Conventional concretes are nearly unbendable, and just 0.1 percent of strain potential makes them incredibly brittle and stiff. This absence of bendability is a significant cause of strain failure and has been a guiding force in the production of an elegant substance, bendable concrete, also known as engineered cement composites, abbreviated as ECC. This type of concrete is capable of displaying dramatically increased flexibility. ECC is reinforced with micromechanical polymer fibers. ECC usually uses a 2 percent volume of small, disconnected fibers. Thus, bendable concrete deforms but without breaking any further than conventional concrete. This research aims to involve this type of concrete, bendable concrete, that will give solutions for concrete deficiencies. Two types of Portland Limestone Cement were used, Karasta (CK) and Tasluja (CT). Four mixes were adopted, polypropylene fibers (PP) and polyvinyl alcohol solution (PVA) were conducted to prepare the mixes. The tests were carried out at the age of 28 days of water curing. Best results were presented for mixes containing pp fibers and PVA solution than those without fibers for drying shrinkage and creep tests
In this modern Internet era and the transition to IPv6, routing protocols must adjust to assist this transformation. RIPng, EIGRPv6 and OSPFv3 are the dominant IPv6 IGRP (Interior Gateway Routing Protocols). Selecting the best routing protocol among the available is a critical task, which depends upon the network requirement and performance parameters of different real time applications. The primary motivation of this paper is to estimate the performance of these protocols in real time applications. The evaluation is based on a number of criteria including: network convergence duration, Http Page Response Time, DB Query Response Time, IPv6 traffic dropped, video packet delay variation and video packet end to end de
... Show MoreThe covid-19 global pandemic has influenced the day-to-day lives of people across the world. One consequence of this has been significant distortion to the subjective speed at which people feel like time is passing. To date, temporal distortions during covid-19 have mainly been studied in Europe. The current study therefore sought to explore experiences of the passage of time in Iraq. An online questionnaire was used to explore the passage of time during the day, week and the 11 months since the first period of covid-19 restrictions were imposed in Iraq. The questionnaire also measured affective and demographic factors, and task-load. The results showed that distortions to the passage of time were widespread in Iraq. Participants co
... Show MoreIn this article, a continuous terminal sliding mode control algorithm is proposed for servo motor systems. A novel full-order terminal sliding mode surface is proposed based on the bilimit homogeneous property, such that the sliding motion is finite-time stable independent of the system’s initial condition. A new continuous terminal sliding mode control algorithm is proposed to guarantee that the system states reach the sliding surface in finitetime. Not only the robustness is guaranteed by the proposed controller but also the continuity makes the control algorithm more suitable for the servo mechanical systems. Finally, a numerical example is presented to depict the advantages of the proposed control algorithm. An application in the rota
... Show MoreIt is well- known that the distinguished scholastic journal is a crucial cornerstone, which contributes to the scientific integrity of a particular academic institution. The establishment of the Al-Kindy College of Medicine (AKCM), University of Baghdad, in 1998 urged the need to issue Al-Kindy College Medical Journal (KCMJ).
In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc
Design sampling plan was and still one of most importance subjects because it give lowest cost comparing with others, time live statistical distribution should be known to give best estimators for parameters of sampling plan and get best sampling plan.
Research dell with design sampling plan when live time distribution follow Logistic distribution with () as location and shape parameters, using these information can help us getting (number of groups, sample size) associated with reject or accept the Lot
Experimental results for simulated data shows the least number of groups and sample size needs to reject or accept the Lot with certain probability of
... Show More