Preferred Language
Articles
/
bsj-4033
Improved throughput of Elliptic Curve Digital Signature Algorithm (ECDSA) processor implementation over Koblitz curve k-163 on Field Programmable Gate Array (FPGA)
...Show More Authors

            The widespread use of the Internet of things (IoT) in different aspects of an individual’s life like banking, wireless intelligent devices and smartphones has led to new security and performance challenges under restricted resources. The Elliptic Curve Digital Signature Algorithm (ECDSA) is the most suitable choice for the environments due to the smaller size of the encryption key and changeable security related parameters. However, major performance metrics such as area, power, latency and throughput are still customisable and based on the design requirements of the device.

The present paper puts forward an enhancement for the throughput performance metric by proposing a more efficient design for the hardware implementation of ECDSA. The design raised the throughput to 0.08207 Mbit/s, leading to an increase of 6.95% from the existing design. It also includes the design and implementation of the Universal Asynchronous Receiver Transmitter (UART) module. The present work is based on a 163-bit key-size over Koblitz curve k-163 and secure hash function SHA-1. A serial module for the underlying modular layer, high-speed architecture of Koblitz point addition and Koblitz point multiplication have been considered in this work, in addition to utilising the carry-save-multiplier, modular adder-subtractor and Extended Euclidean module for ECDSA protocols. All modules are designed using VHDL and implemented on the platform Virtex5 xc5vlx155t-3ff1738. Signature generation requires 0.55360ms, while its validation consumes 1.10947288ms. Thus, the total time required to complete both processes is equal to 1.66ms and the maximum frequency is approximately 83.477MHZ, consuming a power of 99mW with the efficiency approaching 3.39 * 10-6.

Scopus Clarivate Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Tue May 16 2023
Journal Name
Journal Of Engineering
System Identification Algorithm for Systems with Interval Coefficients
...Show More Authors

In this research a new system identification algorithm is presented for obtaining an optimal set of mathematical models for system with perturbed coefficients, then this algorithm is applied practically by an “On Line System Identification Circuit”, based on real time speed response data of a permanent magnet DC motor. Such set of mathematical models represents the physical plant against all variation which may exist in its parameters, and forms a strong mathematical foundation for stability and performance analysis in control theory problems.

View Publication Preview PDF
Crossref
Publication Date
Thu Sep 26 2019
Journal Name
Processes
Fine-Tuning Meta-Heuristic Algorithm for Global Optimization
...Show More Authors

This paper proposes a novel meta-heuristic optimization algorithm called the fine-tuning meta-heuristic algorithm (FTMA) for solving global optimization problems. In this algorithm, the solutions are fine-tuned using the fundamental steps in meta-heuristic optimization, namely, exploration, exploitation, and randomization, in such a way that if one step improves the solution, then it is unnecessary to execute the remaining steps. The performance of the proposed FTMA has been compared with that of five other optimization algorithms over ten benchmark test functions. Nine of them are well-known and already exist in the literature, while the tenth one is proposed by the authors and introduced in this article. One test trial was shown t

... Show More
View Publication Preview PDF
Scopus (26)
Crossref (23)
Scopus Clarivate Crossref
Publication Date
Mon Oct 01 2018
Journal Name
Journal Of Economics And Administrative Sciences
Nurse Scheduling Problem Using Hybrid Simulated Annealing Algorithm
...Show More Authors

Nurse scheduling problem is one of combinatorial optimization problems and it is one of NP-Hard problems which is difficult to be solved as optimal solution. In this paper, we had created an proposed algorithm which it is hybrid simulated annealing algorithm to solve nurse scheduling problem, developed the simulated annealing algorithm and Genetic algorithm. We can note that the proposed algorithm (Hybrid simulated Annealing Algorithm(GS-h)) is the best method among other methods which it is used in this paper because it satisfied minimum average of the total cost and maximum number of Solved , Best and Optimal problems. So we can note that the ratios of the optimal solution are 77% for the proposed algorithm(GS-h), 28.75% for Si

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Jun 06 2024
Journal Name
Journal Of Applied Engineering And Technological Science (jaets)
Lightweight Block and Stream Cipher Algorithm: A Review
...Show More Authors

