Preferred Language
Articles
/
cxfuApABVTCNdQwCkYJ7
Fuzzy Stochastic Probability of The Solution of Single Stationary Non- Homogeneous Linear Fuzzy Random Differential Equations
...Show More Authors

Publication Date
Thu Apr 03 2025
Journal Name
Isa Transactions
Optimal hybrid type-3 fuzzy controller for horizontal axis wind turbines: Comparative study
...Show More Authors

The blade pitch angle (BPA) controller is key factor to improve the power generation of wind turbine (WT). Due to the aerodynamic structural behavior of the rotor blades, wind turbine system performance is influenced by pitch angle and environmental conditions such as wind speed, which fluctuate throughout the day. Therefore, to overcome the pitch angle control (PAC) problem, high wind speed conditions, and due to type-1 and type-2 fuzzy logic limitations for handling high levels of uncertainty, the newly proposed optimal hybrid type-3 fuzzy logic controller has been applied and compared since type-3 fuzzy controllers utilize three-dimensional membership functions, unlike type-2 and type-1 fuzzy logic controllers. In this paper six differen

... Show More
View Publication
Scopus (8)
Crossref (8)
Scopus Clarivate Crossref
Publication Date
Sat May 31 2025
Journal Name
International Review Of Automatic Control (ireaco)
Variable Frequency Drives Based Fuzzy Logic to Assess Harmonic in Power Distribution Systems
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Sun Apr 30 2023
Journal Name
Iraqi Journal Of Science
Numerical and Analytical Solutions of Space-Time Fractional Partial Differential Equations by Using a New Double Integral Transform Method
...Show More Authors

  This work discusses the beginning of fractional calculus and how the Sumudu and Elzaki transforms are applied to fractional derivatives. This approach combines a double Sumudu-Elzaki transform strategy to discover analytic solutions to space-time fractional partial differential equations in Mittag-Leffler functions subject to initial and boundary conditions. Where this method gets closer and closer to the correct answer, and the technique's efficacy is demonstrated using numerical examples performed with Matlab R2015a.

View Publication
Scopus (6)
Crossref (2)
Scopus Crossref
Publication Date
Thu Jun 26 2014
Journal Name
Engineering Optimization
A new modified differential evolution algorithm scheme-based linear frequency modulation radar signal de-noising
...Show More Authors

The main intention of this study was to investigate the development of a new optimization technique based on the differential evolution (DE) algorithm, for the purpose of linear frequency modulation radar signal de-noising. As the standard DE algorithm is a fixed length optimizer, it is not suitable for solving signal de-noising problems that call for variability. A modified crossover scheme called rand-length crossover was designed to fit the proposed variable-length DE, and the new DE algorithm is referred to as the random variable-length crossover differential evolution (rvlx-DE) algorithm. The measurement results demonstrate a highly efficient capability for target detection in terms of frequency response and peak forming that was isola

... Show More
View Publication
Scopus (7)
Crossref (6)
Scopus Clarivate Crossref
Publication Date
Thu Oct 01 2009
Journal Name
Jssdds
Topical 10% lactic acid solution in the treatment of pityriasis versicolor in comparison with topical 1% clotrimazol solution (single-blind, comparative and therapeutic study)
...Show More Authors

KE Sharquie, AA Noaimi, AM Oweid, JSSDDS, 2009 - Cited by 2

View Publication
Publication Date
Wed Mar 30 2022
Journal Name
Journal Of Economics And Administrative Sciences
Planning the Production of the Electrical Distribution Converter (400KV/11) Using Time Series Methods and Goal Programming in the Fuzzy Environment
...Show More Authors

This Paper aims to plan the production of the electrical distribution converter (400 KV/11) for one month at Diyala Public Company and with more than one goal for the decision-maker in a fuzzy environment. The fuzzy demand was forecasting using the fuzzy time series model. The fuzzy lead time for raw materials involved in the production of the electrical distribution converter (400 KV/11) was addressed using the fuzzy inference matrix through the application of the matrix in Matlab, and since the decision-maker has more than one goal, so a mathematical model of goal programming was create, which aims to achieve two goals, the first is to reduce the total production costs of the electrical distribution converter (400 KV/11) and th

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Aug 01 2018
Journal Name
Journal Of Economics And Administrative Sciences
Adoption of multi – model Assignment Fuzzy to find Optimizing for the use of internet line in the Ministry of Science and Technlogy
...Show More Authors

We have provided in this research model multi assignment  with  fuzzy function goal has been to build programming model is correct Integer Programming fogging  after removing the case from the objective function data and convert it to real data .Pascal triangular graded mean using Pascal way to the center of the triangular.

The data processing to get rid of the case fogging which is surrounded by using an Excel 2007 either model multi assignment  has been used program LNDO to reach the optimal solution, which represents less than what can be from time to accomplish a number of tasks by the number of employees on the specific amount of the Internet, also included a search on some of the

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Dec 01 2012
Journal Name
Journal Of Economics And Administrative Sciences
Scheduling Critical Activities of Stochastic Projects Management
...Show More Authors

In this paper, we consider the problem of stochastic project network when some or all activities are interrupted. An approach has been built to schedule the critical activities, by constructing some expressions based on the project lateness costs due to the interruption activities. Two simple example are presented to validate our approach.

Key words: Project Management, Project scheduling, Stochastic activity duration, Stochastic PERT.    

Introduction

   Recently, Projects planning and optimal timing, under uncertainty are extremely critical for many organizations, see [19]. Having an effective mathematical model wi

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Feb 01 2022
Journal Name
Baghdad Science Journal
Solving Whitham-Broer-Kaup-Like Equations Numerically by using Hybrid Differential Transform Method and Finite Differences Method
...Show More Authors

This paper aims to propose a hybrid approach of two powerful methods, namely the differential transform and finite difference methods, to obtain the solution of the coupled Whitham-Broer-Kaup-Like equations which arises in shallow-water wave theory. The capability of the method to such problems is verified by taking different parameters and initial conditions. The numerical simulations are depicted in 2D and 3D graphs. It is shown that the used approach returns accurate solutions for this type of problems in comparison with the analytic ones.

View Publication Preview PDF
Scopus (7)
Crossref (5)
Scopus Clarivate Crossref
Publication Date
Sun Sep 02 2018
Journal Name
Arab Journal Of Basic And Applied Sciences
Development of the Banach contraction method for the solution of nonlinear thin film flows of non-Newtonian fluids
...Show More Authors

View Publication
Crossref (3)
Crossref