This research is devoted to design and implement a Supervisory Control and Data Acquisition system (SCADA) for monitoring and controlling the corrosion of a carbon steel pipe buried in soil. A smart technique equipped with a microcontroller, a collection of sensors and a communication system was applied to monitor and control the operation of an ICCP process for a carbon steel pipe. The integration of the built hardware, LabVIEW graphical programming and PC interface produces an effective SCADA system for two types of control namely: a Proportional Integral Derivative (PID) that supports a closed loop, and a traditional open loop control. Through this work, under environmental temperature of 30°C, an evaluation and comparison were done for two types of controls tested at low soil moisture (48%) and high soil moisture (80 %) to study the value of current, anode voltage, pipe to soil potential (PSP) and consumed power. The results show an decrease of 59.1% in consumed power when the moisture changes from the low to high level. It was reached that the closed loop controller PID is the best solution in terms of efficiency, reliability, fast response and power consumption.
This study identified intellectual and applied research in key variables (Strategic Control and Strategic Pitfalls) through internal dimensions then founded the (Federal Board of Supreme Audit) is the good area for analyzing the relationship and effect between variables by (125) questionnaire selected from (148) was distributed to the top and middle management as a seniors in controlling action. Appropriate methods, statistical tools, and programs were used to enhance the basic outputs, represented as a set of Conclusions and recommendations from the real control work with a specificity of potential Pitfalls in the effectiveness impact by Strategic Control in other dimensions which Studied.
There is no doubt that the project control function is very important for administration, so the project Management depends on to monitor and control the project. The project control integrated to the planning which is the base of the administration functions; planning, organizing, directing, and controlling. Without project control cannot be insure to fulfill the plan of the project by the budget and specified time. The project management apply many methods of control to achieve the goals of project which are cost, time, and required specifications. Earned Value Management one of control methods that used in the project by international companies.
Earned Value Method is used in the project o
... Show MoreIn this research, we discussed and analyzed the relationship between oil prices and the U.S. dollar exchange rate in Iraq. The study adopted the descriptive analysis and econometrics analysis. The descriptive analysis refers to the rise (fall) in crude oil price lead to appreciate (depreciate) in the Iraqi dinar exchange rate, though the channel of the international reserves. The econometrics analysis is based on monthly data covered the period (December/2002 – December/2011), the unit root test, co-integration test, vector error correction model, and Granger causality test have been adopted in this research to check the existence and direction of this relationship. The results refer to the lon
... Show MoreThe Albian Carbonate-clastic succession in the present study is represented by the Mauddud and Nahr Umr formations were deposited during the Albian stage within the Wasia Group More than 200 thin sections of cores and cuttings in addition to well logs data for Nahr Umr and Mauddud formations from 4 boreholes within two oil fields (Ba-4, Ba-8, Ns-2 and Ns-4) were used to interpret the different associations facies as well as the facies architectures to describe the sedimentary framework of the basin and development the petrophysical properties. Seven major microfacies were diagnosed in the carbonate succession of the Mauddud Formation, while the Nar Umr Formation includes five lithofacies; their grain types characteristic and deposit
... Show MoreThis paper features the modeling and design of a pole placement and output Feedback control technique for the Active Vibration Control (AVC) of a smart flexible cantilever beam for a Single Input Single Output (SISO) case. Measurements and actuation actions done by using patches of piezoelectric layer, it is bonded to the master structure as sensor/actuator at a certain position of the cantilever beam.
The smart structure is modeled based on the concept of piezoelectric theory, Bernoulli -Euler beam theory, using Finite Element Method (FEM) and the state space techniques. The number of modes is reduced using the controllability and observability grammians retaining the first three
dominant vibratory modes, and for the reduced syste
Constructing a fine 3D geomodel for complex giant reservoir is a crucial task for hydrocarbon volume assessment and guiding for optimal development. The case under study is Mishrif reservoir of Halfaya oil field, which is an Iraqi giant carbonate reservoir. Mishrif mainly consists of limestone rocks which belong to Late Cenomanian age. The average gross thickness of formation is about 400m. In this paper, a high-resolution 3D geological model has been built using Petrel software that can be utilized as input for dynamic simulation. The model is constructed based on geological, geophysical, pertophysical and engineering data from about 60 available wells to characterize the structural, stratigraphic, and properties distribution along
... Show MoreConstructing a fine 3D geomodel for complex giant reservoir is a crucial task for hydrocarbon volume assessment and guiding for optimal development. The case under study is Mishrif reservoir of Halfaya oil field, which is an Iraqi giant carbonate reservoir. Mishrif mainly consists of limestone rocks which belong to Late Cenomanian age. The average gross thickness of formation is about 400m. In this paper, a high-resolution 3D geological model has been built using Petrel software that can be utilized as input for dynamic simulation. The model is constructed based on geological, geophysical, pertophysical and engineering data from about 60 available wells to characterize the structural, stratigraphic, and properties distri
... Show MoreMishrif Formation is the main reservoir in Amara Oil Field. It is divided into three units (MA, TZ1, and MB12). Geological model is important to build reservoir model that was built by Petrel -2009. FZI method was used to determine relationship between porosity and permeability for core data and permeability values for the uncored interval for Mishrif formation. A reservoir simulation model was adopted in this study using Eclipse 100. In this model, production history matching executed by production data for (AM1, AM4) wells since 2001 to 2015. Four different prediction cases have been suggested in the future performance of Mishrif reservoir for ten years extending from June 2015 to June 2025. The comparison has been mad
... Show More