Chromatographic and spectrophotometric methods for the estimation of mebendazole in
pharmaceutical products were developed. The flow injection method was based on the oxidation of
mebendazole by a known excess of sodium hypochlorite at pH=9.5. The excess sodium hypochlorite is then
reacted with chloranilic acid (CAA) to bleach out its color. The absorbance of the excess CAA was recorded
at 530 nm. The method is fast, simple, selective, and sensitive. The chromatographic method was carried out
on a Varian C18 column. The mobile phase was a mixture of acetonitrile (ACN), methanol (MeOH), water
and triethylamine (TEA), (56% ACN, 20% MeOH, 23.5% H2O, 0.5% TEA, v/v), adjusted to pH = 3.0 with
1.0 M hydrochloric acid. Naphazoline nitrate was used as an internal standard. The absorption of mebendazole
was measured using a variable wavelength UV detector at 290 nm. Linearity was obtained in the concentration
range of 1-60 and 0.10-3.0 mg/L for the HPLC and FIA, respectively. The methods were applied successfully
for the assay of mebendazole in pharmaceutical products and no interferences were observed from the common
excipients usually used. The proposed methods were validated for their accuracy and precision.
Asmari is the main productive reservoir in Abu Ghirab oilfield in the south-east part of Iraq. It has history production extends from 1976 up to now with several close periods. Recently, the reservoir suffers some problems in production, which are abstracted as water production rising with oil production declining in most wells. The water problem type of the field and wells is identified by using Chan's diagnostic plots (water oil ratio (WOR) and derivative water oil ratio (WOR') against time). The analytical results show that water problem is caused by the channeling due to high permeability zones, high water saturation zones, and faults or fracturing. The numerical approach is also used to study the water movement insi
... Show MoreA linear and nonlinear theoretical and experimental aeroelastic investigation of a wing-flap-tab typical section model undergoing two-dimensional incompressible airflow is described. The linear flutter velocity (LFV) and frequency are predicted using linear analysis. Then a freeplay structural nonlinearity is considered in the tab. The structural equations of motion have been coupled with Theodorsen aerodynamic theory to produce the theoretical aeroelastic model which is analyzed by a state space method to predict the LFV and flutter frequency. Linear piecewise function has been used to introduce the tab spring stiffness in the freeplay state. The ground vibration test is used to measure the model structural dynamic characteristics. Then th
... Show MoreCarbon nanotubes were prepared by an arc-discharge method,
under different values of pressure of oxygen gas. The structure of
multi-walled carbon nanotubes powders has been characterized by
low-angle X-ray diffraction .The morphology of carbon nanotube
powder was examined by transmission electron microscope. The
capacitance-voltage and current- voltage (dark and illumination
current) characterization were measured under different values of
pressure (10-3, 10-4, 10-5) mbar of oxygen gas
Asmari is the main productive reservoir in Abu Ghirab oilfield in the south-east part of Iraq. It has history production extends from 1976 up to now with several close periods. Recently, the reservoir suffers some problems in production, which are abstracted as water production rising with oil production declining in most wells. The water problem type of the field and wells is identified by using Chan's diagnostic plots (water oil ratio (WOR) and derivative water oil ratio (WOR') against time). The analytical results show that water problem is caused by the channeling due to high permeability zones, high water saturation zones, and faults or fracturing. The numerical approach is also used to study the water movement inside the reser
... Show MoreNowadays, cloud computing has attracted the attention of large companies due to its high potential, flexibility, and profitability in providing multi-sources of hardware and software to serve the connected users. Given the scale of modern data centers and the dynamic nature of their resource provisioning, we need effective scheduling techniques to manage these resources while satisfying both the cloud providers and cloud users goals. Task scheduling in cloud computing is considered as NP-hard problem which cannot be easily solved by classical optimization methods. Thus, both heuristic and meta-heuristic techniques have been utilized to provide optimal or near-optimal solutions within an acceptable time frame for such problems. In th
... Show More