The Planning and Resource Development Department of the Iraqi Ministry of Health is very interested in improving medical care, health education, and village training programs. Accordingly, and through the available capabilities of the ministry, itdesires to allocate seven health centers to four villages in Baghdad, Iraq therefore the ministry needs to determine the number of health centers allocated to each of these villages which achieves the greatest degree of the overall effectiveness of the seven health centers in a fuzzy environment. The objective of this study is to use a fuzzy dynamic programming(DP) method to determine the optimal allocation of these centers, which allows the greatest overall effectiveness of these health centers to be achieved, which is the expected increase in the average life years in the village population in a fuzzy environment. The results of this studyareproved after a real-life problem was solved that the proposed method is an effective mathematical model for making a series of related decisions, and it provides us with a systematic procedure to determine the optimal combination of decisions.
Within that research, we introduce fibrewise fuzzy types of the most important separation axioms in ordinary fuzz topology, namely fibrewise fuzzy (T 0 spaces, T 1 spaces, R 0 spaces, Hausdorff spaces, functionally Hausdorff spaces, regular spaces, completely regular spaces, normal spaces, and normal spaces). Too we add numerous outcomes about it.
The purpose of this research is to show a constructive method
for using known fuzzy groups as building blocks to form more fuzzy
subgroups. As we shall describe employing this procedure with the
fuzzy generating subgroups give us a large class of fuzzy
subgroup of abelian groups which include all fuzzy subgroup of
abelian groups of finite order.
The cost of pile foundations is part of the super structure cost, and it became necessary to reduce this cost by studying the pile types then decision-making in the selection of the optimal pile type in terms of cost and time of production and quality .So The main objective of this study is to solve the time–cost–quality trade-off (TCQT) problem by finding an optimal pile type with the target of "minimizing" cost and time while "maximizing" quality. There are many types In the world of piles but in this paper, the researcher proposed five pile types, one of them is not a traditional, and developed a model for the problem and then employed particle swarm optimization (PSO) algorithm, as one of evolutionary algorithms with t
... Show MoreNowadays, the power plant is changing the power industry from a centralized and vertically integrated form into regional, competitive and functionally separate units. This is done with the future aims of increasing efficiency by better management and better employment of existing equipment and lower price of electricity to all types of customers while retaining a reliable system. This research is aimed to solve the optimal power flow (OPF) problem. The OPF is used to minimize the total generations fuel cost function. Optimal power flow may be single objective or multi objective function. In this thesis, an attempt is made to minimize the objective function with keeping the voltages magnitudes of all load buses, real outp
... Show MoreLand use change, particularly the expansion of urban areas and associated human activities at the expense of natural and semi-natural areas, is a major ecological issue in urban areas around the world. Climate change being a very strong additional driver for changing the temperature and habitat in the cities. This also applies to Baghdad, Iraq, where urbanisation and climate change exerts a major pressure on the natural habitats of the city, and thus may affect the ability of city planners to adapt to future climate change scenarios. Here we present evidence of substantial growth in urban areas, increases in temperature, and degradation of natural vegetation within Baghdad city by using Remote Sensing techniques and an assessment for the
... Show MoreIn this paper, variable gain nonlinear PD and PI fuzzy logic controllers are designed and the effect of the variable gain characteristic of these controllers is analyzed to show its contribution in enhancing the performance of the closed loop system over a conventional linear PID controller. Simulation results and time domain performance characteristics show how these fuzzy controllers outperform the conventional PID controller when used to control a nonlinear plant and a plant that has time delay.
In this paper, variable gain nonlinear PD and PI fuzzy logic controllers are designed and the effect of the variable gain characteristic of these controllers is analyzed to show its contribution in enhancing the performance of the closed loop system over a conventional linear PID controller. Simulation results and time domain performance characteristics show how these fuzzy controllers outperform the conventional PID controller when used to control a nonlinear plant and a plant that has time delay.
The current study aimed to isolate and diagnose Candida spp yeasts that cause candidiasis with a PCR device from patients reviewed for some hospitals in Baghdad city and by 190 samples, the study recorded 123 isolates and the total percentage of infection was 64.7% .Samples were taken from different clinical cases of the vagina, blood and mouth and the Candida spp were (70.37%, 41.26%, 86.95%) respectively. Five types of yeasts were isolated and diagnosed, namely C. albicans, C. tropicalis, C. parapsilosis, C. krusei and C.glabarta. They were confirmed by PCR device and the most notable were yeast C. albicans, where 91 isolates were found, 73.98%, while the lowest infection was recorded. C.glabartawith 3 isolates, at 2.43%, significant diff
... Show More