Most of the Internet of Things (IoT), cell phones, and Radio Frequency Identification (RFID) applications need high speed in the execution and processing of data. this is done by reducing, system energy consumption, latency, throughput, and processing time. Thus, it will affect against security of such devices and may be attacked by malicious programs. Lightweight cryptographic algorithms are one of the most ideal methods Securing these IoT applications. Cryptography obfuscates and removes the ability to capture all key information patterns ensures that all data transfers occur Safe, accurate, verified, legal and undeniable.  Fortunately, various lightweight encryption algorithms could be used to increase defense against various at

... Show More
View Publication
Scopus Crossref
Publication Date
Mon Apr 24 2017
Journal Name
Ibn Al-haitham Journal For Pure And Applied Sciences
Adaptive Canny Algorithm Using Fast Otsu Multithresholding Method
...Show More Authors

   In this research, an adaptive Canny algorithm using fast Otsu multithresholding method is presented, in which fast Otsu multithresholding method is used to calculate the optimum maximum and minimum hysteresis values and used as automatic thresholding for the fourth stage of the Canny algorithm.      The new adaptive Canny algorithm and the standard Canny algorithm (manual hysteresis value) was tested on standard image (Lena) and satellite image. The results approved the validity and accuracy of the new algorithm to find the images edges for personal and satellite images as pre-step for image segmentation.  
 

View Publication Preview PDF
Publication Date
Fri Apr 01 2022
Journal Name
Symmetry
Fast Overlapping Block Processing Algorithm for Feature Extraction
...Show More Authors

In many video and image processing applications, the frames are partitioned into blocks, which are extracted and processed sequentially. In this paper, we propose a fast algorithm for calculation of features of overlapping image blocks. We assume the features are projections of the block on separable 2D basis functions (usually orthogonal polynomials) where we benefit from the symmetry with respect to spatial variables. The main idea is based on a construction of auxiliary matrices that virtually extends the original image and makes it possible to avoid a time-consuming computation in loops. These matrices can be pre-calculated, stored and used repeatedly since they are independent of the image itself. We validated experimentally th

... Show More
View Publication
Scopus (23)
Crossref (19)
Scopus Clarivate Crossref
Publication Date
Wed Oct 02 2013
Journal Name
Journal Of The College Of Basic Education
Excess parameters of binary mixtures of tetrahydrofurfuryl alcohol with cyclopentanol and 1-pentanol at (293.15, 303.15 and 313.15 K)
...Show More Authors

Publication Date
Sun Jan 01 2017
Journal Name
Journal Of Engineering
Evaluation of Textile Filter in Field Drains
...Show More Authors

The role of drain in agricultural lands is to remove excess surface and subsurface water to create a good environment for root growth and to increase crops yield. The main objective of this research was to evaluate the performance of closed drains when using textile filter instead of crushed gravel filter. The research has been executed in the laboratory using a sand tank model and by using two types of the soil. One of soils was light soil (sandy soil) and the other heavy soil (loamy soil). The tests were classified into four cases; each case was supplied discharge during 10 days. The results showed that the amount of out flow when using graded crushed gravel filter is greater than the amount of out flow in case of usin

... Show More
View Publication Preview PDF
Publication Date
Wed Nov 01 2017
Journal Name
Journal Of Economics And Administrative Sciences
The Entrepreneurial Performance of an organization in Accordance with Green Human Resources Management C A field Research in Iraq Drilling Company
...Show More Authors

              The research aims to determine the role of green human resource management dimensions of (employment Green, training and development, green, performance evaluation Green, compensation and green bonuses) in the performance leadership of the organization dimensions of (advance planning, efficiency, effectiveness, index pioneering, renovation and modernization), Search of paramount importance because it addresses an important and modern issue in performance leadership, namely green management of human resources, aware of the importance of the subject and expected results of the company under study, an analysis of the data obtained through field visits in

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Aug 01 2016
Journal Name
Journal Of Engineering
Performance Evaluation of the Investment Projects during the Implementation Phase (Najaf province as a case study)
...Show More Authors

The construction project is a very complicated work by its nature and requires specialized knowledge to lead it to success. The construction project is complicated socially, technically and economically in its planning, management and implementation aspects due to the fact that it has many variables and multiple stakeholders in addition to being affected by the surrounding environment. Successful projects depend on three fundamental points which are cost-time, performance and specifications. The project stakeholder's objective to achieve best specifications and the cost-time frame stipulated in the contract.

The question is, was the optimum implementation accomplished? The provision for the success of the project

... Show More
View Publication Preview PDF