Heat is one of the most energy forms emitted to atmosphere by industrial processes. Water is considered to be the best material to reduce heat energy since its available in nature in abundance and has the ability to absorb heat efficiently. Cooling towers are ideal alternatives to re-cool hot water instead of throwing it especially in places that lack natural water resources or when there are environmental precautions because water with high temperature would be harmful to the ecosystem when it recycled to natural resources such as rivers and lakes. Also, cooling towers considered economically feasible when using west water. This paper interests with hydraulic characteristics of a counter flow wet cooling tower which was investigated experimentally. The tower filled with splash packing with Zig-Zag pattern. Current study used treated waste water and focused fundamentally on the influence of air and water flow rates on hydraulic features of cooling tower for different access water temperatures. The dependency between pressure drop and the air and water flux was spotted. In this study, it found that within a certain ranges the pressure drop increases by 75% due to liquid flux and 70% due to air flux while pressure drop is not affected by changing temperature at all. Two empirical correlation had been founded for dry pressure drop (with R2=99.5%), and for wet pressure drop (with R2=98.13%).
In this work a study was made in centrifugal fan blower to investigate the effect of impeller blade design on sound pressure level (SPL). Shroud and unshroud impeller of nine blades are used. The sound generation from flow inside the test rig at different positions was displayed by using spectral analyzer. The experiments were carried out in anechoic chamber with small holes in its walls, under ambient condition about (25-27) C ° to avoid the effect of temperature on the sound pressure level. The results showed that (SPL) decreased with the increase of distance from the source about (3-4)dB when distance varied about (0.8-1.06)m, and the (SPL) decreased with the decrease of velocity about (8-12)dB when velocity varied between (13000-260
... Show MoreABSTRACT
Ticagrelor is an orally administered antiplatelet medicine, direct-acting P2Y12-receptor antagonist. Ticagrelor binds reversibly and noncompetitively to the P2Y12 receptor at a site distinct from that of the endogenous agonist adenosine diphosphate (ADP). Inhibition of platelet aggregation stimulated by ADP is a commonly used pharmacodynamic parameter for P2Y12-receptor antagonists.
Ticagrelor is a crystalline powder with an aqueous solubility of approximately 10?g/mL at room temperature.
... Show MoreThis study was done to determine the concentration of several heavy metals in the water of Al-Saddah agricultural drainage in Al-Saddah District in Babylon Province/Iraq. The concentrations of six heavy metals were measured (Pb, Cd, Cu, Hg, Fe, Zn). It was found that Pb concentration ranged from 0.06 mg/L at St.2 in autumn to 0.13 mg/L at St.2 in winter. Fe concentrations ranged from 0.04 mg/L at St.2 in autumn and winter to 0.41 at St.2 in Summer. Cd concentrations ranged from 0.008 mg/L at St.2 in summer to 0.05 mg/L at St.2 in winter. Cu concentrations ranged from 0.01 mg/L at St.1 in both autumn and winter to 0.63 mg/L at St.2 in winter. Hg concentrations was ranged from 0.002 mg/
A numerical study has been carried out to investigate heat transfer by natural convection and radiation under the effect of magnetohydrodynamic (MHD) for steady state axisymmetric twodimensional laminar flow in a vertical cylindrical channel filled with saturated porous media. Heat is generated uniformly along the center of the channel with its vertical surface remain with cooled constant wall temperature and insulated horizontal top and bottom surfaces. The governing equations which used are continuity, momentum and energy equations which are transformed to dimensionless equations. The finite difference approach is used to obtain all the computational results using the MATLAB-7 programming. The parameters affected on the system are Rayl
... Show MoreThe construction industry in Iraq suffers from many problems, perhaps the most important of which is the delay in time and the increase in costs. Therefore, it was necessary to try to adopt a new methodology that would help in overcoming these problems. It was suggested to combine building information modeling with the agile management approach because this technique and methodology is modern and helps in reducing time and cost and improving quality. This paper aims to know the status of using Building Information Modeling (BIM) and Agile Project management (APM) in Iraq and to shed light on the merging of this integration, explaining the benefits, difficulties, and workflow practices, finding the most influencing factors on the tim
... Show More