
... Show MoreAcquisition provisions in Islamic jurisprudence
The research aims to test the correlation relationships between wise leadership, and the business model, and to demonstrate its influence (wise leadership) on the business model. Therefore, two main hypotheses were put forward. The research was applied to a sample consisting of (87) managers and deputy managers, some of them are members on the board of directors of the researched company. The questionnaire was adopted as a basic tool for collecting data, in addition to personal interviews. A number of statistical methods were used to analyze the data and obtain results. The researcher showed a set of results, including: There is a significant correlation between wise leadership and business model. There is an influence of wise leadership on
... Show MoreThe regular job of a reservoir engineer is to put a development plan to increase hydrocarbon production as possible and within economic and technical considerations. The development strategy for the giant reservoir is a complex and challenging task through the decision-making analysis process. Due to the limited surface water treatment facility, the reservoir management team focuses on minimizing water cut as low as possible by check the flow of formation and injected water movement through the Mishrif reservoir. In this research, a representative sector was used to make the review of water injection configuration, which is considered an efficient tool to make study in a particular area of the entire field when compared with the ful
... Show More
Abstract
This research attempt to explain the essential aspects of one important model in management of Bank risks , that is (stress testing) , which increase the concentrate on it resulting the negative affects of Global financial crisis that it accuar in 2008 to study the application possibilities in iraqian banks to enhancing the safety and financial soundness Becuase the classical tools in Risk management don’t give clear image on Banks ability in facing risks, hence the Basel committee on Banking supervision focusing in agreement of Basel 2,3 on stress testing when it doing the internal capital adequacy assessment process (ICAAP) .
To achieving the reseach obje
... Show MoreThe dangers of (Israel's) integration with Arab countries in the middle east region will threaten the Arab security structure dimension, which the latter makes the Arab regional system vulnerable for distortion due to its nominal and symbolic value which is far from the Arab self and questioning with its effectiveness in comparing with the real capabilities to Arab countries in achieving the common targets. So, how to assess the different problems that began to hit the structure of the Arab regional system? and how to pledge an allegiance after putting forward what is known as the American Deal of the Century for the administration of former US President Donald Trump for making another step toward normalization with (Israel)?. The reveal
... Show MoreThe removal of cadmium ions from simulated groundwater by zeolite permeable reactive barrier was investigated. Batch tests have been performed to characterize the equilibrium sorption properties of the zeolite in cadmium-containing aqueous solutions. Many operating parameters such as contact time, initial pH of solution, initial concentration, resin dosage and agitation speed were investigated. The best values of these parameters that will achieved removal efficiency of cadmium (=99.5%) were 60 min, 6.5, 50 mg/L, 0.25 g/100 ml and 270 rpm respectively. A 1D explicit finite difference model has been developed to describe pollutant transport within a groundwater taking the pollutant sorption on the permeable reactive barrier (PRB), which i
... Show More