Aqueous extract of poppy plant) Papaver nudicaule) with five concentrations (50, 100, 150, 200 and 250) mg/l were used to anesthetize fingerlings of the common carp Cyprinus carpio (Mean total length 8.91 ± 0.31 cm and mean total weight 7.72 ± 1.19 gm) instead of the traditional use of MS-222. Results showed that extracted solution of poppy have partial and overall anesthesia effect on these fishes with inverse relationship between the concentrations used and the time needed to reach partial and overall anesthesia, and also direct relationship between concentrations used and time needed for fish recovery. Best results were obtained by using a concentration of 250 mg/l, where time for partial anesthesia was 8 ± 1.52 min., time for overall anesthesia was 10 ± 1.70 min., time needed for partial recovery was 25 ± 2.43 min. and time needed for overall recovery was 35 ± 2.23 min. Fish behavior observations revealed a difference ranging from slow swimming with increasing in breathing rates movements to vertical swimming near the surface, then laying at bottom and too much decrease in breathing rates movements. Results appeared that there were no significant differences (p≥0.01) between glucose concentration in fish blood plasma after recovery and control fishes. So it was concluded that these. The results showed also that there were no significant differences (p≥0.01) in ALP, AST, ALT, LDH and CK among fishes after recovery comparing with the control fishes. Experimental fishes exhibited no stress during anesthesia by using poppy extracted solution. This indicated that the treated fishes exhibited no physiological effects stress which might lead to poor health condition later. The study demonstrated that poppy can be used as an effective anesthetic, as we obtained acceptable induction and recovery times. The poppy can be recommended as suitable anesthetics for fishes (200 or 250 mg/l).
The study consisted in the development and use of a practical method to detect and
monitor, analyze and produce maps of changes in land use and land cover in the district of
Mahmudiya in Baghdad during the period 1990-2007 using the applications of remote sensing
techniques and with the assisstant of geographic information systems (GIS),as a valuable
contribution to land degradation studies.
This study is based maiuly on the processing on two subsets of landsat5 TM images picked up
in August 1990 and 2007 respectively in order to facilitate comparision and were thengeometrically and radiometrcally calibrated ,to used for digital classification purposes using
maximum liklihoods classification or six spectral bands of
In this work, a deep computational study has been conducted to assign several qualities for the graph . Furthermore, determine the amount of the dihedral subgroups in the Held simple group He through utilizing the attributes of gamma.
Abstract:
The current research aims to distinguish the talent for the kindergarten
children and its relation with some changes . The research included ( 170 )
child (male , female ) from the kindergarten children on the year 2009 – 2010
the researcher had used PRED meter to achieve the goals of this research
after being sure from the honesty and the prove and the ( person ) connection
coefficient had been used to discover the relation between the talent and the
changes which had been mentioned in the research . The result proved that
the children had talents the toys and the educational scientifically scholarship
finally the researcher had presented some recommendations and suggestions
for other studies .<
Effective decision-making process is the basis for successfully solving any engineering problem. Many decisions taken in the construction projects differ in their nature due to the complex nature of the construction projects. One of the most crucial decisions that might result in numerous issues over the course of a construction project is the selection of the contractor. This study aims to use the ordinal priority approach (OPA) for the contractor selection process in the construction industry. The proposed model involves two computer programs; the first of these will be used to evaluate the decision-makers/experts in the construction projects, while the second will be used to formul
This paper is attempt to study the nonlinear second order delay multi-value problems. We want to say that the properties of such kind of problems are the same as the properties of those with out delay just more technically involved. Our results discuss several known properties, introduce some notations and definitions. We also give an approximate solution to the coined problems using the Galerkin's method.
The main objective of this paper is to determine an acceptable value of eccentricity for the satellites in a Low Earth Orbit LEO that are affected by drag perturbation only. The method of converting the orbital elements into state vectors was presented. Perturbed equation of motion was numerically integrated using 4th order Runge-Kutta’s method and the perturbation in orbital elements for different altitudes and eccentricities were tested and analysed during 84.23 days. The results indicated to the value of semi major axis and eccentricity at altitude 200 km and eccentricity 0.001are more stable. As well, at altitude 600 km and eccentricity 0.01, but at 800 km a
This paper is focused on orthogonal function approximation technique FAT-based adaptive backstepping control of a geared DC motor coupled with a rotational mechanical component. It is assumed that all parameters of the actuator are unknown including the torque-current constant (i.e., unknown input coefficient) and hence a control system with three motor control modes is proposed: 1) motor torque control mode, 2) motor current control mode, and 3) motor voltage control mode. The proposed control algorithm is a powerful tool to control a dynamic system with an unknown input coefficient. Each uncertain parameter/term is represented by a linear combination of weighting and orthogonal basis function vectors. Chebyshev polynomial is used
... Show MoreSheet piles are necessary with hydraulic structures as seepage cut-off to reduce the seepage. In this research, the computational work methodology was followed by building a numerical model using Geo-Studio program to check the efficiency of using concrete sheet piles as a cut-off or reducer for seepage with time if the sheet piles facing the drawdown technique. Al-Kifil regulator was chosen as a case study, an accurate model was built with a help of observed reading of the measuring devices, which was satisfactory and helped in checking the sheet piles efficiency. Through the study, three scenarios were adopted (with and without) drawdown technique, it was found that at the short time there's no effect of the drawdown technique on
... Show More