Each Intensity Modulated Radiation Therapy (IMRT) plan needs to be tested and verified before any treatment to check its quality. Octavius 4D-1500 phantom detector is a modern and qualified device for quality assurance procedure. This study aims to compare the common dosimetric criteria 3%/3 mm with 2%/2 mm for H&N plans for the IMRT technique. Twenty-five patients with head and neck (H&N) tumor were with 6MV x-ray photon beam using Monaco 5.1 treatment planning software and exported to Elekta synergy linear accelerator then tested for pretreatment verification study using Octavius 4D-1500 phantom detector. The difference between planned and measured dose were assessed by using local and global gamma index (GI) analysis method at threshold 10%. The DD/DTA criteria are performed with 3%/3 mm and 2%/2 mm. A significant difference is shown between the measured and calculated point dose for the treatment plans. A comparison made between the gamma passing rate between the 2%/2 mm and 3%/3 mm shows a significant difference for local and global which shows that the 2%/2 mm are more sensitive to dose variation than 3%/3 mm. The total monitor unit (MU) shows a negative linear relationship with both criteria and %GP types. A significant correlation is shown between the total MU and global %GP at 2%/2 mm criterion. The conclusion of the study indicates that 2%/2 mm criterion is more sensitive to the dose distribution changes than the 3%/3 mm. The total number of monitor units should be taken into consideration during the planning of H&N tumors using the IMRT plans.
A novel demountable shear connector for precast steel-concrete composite bridges is presented. The connector uses high-strength steel bolts, which are fastened to the top flange of the steel beam with the aid of a special locking nut configuration that prevents bolts from slipping within their holes. Moreover, the connector promotes accelerated construction and overcomes the typical construction tolerance issues of precast structures. Most importantly, the connector allows bridge disassembly. Therefore, it can address different bridge deterioration scenarios with minimum disturbance to traffic flow including the following: (1) precast deck panels can be rapidly uplifted and replaced; (2) connectors can be rapidly removed and replaced; and (
... Show MoreIndexes of topological play a crucial role in mathematical chemistry and network theory, providing valuable insights into the structural properties of graphs. In this study, we investigate the Resize graph of G2(3), a significant algebraic structure arising from the exceptional Lie group (G2) over the finite field F3. We compute several well-known topological indices, including the Zagreb indices, Wiener index, and Randić index, to analyze the graph's connectivity and complexity. Our results reveal intricate relationships between the algebraic structure of G2(3) and its graphical properties, offering a deeper understanding of its combinatorial and spectral characteristics. These findings contribute to the broader study of algebraic graph t
... Show MoreStrives Total Productive Maintenance to increase the overall effectiveness of the equipment through the early involvement in the design and manufacture of equipment productivity. It also operates in an environment of simultaneous engineering work on the synchronization of activities to take advantage of early information by maintenance engineers, design, operation, and that helps to reduce the faults and facilitate future maintenance tasks.
Has adopted a search in the theoretical concept of the total maintenance productivity and concurrent engineering activities carried out during which the conjunction a
... Show More