To ensure fault tolerance and distributed management, distributed protocols are employed as one of the major architectural concepts underlying the Internet. However, inefficiency, instability and fragility could be potentially overcome with the help of the novel networking architecture called software-defined networking (SDN). The main property of this architecture is the separation of the control and data planes. To reduce congestion and thus improve latency and throughput, there must be homogeneous distribution of the traffic load over the different network paths. This paper presents a smart flow steering agent (SFSA) for data flow routing based on current network conditions. To enhance throughput and minimize latency, the SFSA distributes network traffic to suitable paths, in addition to supervising link and path loads. A scenario with a minimum spanning tree (MST) routing algorithm and another with open shortest path first (OSPF) routing algorithms were employed to assess the SFSA. By comparison, to these two routing algorithms, the suggested SFSA strategy determined a reduction of 2% in packets dropped ratio (PDR), a reduction of 15-45% in end-to-end delay according to the traffic produced, as well as a reduction of 23% in round trip time (RTT). The Mininet emulator and POX controller were employed to conduct the simulation. Another advantage of the SFSA over the MST and OSPF is that its implementation and recovery time do not exhibit fluctuations. The smart flow steering agent will open a new horizon for deploying new smart agents in SDN that enhance network programmability and management.
Abstract
This Research aims for harnessing critical and innovative thinking approaches besides innovative problem solving tools in pursuing continual quality improvement initiatives for the benefit of achieving operations results effectively in water treatment plants in Baghdad Water Authority. Case study has been used in fulfilling this research in the sadr city water treatment plant, which was chosen as a study sample as it facilitates describing and analyzing its current operational situation, collecting and analyzing its own data, in order to get its own desired improvement opportunity be done. Many statistical means and visual thinking promoting methods has been used to fulfill research task.
... Show MoreThis paper features the modeling and design of a pole placement and output Feedback control technique for the Active Vibration Control (AVC) of a smart flexible cantilever beam for a Single Input Single Output (SISO) case. Measurements and actuation actions done by using patches of piezoelectric layer, it is bonded to the master structure as sensor/actuator at a certain position of the cantilever beam.
The smart structure is modeled based on the concept of piezoelectric theory, Bernoulli -Euler beam theory, using Finite Element Method (FEM) and the state space techniques. The number of modes is reduced using the controllability and observability grammians retaining the first three
dominant vibratory modes, and for the reduced syste
Numerous regions in the city of Baghdad experience the congestion and traffic problems. Due to the religious and economic significance, Al-Kadhimiya city (inside the metropolitan range of Baghdad) was chosen as study area. The data gathering stage was separated into two branches: the questionnaire method which is utilized to estimate the traffic volumes for the chosen roads and field data collection method which included video recording and manual counting for the volumes entering the selected signal intersections. The stage of analysis and evaluation for the seventeen urban roads, one highway, and three intersections was performed by HCS-2000 software.The presented work plots a system for assessing the level of service
... Show MoreThis paper presents the results of experimental investigations to predict the bearing capacity of square footing on geogrid-reinforced loose sand by performing model tests. The effects of several parameters were studied in order to study the general behavior of improving the soil by using the geogrid. These parameters include the eccentricity value, depth of first layer of reinforcement, and vertical spacing of reinforcement layers. The results of the experimental work indicated that there was an optimum reinforcement embedment depth at which the bearing capacity was the highest when single-layer reinforcement was used. The increase of (z/B) (vertical spacing of reinforcement layer/width of footing) above 1.5 has no effect on the re
... Show MoreThe current research discusses "The Relationship critical factors for knowledge transfer in strategic success opportunities", the attention have been increased on knowledge transfer and strategic success subjects because on being one of the important and contemporary issues, which have a significant impact on the existence of organizations and its future. The research aims to identify the critical factors for knowledge transfer in private high education environment which enables (the college community surveyed) to achieve strategic success, also the research sought to answer questions related to research problem by testing a number of major and minor hypothes in correlation, in order to test the hypotheses I us
... Show Moreملخص البحث
تبحث الدراسھ عن تنفیذ افضل لمفھوم التعلم مدى الحیاة كھیكل موجھ للسیاسة التربویة في العراق بشكل عام وفي
التعلیم العالي بشكل خاص. تحدد الدراسة استراتجیات التعلم مدى الحیاة وتناقش اھمیتھ وسماتھ الرئیسیة لتسھیل
الوصول الى فرص تعلم متمیز و ملائم لحاجات الطلبة مدى الحیاة، كما تناقش دور الجامعة في تحقیق ھذا الھدف.
Research on the role of organizational change in easing the organizational conflict focuses for being one of the important topics and relatively modern and which have a significant impact on the future of organizations, so this study was to identify the relationship and the impact of organizational change and of deportation (technological, organizational structure, human resources, the change in the task) at the organizational conflict in the Earth company link Iraq, in order to reach the goals of the research, it has been the development of a questionnaire distributed to a random sample of (100) composed employees from managers and heads of departments and the people and staff at the Earth company link Iraq, the study found: the
... Show MoreDelays occur commonly in construction projects. Assessing the impact of delay is sometimes a contentious
issue. Several delay analysis methods are available but no one method can be universally used over another in
all situations. The selection of the proper analysis method depends upon a variety of factors including
information available, time of analysis, capabilities of the methodology, and time, funds and effort allocated to the analysis. This paper presents computerized schedule analysis programmed that use daily windows analysis method as it recognized one of the most credible methods, and it is one of the few techniques much more likely to be accepted by courts than any other method. A simple case study has been implement