Preferred Language
Articles
/
bsj-4776
Fuzzy Real Pre-Hilbert Space and Some of Their Properties
...Show More Authors

In this work, two different structures are proposed which is fuzzy real normed space (FRNS) and fuzzy real Pre-Hilbert space (FRPHS). The basic concept of fuzzy norm on a real linear space is first presented to construct  space, which is a FRNS with some modification of the definition introduced by G. Rano and T. Bag. The structure of fuzzy real Pre-Hilbert space (FRPHS) is then presented which is based on the structure of FRNS. Then, some of the properties and related concepts for the suggested space FRN such as -neighborhood, closure of the set  named , the necessary condition for separable, fuzzy linear manifold (FLM) are discussed. The definition for a fuzzy seminorm on  is also introduced with the prove that a fuzzy seminorm on  is FRNS. The relationship between the -convergent sequence, -Cauchy sequence and -completeness is then investigated in this work. The structure of FRPHS with some important properties concerning on this space are introduced and proved. In addition, the property of orthogonality with some important properties for these spaces is included, for example the annihilator of the set . The relation between FRPHS and FRNS is investigated in the present work. Finally, after introducing the structure of FRPHS, it leads naturally to the definition of the most important class of FRPHS, namely the fuzzy real Hilbert space (FRHS).

Scopus Clarivate Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Tue Jun 01 2021
Journal Name
Int. J. Nonlinear Anal. Appl.
Some types of fibrewise fuzzy topological spaces
...Show More Authors

The aim of this paper is to introduce and study the notion type of fibrewise topological spaces, namely fibrewise fuzzy j-topological spaces, Also, we introduce the concepts of fibrewise j-closed fuzzy topological spaces, fibrewise j-open fuzzy topological spaces, fibrewise locally sliceable fuzzy j-topological spaces and fibrewise locally sectionable fuzzy j-topological spaces. Furthermore, we state and prove several Theorems concerning these concepts, where j = {δ, θ, α, p, s, b, β}.

Scopus (1)
Scopus Clarivate
Publication Date
Sun Dec 16 2018
Journal Name
Al-academy
Graphic Design and Functional Applications in the Interior Space
...Show More Authors

The overlap between science and knowledge is a feature of the 21st century. This integration, which crosses the traditional boundaries between academic disciplines, has occurred because of the emergence of new needs and new professions. This overlap has overshadowed the arts in general and design in particular. The Design achievements have not been far away from the attempts of integration of more than one type or design application to produce new outputs unique in its functional and aesthetic character, including the terms of internal graphic design.

The researcher raises the question of the functional dimension of graphic design in the internal space, in order to answer it through the methodological framework, which includes th

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Aug 01 2018
Journal Name
Journal Of Economics And Administrative Sciences
A Study on Transportation Models in Their Minimum and Maximum Values with Applications of Real Data
...Show More Authors

The purpose of this paper is to apply different transportation models in their minimum and maximum values by finding starting basic feasible solution and finding the optimal solution. The requirements of transportation models were presented with one of their applications in the case of minimizing the objective function, which was conducted by the researcher as real data, which took place one month in 2015, in one of the poultry farms for the production of eggs

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Jul 01 2020
Journal Name
Journal Of Engineering
Using Adaptive Neuro Fuzzy Inference System to Predict Rate of Penetration from Dynamic Elastic Properties
...Show More Authors

Rate of penetration plays a vital role in field development process because the drilling operation is expensive and include the cost of equipment and materials used during the penetration of rock and efforts of the crew in order to complete the well without major problems. It’s important to finish the well as soon as possible to reduce the expenditures. So, knowing the rate of penetration in the area that is going to be drilled will help in speculation of the cost and that will lead to optimize drilling outgoings. In this research, an intelligent model was built using artificial intelligence to achieve this goal.  The model was built using adaptive neuro fuzzy inference system to predict the rate of penetration in

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Aug 01 2022
Journal Name
مجلة الرافدين للعلوم الرياضية
Fartlek exercises and their effect on molecular biology (vascular endothelial growth factor-basic fibroblast growth factor) and some physical variables for players 800m arena and field for youth
...Show More Authors

