In petroleum reservoir engineering, history matching refers to the calibration process in which a reservoir simulation model is validated through matching simulation outputs with the measurement of observed data. A traditional history matching technique is performed manually by engineering in which the most uncertain observed parameters are changed until a satisfactory match is obtained between the generated model and historical information. This study focuses on step by step and trial and error history matching of the Mishrif reservoir to constrain the appropriate simulated model. Up to 1 January 2021, Buzurgan Oilfield, which has eighty-five producers and sixteen injectors and has been under production for 45 years when it started in 1976. Reservoir exhibits heterogeneity in porosity and permeability throughout the field, therefore it’s a big challenge to control all reservoir properties during matching process. The historical matching process includes matching field and wells oil and water production rates, water injection rates, water cut, and reservoir static pressure. Finally, the results show that the good matching between simulated model and observed data; oil and water production rates, water injection rates, water cut, and static reservoir pressure which allow for implementing perfect future production forecasting strategies.
A modified water injection technique has organized by this study to improve oil recovery of the Mishrif reservoirs using polymerized alkaline surfactant water (PAS-Water) injection. It is planned to modify the existing water injection technology, first to control and balance the hazardous troublemaker reservoir facies of fifty-micron pore sizes with over 500 millidarcies permeability, along with the non-troublemaker types of less than twenty micron pore sizes with 45 to 100 millidarcies permeability. Second to control Mishrif reservoirs rock-wettability. Special core analysis under reservoir conditions of 2250 psi and 90 °C has carried out on tens of standard core plugs with heterogeneous buildup, using the proposed renewal water f
... Show MoreIt is very difficult to obtain the value of a rock strength along the wellbore. The value of Rock strength utilizing to perform different analysis, for example, preventing failure of the wellbore, deciding a completion design and, control the production of sand. In this study, utilizing sonic log data from (Bu-50) and (BU-47) wells at Buzurgan oil field. Five formations have been studied (Mishrif, Sadia, Middle lower Kirkuk, Upper Kirkuk, and Jaddala) Firstly, calculated unconfined compressive strength (UCS) for each formation, using a sonic log method. Then, the derived confined compressive rock strengthens from (UCS) by entering the effect of bore and hydrostatic pressure for each formation. Evaluations th
... Show MoreABSTRACT:. The Lower Cretaceous Zubair formation is comprised of sandstones intercalated with shale sequences. The main challenges that were encountered while drilling into this formation included severe wellbore instability-related issues across the weaker formations overlaying the reservoir section (pay zone). These issues have a significant impact on well costs and timeline. In this paper, a comprehensive geomechanical study was carried out to understand the causes of the wellbore failure and to improve drilling design and drilling performance on further development wells in the field. Failure criteria known as Mogi-Coulomb was used to determine an operating mud weight window required for safe drilling. The accuracy of the geomechanical
... Show MoreABSTRACT In dam construction stages when an earth embankment has retained a reservoir with constant water surface elevation for a long time, seepage conditions within the embankment will be reach a steady state. If it is necessary to drain the reservoir quickly, the pore-water pressures in the embankment may remain relatively high while the stabling effect of the reservoir's weight along the upstream (U/S) side for the embankment has removed. This process is referring to as "Rapid Drawdown" and may be cause instability in the upstream (U/S) face of the embankment. Kongele dam is one of the proposed earth dams to be implement within the current plan in Iraq. The authors study pore water pressure and the effect of rapid drawdown for the dam d
... Show MoreMandali Dam is one of the small dams in Iraq; it is located on Haran Wadi, Gangir, just 3km north-east Mandali City. Mandali dam consists of four main parts, the dam body, the intake structure, the spillway, and the bottom outlet. The dam body is zoned earth filled with a central core. The main purposes of the dam are to maintain flow of Wadi Haran, supplying irrigation and drinking water to Mandali City, and recharging the groundwater. Over a period of seven years of operation, the dam lost its ability to store water due to accumulated sediments within its reservoir. The accumulated sediment is about 2.25million m3. The average annual rate of reduction during this period is about 0.321
... Show MoreMany problems were encountered during the drilling operations in Zubair oilfield. Stuckpipe, wellbore instability, breakouts and washouts, which increased the critical limits problems, were observed in many wells in this field, therefore an extra non-productive time added to the total drilling time, which will lead to an extra cost spent. A 1D Mechanical Earth Model (1D MEM) was built to suggest many solutions to such types of problems. An overpressured zone is noticed and an alternative mud weigh window is predicted depending on the results of the 1D MEM. Results of this study are diagnosed and wellbore instability problems are predicted in an efficient way using the 1D MEM. Suitable alternative solutions are presented
... Show More