The study aimed to : - To determine whether there are significant differences between Fartlek training and the increase in the molecular biology (VEGF - basal fibroblast growth factor) for arena and field players in an (800m) youth event. - Determine whether there are statistically significant differences between Fartlek training and the increase in molecular biology and some physical variables for the players (800m) in the arena and field for youth. - Determine whether the Fartlek training method is the most appropriate to achieve statistically significant differences in the research variables for the players (800m) in the arena and field for youth. The researchers used the experimental method for its suitability and the nature of the rese

... Show More
Publication Date
Tue Apr 01 2014
Journal Name
Journal Of Economics And Administrative Sciences
Employment programming fuzzy goal in medical field
...Show More Authors

The aim of this study is to use style programming goal and technical programming goal fuzzy to study assessing need annual accurately and correctly depending on the data and information about the quantity the actual use of medicines and medical supplies in all hospitals and health institutions during a certain period where they were taking the company public for the marketing of medicines and medical supplies sample for research. Programming model was built goal to this problem, which included (15) variable decision, (19) constraint and two objectives:

1 - rational exchange of budget allocated for medicines and supplies.
2 - ensure that the needs of patients of medicines and supplies needed to improve

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Nov 01 2023
Journal Name
Journal Of Interdisciplinary Mathematics
Interval valued fuzzy ideals of TM-algebra
...Show More Authors

We introduce the notion of interval value fuzzy ideal of TM-algebra as a generalization of a fuzzy ideal of TM-algebra and investigate some basic properties. Interval value fuzzy ideals and T-ideals are defined and several examples are presented. The relation between interval value fuzzy ideal and fuzzy T-ideal is studied. Abstract We introduce the notion of interval value fuzzy ideal of TM-algebra as a generalization of a fuzzy ideal of TM-algebra and investigate some basic properties. Interval value fuzzy ideals and T- ideals are defined and several examples are presented. The relation between interval value fuzzy ideal and fuzzy T-ideal is studied.

Scopus (1)
Scopus Clarivate Crossref
Publication Date
Wed Sep 01 2021
Journal Name
Baghdad Science Journal
Fuzzy-assignment Model by Using Linguistic Variables
...Show More Authors

      This work addressed the assignment problem (AP) based on fuzzy costs, where the objective, in this study, is to minimize the cost. A triangular, or trapezoidal, fuzzy numbers were assigned for each fuzzy cost. In addition, the assignment models were applied on linguistic variables which were initially converted to quantitative fuzzy data by using the Yager’sorankingi method. The paper results have showed that the quantitative date have a considerable effect when considered in fuzzy-mathematic models.

View Publication Preview PDF
Scopus (6)
Crossref (2)
Scopus Clarivate Crossref
Publication Date
Tue Sep 08 2020
Journal Name
Baghdad Science Journal
Evaluation of Different Nitrogen Management on Yield and Some of the Yield Components of Rice (Shiroudi cultivar)
...Show More Authors

Nitrogen (N) is a key growth and yield-limiting factor in cultivated rice areas. This study has been conducted to evaluate the effects of different conditions of N application on rice yield and yield components (Shiroudi cultivar) in Babol (Mazandaran, Iran) during the 2015- 2016 season. A factorial experiment executed of a Randomized Complete Block Design (RCBD) used in three iterations. In the first factor, treatments were four N amounts (including 50, 90, 130, and 170 kg N ha-1), while in the second factor, the treatments consisted of four different fertilizer splitting methods, including T1:70 % at the basal stage + 30 % at the maximum tillering stage, T2:1/3 at the basal stage + 1/3 at the maximum ti

... Show More
View Publication Preview PDF
Scopus (1)
Scopus Clarivate Crossref
Publication Date
Sun Feb 01 2015
Journal Name
Journal Of Economics And Administrative Sciences
Reliability Estimation Of Fuzzy Failure Times Of Free Distribution And It Use To Estimate The Fuzzy Reliability Of Mosul Dam
...Show More Authors

The way used to estimate the fuzzy reliability differs according to the nature of the information of failure time which has been dealt in this research.The information of failure times has no probable distribution to explain it , in addition it has fuzzy quality.The research includes fuzzy reliability estimation of three periods ,the first one from 1986 to 2013,the second one from 2013 to 2033 while the third one from 2033 to 2066 .Four failure time have been chosen to identify the membership function of fuzzy trapezoid represented in the pervious years after taking in consideration the estimation of most researchers, proffional    geologists and the technician who is incharge of maintaining of Mosul Dam project. B

... Show More
View Publication Preview PDF
Crossref